Kumar Govind Jee
E Mail:************@*******.***
Mobile: +91-767*******
In quest of challenging assignments in the domain of Mechanical Engineering with an organization of high
reputation.
ACADEMIA
2011 Bachelor of Technology in Mechanical Engineering with First Class from MJRP College. Of
Engineering, Jaipur.
2006 12th from (BIHAR Board), GM COLLEGE, Secured 61.20 % marks
2003 10th from (BIHAR Board), GDHS, Secured 57.28% marks.
Professional Experience
2 years 1 months of total exp. In which worked in coal fired power plant in CHP as Mechanical Engineer. Excellent
knowledge of maintenance of Coal Handling Plant.
CURRENT COMPANY
Working with AKA LOGISTICS PRIVATE LIMITED as Mechanical In charge in Coal Handling Plant of Durgapur
Steel Thermal Power Station (DVC), (2*500MW), Durgapur (W. B.) from 17th Aug 2012 to till Date.
• Job Responsibility
1. Reporting to site In Charge.
2. Preventive and breakdown Maintenance of Conveyor system, Stacker Cum Reclaimer, Paddle Feeder, Wagon
Trippler, Side Arm Charger, Tripper trolley, Fluid Coupling, Scoop Coupling, vibrating equipments, Ring
Granulators, Roller screen, Truflo Screen.
3. Manpower Management, Documentation of daily progress, spares etc.
4. Leading a team of approx 10 operation Engineers, 20 place operators and 50 maintenance personals including
6 supervisors and 10 I.T.I. technicians.
PREVIOUS COMPANY
1. Worked with Shri Narayan Construction Company, subcontractor of TRF LTD (A TATA Enterprise) as a Shift In
charge at Parichha Thermal Power Plant, Coal Handling Division (2*210MW, 2*250MW), Jhansi from 8 th Aug 2011 to
16 Aug 2012.
• Job Responsibility
1. To run over all Maintenance through the shift.
2. Preventive and breakdown Maintenance of Conveyor system, Wagon Tippler, Side Arm Charger, Fluid
Coupling, Scoop Coupling, vibrating equipment, crusher, truflo Screen, Stacker Reclaimer.
3. Leading a team of approx 12 operation Engineers, 30 place operators and 70 maintenance personals including 6
supervisors and 10 I.T.I. technicians.
2. Worked as Shift In charge in Adecco Workforce solution from 30 June to 6 august.
Projects Handled
1. Refurbishment of entire coal handling plant of PTPP, Jhansi. During 6 months of refurbishment period we
have changed 6 no of conveyor changed by cold joint process(2400 m. ), Approx 3400 idler roller(carrying
& return), 400 impact, 700 frame(carrying & return) has been changed. All 4 ring granulator’s rotor shaft
with suspension arm, end disc, chuck nut, Bearing, Plumber block, Cage frame, breaker plates, kick up
plates, and liner plates also chaged. Unbalanced shafts of truflo screen changed with matching gears.3 no of
scoop coupling changed. Repairing of both Slewing gear box of stacker reclaimer. All receiving and discharge
chute’s mother plate changed with liner plate. Scrapper installed at head end and tail end of all conveyors.
We have supplied 15000 MT/day of coal to the bunkers.
2. O&M of DSTPS, Andal, in this plant we have shortened length of all conveyors by hot jointing process, 3 nos
of Ckb 280 gear box has been changed, 2 no of HFDX 8B fluid coupling changed, 2 nos of conv. Changed. We
have supplied 12000Mt/day to the bunkers.
IT KNOW HOW
Utilities: MS Office 2003, 2007 & 2010 (Word, Excel and PowerPoint)
Environment: Windows XP / Windows 98, Vista, Win 7.
STRENGTHS
• Result Oriented.
• Smart & Committed working.
• Strong belief in Teamwork.
• Ability to manage time and stress efficiently.
Current CTC
2.16 lakh
Expected CTC
Negotiable
PERSONAL DOSSIER
Date of Birth : 5th March 1987
Address : S/o Dr. D. K. Sharma, Mitra Chowk,
Bettiah, West champaran, Bihar 845438
Languages Known : English, Hindi
DECLARATION
I hereby declare that the above mentioned information is true to the best of my knowledge.
DATE: 02/08/2013
KUMAR GOVIND
PLACE: Andal
JEE