I am Graduate in Chemical Engineering (65.57%)

under Distance Education from JRN Rajasthan Vidyapeeth University Udaipur,

Rajasthan & Diploma in Chemical Engineering First Class with Honors

(83.67%) under Uttar Pradesh Technical Board of Education.

I have 13 years' experience (7 years Domestic & 06

years overseas).Presently working as a Senior Operator at Inlet Receiving

and Condensate Stabilizing Unit in Qatar Gas Operating Company, Qatar since

May 2008. I had worked as a Refinery Operator (Control Room Operator) at

Fluidized Catalytic Cracking unit in Chennai Petroleum Corporation Limited,

Chennai, India.

I have participated actively in the Pre-commissioning and

commissioning activities of HOFCC unit, LNG Expansion Project Inlet

Receiving and Condensate Stabilizing Unit & Revamping experience in 2nd

stream of FCC unit. A detailed BIO-DATA is also enclosed herewith.

I look forward for your call for the above-mentioned post

and give me an opportunity

to serve your esteemed organization.

Thanking you,

Place: Doha, Qatar

Yours sincerely

Navneet Kumar

CURRICULUM - VITAE

Experience Details -

< Presently working as a Senior Operator since 31st May 2008 at Inlet

Receiving and Condensate Stabilizing Unit in Qatar Gas Operating

Company World largest Premier LNG Supplier, Ras Laffan Industrial

City, Qatar.

< 07 month experience as a Refinery Operator from 28th Sep 2007 to 14th

May 2008 in Pre-Commissioning & Commissioning stage at World Largest

HOFCC Unit dedicated to Petrochemical (Stone & Webster DCC Technology)

at Rabigh Refining & Petrochemical Co. Saudi Arabia (Joint Venture of

Saudi Aramco & Sumitomo Corp. Japan).

< 53 month experience DCS (Yokogawa CS-3000) as a Refinery Operator

(Control Room Operator) from 23rd April 2003 to 13th Sep.2007 in FCCU

Complex (UOP Technology USA) at Chennai Petroleum Corp. Ltd. Chennai,

India.

< 33 month experience as a Process Operator from 06th July 2000 to 14th

April 2003 in Di-Ammonium Phosphate Unit (Capacity 142X3 TPH) in World

largest Grassroot fertilizer complex Oswal Chemicals & Fertilizers

Ltd. Paradeep, Orissa. I have DCS (ABB-Freelance-2000).

Work Experience -

Exposure in Pre-Commissioning & Commissioning -

< Having exposure in Pre-commissioning & Commissioning of Inlet

Receiving and Condensate Stabilizing Unit, High Olefin Fluidized

Catalytic Cracking Unit.

< Activities like Punching, Loop checking, Leak test, Hydro test, System

integrity test, Steam blowing, Chemical cleaning, Catalyst loading,

Instrument loop checking, Functional test &Logic tests.

< Having exposure to prepare Procedures for initial start-up, Emergency

shut-down & Changeover of equipment's & Prepare Portfolio wise Log

sheet to maintain daily activities record & parameters.

Exposure in Panel/DCS Operation -

< Monitors and coordinates the process parameters through DCS Yokogawa

CS-3000 backed by advanced process controller DMC+ software and safe

shutdown systems TRYCONICS and HIMA PLC at FCC Unit & DCS (ABB-

Freelance 2000) at DAP Unit, Ensuring safe and efficient operations.

Includes maintaining continuous contact with various areas of the

entire Plant to keep them informed of overall operating conditions.

< Emergency handling in FCCU/PRU. Safe start-up & Shut-down of unit &

major equipment like Main Air Blower, Wet Gas Compressor, Main column

Bottom circuits, Flue gas cooler, Pilot & main burners, Steam

Generators, Catalyst loading & off loading

< Having experience in Caustic Regeneration, Mercaptan extraction &

hydrogenation, C2 Contaminant Removal, MAPD & C4 hydrogenation,

THIOLEXSM and Merichem system.

< Alters operating conditions or product flows to allow prior isolation

of equipment for maintenance and re-commences operations, following

completion of maintenance. Keeps aware of ongoing maintenance work by

reviewing permit to work records/logs.

Exposure as Senior Operator -

< Ensure that all the plant operational activities, start-ups and

shutdowns are carried out safely as per the SOPs and Proper deployment

of all resources to achieve the production target.

< Ensures preparation of equipment for hand-over to maintenance as per

the maintenance plan with proper safety permit. Supervision of

maintenance activities carried out during the shift.

< Take charge of plant emergency situations and give

instructions/guidelines to operators to overcome the plant emergency

situations

< Data Work: Preparing Daily, weekly & monthly Report. Following the

scheduled checklist of equipments, PRVs, Safety items, Steam Traps.

< Implementing modification in equipments, process flow, working

practices, consumables etc. for controlling & reducing conversion cost

per unit produced.

Key Skills & Core Competencies -

V Active listening to minute details

V Logical and critical thinking

V Complex problem solving

V Ability to work in high stress environment

V Knowledge of chemical composition and structure

V Good coordination with other departments

Experience Profile at Inlet Receiving and Condensate Stabilizing Unit -

The Inlet Facility is designed to receive the Full Well Stream (FWS) feed

gas for two LNG trains via two 38 inch sub-sea pipelines. The Maximum feed

gas rate is 158,046 kg-mole/hr on a dry basis.

