Post Job Free

Resume

Sign in

Engineer Project

Location:
Srikakulam, AP, 532430, India
Posted:
August 09, 2013

Contact this candidate

Resume:

CURRICULUM VITAE

K.DURGARAO

Mobile: 968-***-****

Sivaramapuram (Village),

Polaki (Mandalam),

Koduru -Post,

Srikakulam -Dist.

PIN-- 532 430 (AP)

Email i.d:ab33yj@r.postjobfree.com

ab33yj@r.postjobfree.com

CAREER OBJECTIVE

* Having about 5 years of industrial experience and keeping in the view

of my academic knowledge, personal strengths I wish to associate

myself with an organization that provides me an enthusiastic

environment to work creatively and collectively for the growth of

organization and always keeping the organization goals as a top

priority.

EDUCATIONAL QUALIFICATIONS

* B.Tech (EEE) from JNTU Kakinada, 2004-2008

* HSE from Board of Intermediate education (AP)

PROFESSIONAL EXPERIENCE

. Presently Working as a Deputy Manager in M/s .Junagadh

power projects private Ltd (10MW-Travalling grate)Junagadh,Gujarat from Jan- 2013 to till date

. Worked As a Asst.Manager in M/s .Junagadh power projects

private Ltd (10MW-Travalling grate)Junagadh,Gujarat from

May- 2011 to Dec-2012

. Worked as a senior engineer in M/s .Junagadh power projects

private Ltd (10MW-Travalling grate)Junagadh,Gujarat from

June 2010 to May- 2011

* Worked as a Site Engineer in M/s. Larsen & Toubro Ltd (L&T)

from June:2009 to June:2010 and having an experience in

Boiler Pressure Parts assembling & erection works at M/s.

Adani Power Limited Project 5X660MW Thermal Power Project

at Mundra, Ahmadabad)

* Worked as a G.E.T (Electrical) in M/s. Bhaskara Steels and

Ferroalloys Ltd (12 MW), Bonai, Rourkela from June 2008 to

April 2009.

PROJECT MANAGEMENT:

Project

Planning, Scheduling and Monitoring

> Project Planning, Scheduling, Monitoring, Updating and Progress

reporting.

> Preparation of Agenda for Minutes of Meeting (MOM) & Record Notes,

Daily progress report, Weekly progress report and Monthly

presentations on the status of the project to Head office as well as

Site management and highlighting the constraints & criticalities for

sorting out the issues.

> Coordinating the project with the Site Execution and different

Agencies involved in the project and informing to Procurement team to

make the equipment available before erection activities commencing and

presenting the impact of delay in overall Erection schedule.

> Project Planning, Scheduling and Monitoring of commenced civil works

> Studying the Mechanical drawings Boiler,Esp,Conveying system, Air

cool condencer,water lines,steam lines,P & I Diagrams

> Studying the Electrical drawings like SLD, Equipment layout, Schematic

wiring, Cable routing schedule, P & I Diagrams

> Verification and processing the supply & erection Bills for Agencies

for their payments against the equipment supplied to site

PROJECT ERECTION AND COMMISSIONING:

* Assembling, Erection and alignment of boiler pressure

parts, non pressure parts and its auxiliaries of

660MW- Supercritical,10MW

-Travelling grate Boilers

* Pre-Commissioning Activities,Commissioning Activities

* Industrial fans: ID, FD, SA FANS alignment,

pre-commissioning checking & Commissioning

* Hydraulic test 117 kg/cm2

* Refrctory dry out (Slow firing in boiler)

* Alkalai boil out

* Steam blowing

* Pre Light up& Final Light up in boiler

* Assembling, Erection &Commissioning Activities of ACC

( Air Cool Condenser)

* Assembling, Erection &Commissioning Activities of ESP

* Fabrication,Assembling, Erection &Commissioning of Fuel

handling and Ash handling

* Cable tray Roots

* Following of cable schedules

* HT & LT Panels Erecton & Testing

* 11kv /66kv switch yard erection

* 11kv/415v Auxiliary Transformer Erection

* Responsible for day to day Erection & Commissioning Activities as per

the work schedule.

* Going through the drawing for fabrication and erection and check the

actual measurement for conforming whether it is exactly as per drawing

* Responsible for optimum utilization of man hours

* Responsible for Quality of Work

* Responsible for contractors' coordination in day to day erection

activities at site.

* Material handling

* Preparing Protocols

* Maintaining Daily progress reports (DPR)and reporting to Site

Manager and H.O

* Safety is the prime importance of work men

OPERATION & MAINTENANCE:

* Checking all M.C.C, P.C.C panel boards and parameters of all motors every

day.

* Checking electrical, Mechanical log books.

* Calculation of export, import, auxiliary consumption every day and

Reporting to H.O

* Manpower Handling

* Safety of the work

* Maintaining the load as per declared schedules to state load dispatching

centre

* Checking daily fuel consumption, checking fuel quality, calculating

boiler efficiency and making proper guide lines to boiler Engineer,

shift Engineer and to the Operator

* Checking water parameters daily and calculating chemical consumption.

* Preparing purchase intends, making enquiry of required items, collecting

no of quotations, finalizing them, and making purchase orders of the

materials.

* Preparing shift schedule of the operators.

* Preparing New Log books for efficient operation of the plant

* Preparing Documents for IBR inspector, Electrical inspector

SOFT SKILLS: Ms-office, Ms-word, Excel, Power point & Ms-project.

PERSONAL INFORMATION

Strengths:

* Good communication skills, hard working, Quick learning & Confidence.

Personal details:

Father Name : K.Purushottam.

Date of Birth : 03rd May, 1985

Sex :

Male

Marital Status : Married

Nationality : Indian

Languages Known : English, Hindi &

Telugu

Contact No. : 096********,

Declaration:

I hereby declare that all the above-furnished details are

correct to the best of my Knowledge and belief.

DT: MAY-2013

srikakulam.

(K.Durga Rao)



Contact this candidate