Post Job Free
Sign in

Power Plant Thermal

Location:
Mumbai, MH, India
Posted:
July 29, 2013

Contact this candidate

Resume:

ANUP KUMAR

E-mail: ab2x6o@r.postjobfree.com

Mob. No :-093********/097********

: ab2x6o@r.postjobfree.com

CAREER OBJECTIVE

To be the best in the industry and progress professionally and personally

each day and to aspire for job satisfaction in a dynamic environment by

making each step a learning experience and keeping abreast with the latest

happenings in the competitive industry.

Professional Profile

A competent professional with 11 years of qualitative experience in Thermal

Power Plant Operation and Maintenance, Project management and Commissioning

of PFBC Boiler, Turbine and BOP.

Current Employer

Abhijeet Projects Ltd- Ranchi (2 x 660 MW)

Dy.Manager (From Aug-11 till date)

Job Profile:

* Project Management and Engineering Co-ordination Thermal Power Plant -

BOP,

* Independent handling the finalization the order of various package

like Coal Handling, Ash Handling, LP, CW piping, Fire Fighting, CW

pump etc.

* Responsible to finalize the technical Specification of individual

package for tendering and bidding for finalization of Contract.

* Independent Responsibility to carry out the Completion of basic and

details engineering of BOP Package along with Coordination from

Vendor/ Consultant for material expediting.

* Leading the activities involving working out various requirements &

monitoring overall project operations including planning, estimation,

scheduling and execution of projects for installation, erection &

commissioning assignments for ensuring timely completion.

* Monitoring the site progress activity on-sites and review of project

schedule, ensuring cost and Project control within budget, planning

for cash flow requirements, etc. and ensuring compliance with quality

assurance plans.

Achievements:

* Prepared most competent and cost effective scheme for packages in

which the top rated vendors can fit

* Involved in Optimization Plot Plan as per the Land availability at

site resulting in cost saving

* Finalized major packages before the scheduled time.

Previous Employer

Adani Power Ltd.- Mundra (4X330MW + 5 X 660MW)

Assistant Manager -Operation (Jan- 2011 to Jul-2011)

Job Profile:

* Responsible to handle the DCS operation of 330MW PFBC Boiler and

Turbine Unit to achieve the generation Target.

* Handled the Unit Start-up, shut down, MFT, Grid failure, emergency etc

during my shift operation.

* Handled to charge and taken in to the line of operation of Boiler

auxiliaries like Coal mill, Lube oil System, oil gun, ID,FD & PA

fans, BFP, feed water, lube oil systems, steam line, APH, LRSB and

all heaters spray line etc.

* Issue and cancellation PTW (Permit to Work) system, safe isolation,

personnel safety and equipment safety.

* Coordinate with DM Plant and knowledge about Water chemistry.

* Identify and supported to maintenance team for the routing maintenance

of Equipment to reduce the break up and downtime.

* Adhere to all safety norms and safe work practices for the plant

movement for inspection and monitoring of physical parameter.

* Well Experience of Turbine emergency and interlocks and HP-LP Bypass

System.

* Handling of emergencies such as Blackouts, transformers and other

critical equipment tripping.

Hindalco Industries limited- Renusagar (742 MW Captive Thermal Power Plant)

Dy. Engineer (June 2001- Dec 2010)

One of the Leading Companies of The Aditya Birla Group, Certified with

ISO -9002, ISO -14001 and OHASAS-18001 as per WCM culture. A captive

Thermal power plant having 10 units (TGs) with total installed capacity of

742 MW and Plant Load Factor above 93 % & Plant Availability Factor above

99 %.

Job Profile:

* Operation & Control of Steam Turbine 80 MW (G.E. MAKE) & its

Auxiliaries.

* Monitoring and controlling the set Parameters of Pulverized coal fired

Boiler of 320 TPH capacity (BHEL make).

* Troubleshooting & safe operation of Steam Turbine Generator (320TPH)

during System jerk, Shut down, Cold start-up & hot start-up, Unit

black-out & station black-out.

* Line up of the unit and its auxiliaries, Changeover of equipments,

routine testing of protection system and annunciation system.

* Issue and cancellation PTW (Permit to Work) system, safe isolation,

personnel safety and equipment safety.

* Development and provided training assistance to sub-ordinates.

* Ensured the Operation and maintenance work as per dialing maintenance

routing and as per SMP and SOP.

* Operation & Control of various type of Air Compressors, for service

and instrument air

* Worked as a shift in charge to maintenance to smooth operation of

Fuel oil handling system, Ash Handling System, Coal Handling system

and others auxiliaries in rotation basis.

* Worked as Lead role to implement the world class maintenance

procedure, 5 S, KAIZEN, TPM etc.

* I had been involved in various activity in Operation Unit like

WCM/TPM activity as Leader

Quality Circle Department as Dy. Leader

Safety of operation plant as Leader.

* Responsible for overall activities related to TPM, WCM, Housekeeping,

safety, ISO And also improvement of equipments through KAIZENS, etc.

* Knowledge about implementation of TPM, WCM and 5S at the site to

achieve ZERO Accident, ZERO Breakdowns and Zero loss.

* Strong communication, interpersonal, learning and organizing skills.

* Field Operation- Line-up of equipment's during starting, giving

clearances to DCS operators to start the equipment's, proper

inspection of field for any abnormality, to properly isolate the

equipment for maintenance. Responsible for proper electrical isolation

(6.6KV, 415V) & mechanical isolation of equipment for maintenance

work. Field operation of BOP areas like LDO house, Compressor house,

cooling tower etc.

* Devising and implementing checks and ensuring compliance of safe and

sound technical practices for the smooth functioning of the plant with

the aim of achieving zero failure.

* Works on SAP modules for maintenance jobs and permits flow.

* Prepared Standard Operation Procedure of all equipment, start-up &

shut down procedure for safe & reliable operation of unit.

ACADEMIC QUALIFICATION

* Completed Mechanical Engineering from J.R.N. Rajasthan Vidyapeeth

University (Distance Education) in 2010.

* Completed Diploma from GOVT G.B PANT LUCKNOW (U.P) in 1998 with 70%.

Industrial Training:

* One year apprenticeship from Hindalco Industries Ltd. (Renusagar Power

Division) From Boiler Maintenance Dep't. In year 1999 to 2000.

* Induction Power Plant Technical Training & Management Development

Center from Hindalco Industries Ltd. (Renusagar Power Division) from

09Jul-2001 to 05Oct-2001.

* 02 Days Training on Plant Water Chemistry from NPTI-Nagpur.

Strength and Skill:

Engineering, Operation and Maintenance, Computer Skill, Internet, Spare

Identification and

Management, Team spirit and Motivation, Hard Work and self-confidence.

PERSONAL PROFILE

Father's Name : Sri Bigan Prasad

DOB : 12-04-1978

Marital Status : Married

Hobbies : Playing Cricket, Plantation

Languages Known : Hindi & English

Present CTC : 8.00 lacs per annum

Notice period : Two (2) Months

Salary Expected : Negotiable

Permanent Address : Vill: South Parasi Renusagar Coal gate

Near kakri shiv

mandir

Post: kakri

Sonebhadra U.P. 231220

DECLARATION

I hereby declare that above mentioned information are true to the best of

my knowledge.

Date:

Place: Ranchi

Yours Faithfully

(ANUP KUMAR)



Contact this candidate