> This facility consist Feed Receiving, Condensate

Separation/Stabilization, Offgas Compression unit. It receives the gas

and liquids from the offshore production platforms and separates the

liquid from the gas and delivers the Gas stream to the downstream LNG

plants.

> It Separate the incoming liquid into a hydrocarbon and an aqueous

phase and Strip the light ends from the natural gas condensate to

stabilize it, before sweetening and storage in atmospheric storage

tanks.

The Condensate Treating system is designed to convert mercaptans from the

condensate stream into disulfide oil, using the Merichem caustic wash

condensate treating process.

> This facility consist Acid Extraction (Napfining System), Mercaptan

Extraction (Thiolex System), Caustic Regeneration (Regen System) &

Mercaptan Oxidation unit (Mericat System).

The Waste Water Injection system is designed to treat waste water, in order

to make it suitable for well injection;

> This facility consists of two sections Sour Water Degassing & Waste

Water Gathering & Treating.

Experience Profile at High Olefin Fluidized Catalytic Cracking Unit -

It is a Stone & Webster licensed (Deep catalyst Cracking Technology) unit

with capacity 92000 BPSD of feed stock. It is Yokogawa CS-3000 DCS

operated. This unit consist different section as below-

V Converter Section- It consist Reactor, Regenerator, Air Heater, Main

Air blower, Catalyst withdrawal well, Orifice Chamber & FG Cooler.

V Unsaturated Gas Plant- It consist Main Fractionators, Steam

Generators, Air cooled fin fans, Wet Gas Compressor, Absorber,

Stripper, Debutanizer, Naphtha Splitter. It consists LPG Treatment

system which includes LPG Caustic Coalescer, C3/C4 Dryers, C3/C4 COS

Removal Bed, C3/C4 Arsine Removal Bed, C3/C4 Mercury Removal Bed &

C3/C4 Splitter.

V C3 Splitter Unit- C3 Splitter Unit is provided to recover polymer

grade propylene from C3 mixed stream from MAPD Hydrogenation Unit.

It's designed to process 138 ton/hr of C3 mixed.

V C2 Contaminant Removal Unit- It consists Caustic Tower, Deoxo Reactor,

Off Gas Dryers, RSH/COS Removal Beds, Arsine Removal Bed & Mercury

Removal Bed. Total normal capacity is 79 ton/hr.

V MAPD Hydrogenation Unit- The unit is designed to hydrogenate the

methyl acetylene (MA) and propadiene (PD) contained in a C3/C4

Splitter overhead stream in order to meet the diolefins product

specification in Polymer Grade Propylene.

V C4 Hydrogenation Unit- The duty of the C4 selective hydrogenation unit

is to convert diolefins present in the C4 feed by minimizing butene-1

loss.

V LPG Sulfur Treatment Unit- This system is designed to process 500m3/hr

of LPG. The design of this system uses Merichem's licensed THIOLE and

technologies REGEN

Safety -

> Act as Area authority and validator for Permit to Work activities

within area of responsibility

> Take effective action to control emergencies and contain hazards

within area of responsibility.

> Notify management of unsafe working conditions by STOP Card, report

HSE incidents and actively participate in HSE meetings.

> Responsible & Carrying out specific duties related to Safety,

Environment and Quality as spelled out in Management Systems Manual,

Safety Manual and other related documents.

> Ensure proper use of tools and PPE, conduct regular site visits,

advice co-workers on potential hazards.

Special Training -

1. Yokogawa CS-3000 Panel Operation

2. Emerson Delta V

3. Incident and Injury Free

4. H2S and Self Contained Breathing Apparatus

5. Work Permit System & Authorized Gas Testing

6. First Aid and Firefighting

7. Basic sea survival.

8. Assertiveness Skills and Interpersonal & Communication Skills

Achievements -

< Record of Excellence Certificates from Petro Rabigh olefin project, Saudi

Arabia

< Award & Certificate for Suggestion(Implementing modification in

equipments, process flow for controlling & reducing conversion cost per

unit produced) in Chennai Petroleum Corp Ltd. in consequent two years

2006 & 2007.

< Certificate of Appreciation for Outstanding Performance during the

Construction, Commissioning & Safe startup of world largest LNG Trains

expansion project of Qatar Gas.

Personal Details -

Name Navneet Kumar

Father's Name Sri Gyandas

Date of Birth 25-02-1981

Nationality & Religion Indian & Hindu

Marital status Married & One Kid

Languages Known English, Hindi and Tamil

Passport Details Passport No. J-4415067 &

Date of expiry-22nd Aug. 2021

GCC Driving License No 281******** & Date of expiry- 07th

April 2014

Notice Period Two Month

Current Salary 3750 US$ Per Month +

Family Status

Expected Salary 4500 US$ Per Month

(Negotiable) + Family Status

Current Location Doha, Qatar

(Navneet Kumar)



Contact this candidate