CURRICULUM VITAE
[pic]
Amlesh Kumar Singh
Q.NO. WCN/5
UNIT-1, MATHURAKATI, KHARAGPUR
POST-NIMPURA DIST-MIDNIPORE
(WB) PIN-721304.
Phone No: 786-***-**** and 919-***-****
Email: *********@*****.***
B.Tech. Mechanical
(IACR Engineering College, Rayagada, Odisha)
1st class B.Tech in Mechanical Engineering from IACR Engineering College,
Rayagada, Odisha with 4yrs Exp., more than 2 Yr experience in Maintenance
of Balance of Plant(BOP) area, 2 Yrs experience in Project & Construction
industries..
Engineer-Mechanical Maintenance
Presently working with KSK ENERGY VENTURE LTD. 6X600 MW Thermal Power
Plant, Nariyara (C.G) as a Mechanical Maintenance Engineer.
Worked on Pressure conveying, Vacuum System and Wet System of Ash Handling
Plant.
Career Graph
Since 2013 Executive-Mechanical Maintenance
KSK ENERGY VENTURE LTD.
6 X 600 MW.
Key Responsibilities: -
Maintenance.
> Maintenance of Rotary Parts of equipments like Slurry Pumps, HCSD
Pumps, Vacuum Pumps, Compressors, Blowers, Clinker Grinders, RVF etc.
> Maintenance of Dome Valves, Plate Valves etc. of Dense Phase Pneumatic
Fly Ash Conveying Systems.
> Maintenance of Feed-Gates of Bottom Ash Hopper, ART Tank, Ash
Conditioners, Screw Conveyor.
> Installation of Pumps and its alignment.
> Close monitoring of Rotary Systems (Vibrations, Temperatures, Abnormal
sounds, Alignment cross checking etc.)
> Root cause analysis of system Failures.
> Modifications in the equipments for the improvement of the system.
> Preparing Preventive Maintenance schedules, Maintenance checklist,
Spare part list etc.
> Executing the Preventive Maintenance as per schedule and recommended
time.
> Preparing Annual Maintenance of Ash Handling System.
> Planning of spare parts, consumables and man power for shutdown and
breakdown jobs.
> Checking the availability of spares of area of concern.
> Follow-up with suppliers for ensuring Spare Availability.
PREVIOUS EXPERIENCE
BSBK Engineers Pvt. Ltd., Maithon,2011-2013
> Worked with BSBK Engineers Pvt. Ltd. In Ash Handling System 0f 2 x 525
MW Power Plant with hands on Experience in Drawing Evaluation, Onsite
Execution, Maintenance.
Plant Details: -
> Client: MPL(Joint venture of TATA POWER & DVC) 1050 MW (2X525 MW)
> Ash Handling: 7000 TPD, Make-MBPL.
Key Responsibilities: -
Maintenance
> Maintenance of Rotary Parts of equipments like Pumps, Compressors,
Blowers, Clinker Grinders, RVF etc.
> Maintenance of Dome Valves, Plate Valves etc. of Dense Phase Pneumatic
Fly Ash Conveying Systems.
> Maintenance of Feed-Gates of Bottom Ash Hopper and De-Watering Bins.
> Close monitoring of Rotary Systems (Vibrations, Temperatures, Abnormal
sounds, Alignment cross checking etc.)
> Root cause analysis of system Failures.
> Preparing Preventive Maintenance schedules, Maintenance checklist,
Spare part list etc.
> Executing the Preventive Maintenance as per schedule and recommended
time.
> Preparing Annual Maintenance of Ash Handling.
> Planning of spare parts, consumables and man power for shutdown and
breakdown jobs.
> Checking the availability of spares of area of concern.
> Dealing with client for any kind of modification / Planning.
Balajee Infratech & Construction Pvt. Ltd.
2009-2011
Plant Details: -
> Client: BHUSHAN STEEL LTD. ODISHA.
Key Responsibilities:
> Maintenance of 200 TPH Metso make stone mill.
. CSS setting of Jaw and Cone Crusher.
. Hydraulic pressure setting of Cone Crusher.
. Wear Liner Changing.
. Life calculation of the equipments and wear parts.
. Changing of belt conveyors.
> Maintenance of 350 TPH Sandvik & 400 TPH Mc-Nally make Coal Hammer
Mill.
. Gap Setting of Hammer and Crushing Liner.
. Hammer Arm and Hammer replacing.
. Hydraulic Lifting Cylinder Repairing of Hammer Mill.
. Maintenance of IC manufactured Flip flop 'Coal Fines Separator
Screen'.
. Maintenance of conveyors drum pulley, bearing changing, Belt
alignment, Belt replacement of size up to 1400mm width and 100m
length.
> Erection of Hammer Mill Circuit.
. Handling of complete erection of 400 TPH Hammer mill coal circuit.
. Material inspection with supplier required for erection.
. Checking the availability of materials required for erection.
. Evaluation of drawing/Documents.
. From Bolt Checking up to Structure erection.
. Fabrication and Erection of conveyors Gallery, Trestles.
. Erection of Hammer Crusher and Flip Flop Screen.
. Fabrication and Erection of Vertical Gravity Take-up.
. Erection of Gear Box and Motor.
ACHIEVEMENTS
> Awarded "Rewards and Recognition" for the completion of Hammer
Mill Circuit before the due time.
> Among Top 10 ranker in College during B.Tech in Mechanical
Engineering.
> Rewarded for the best performer in University Level Cricket
League.
PROFESSIONAL QUALIFICATION:-
> Completed B.Tech in Mechanical Engineering from IACR Engineering
College Rayagada, Odisha. In first Division and Degree Percentage 7.3
CGPA in 2009.
ACADEMIC QUALIFICATION:-
> Completed 10th (C.B.S.E) From Kendriya Vidyalaya with 72.8% securing
in 2002.
> Completed 12th (C.B.S.E) From Kendriya Vidyalaya with 62.8% securing
in 2004.
COMPUTER SKILLS:-
> Operating System: Windows 2000/Xp/2003/Vista/windows7, MS-DOS
> Computer Language: C, C++, Java, .Net, Data Structure, RDBMS.
OTHER SKILLS:-
> Industrial Training in Welding (BTC Indian railway).
> AUTOCAD 2006
PERSONAL PROFILE
. Name : Amlesh Kumar
Singh
. Date of birth : 4th Feb. 1987
. Gender : Male
. Marital Status : Married
. Language Known : English, Hindi, Oriya,
Bengoli.
. Hobbies : Reading Books,
Playing Cricket
Declaration:-
I consider myself familiar with Power sector ( BOP) aspects. I am also
confident of my ability to work in a team. I hear by declare that the
information furnished above is true to the best of my knowledge.
Date: -
(Amlesh Kumar Singh.) [pic]