CURRICULUM VITAE

[pic]

Amlesh Kumar Singh

Q.NO. WCN/5

UNIT-1, MATHURAKATI, KHARAGPUR

POST-NIMPURA DIST-MIDNIPORE

(WB) PIN-721304.

Phone No: 786-***-**** and 919-***-****

Email: *********@*****.***

B.Tech. Mechanical

(IACR Engineering College, Rayagada, Odisha)

1st class B.Tech in Mechanical Engineering from IACR Engineering College,

Rayagada, Odisha with 4yrs Exp., more than 2 Yr experience in Maintenance

of Balance of Plant(BOP) area, 2 Yrs experience in Project & Construction

industries..

Engineer-Mechanical Maintenance

Presently working with KSK ENERGY VENTURE LTD. 6X600 MW Thermal Power

Plant, Nariyara (C.G) as a Mechanical Maintenance Engineer.

Worked on Pressure conveying, Vacuum System and Wet System of Ash Handling

Plant.

Career Graph

Since 2013 Executive-Mechanical Maintenance

KSK ENERGY VENTURE LTD.

6 X 600 MW.

Key Responsibilities: -

Maintenance.

> Maintenance of Rotary Parts of equipments like Slurry Pumps, HCSD

Pumps, Vacuum Pumps, Compressors, Blowers, Clinker Grinders, RVF etc.

> Maintenance of Dome Valves, Plate Valves etc. of Dense Phase Pneumatic

Fly Ash Conveying Systems.

> Maintenance of Feed-Gates of Bottom Ash Hopper, ART Tank, Ash

Conditioners, Screw Conveyor.

> Installation of Pumps and its alignment.

> Close monitoring of Rotary Systems (Vibrations, Temperatures, Abnormal

sounds, Alignment cross checking etc.)

> Root cause analysis of system Failures.

> Modifications in the equipments for the improvement of the system.

> Preparing Preventive Maintenance schedules, Maintenance checklist,

Spare part list etc.

> Executing the Preventive Maintenance as per schedule and recommended

time.

> Preparing Annual Maintenance of Ash Handling System.

> Planning of spare parts, consumables and man power for shutdown and

breakdown jobs.

> Checking the availability of spares of area of concern.

> Follow-up with suppliers for ensuring Spare Availability.

PREVIOUS EXPERIENCE

BSBK Engineers Pvt. Ltd., Maithon,2011-2013

> Worked with BSBK Engineers Pvt. Ltd. In Ash Handling System 0f 2 x 525

MW Power Plant with hands on Experience in Drawing Evaluation, Onsite

Execution, Maintenance.

Plant Details: -

> Client: MPL(Joint venture of TATA POWER & DVC) 1050 MW (2X525 MW)

> Ash Handling: 7000 TPD, Make-MBPL.

Key Responsibilities: -

Maintenance

> Maintenance of Rotary Parts of equipments like Pumps, Compressors,

Blowers, Clinker Grinders, RVF etc.

> Maintenance of Dome Valves, Plate Valves etc. of Dense Phase Pneumatic

Fly Ash Conveying Systems.

> Maintenance of Feed-Gates of Bottom Ash Hopper and De-Watering Bins.

> Close monitoring of Rotary Systems (Vibrations, Temperatures, Abnormal

sounds, Alignment cross checking etc.)

> Root cause analysis of system Failures.

> Preparing Preventive Maintenance schedules, Maintenance checklist,

Spare part list etc.

> Executing the Preventive Maintenance as per schedule and recommended

time.

> Preparing Annual Maintenance of Ash Handling.

> Planning of spare parts, consumables and man power for shutdown and

breakdown jobs.

> Checking the availability of spares of area of concern.

> Dealing with client for any kind of modification / Planning.

Balajee Infratech & Construction Pvt. Ltd.

2009-2011

Plant Details: -

> Client: BHUSHAN STEEL LTD. ODISHA.

Key Responsibilities:

> Maintenance of 200 TPH Metso make stone mill.

. CSS setting of Jaw and Cone Crusher.

. Hydraulic pressure setting of Cone Crusher.

. Wear Liner Changing.

. Life calculation of the equipments and wear parts.

. Changing of belt conveyors.

> Maintenance of 350 TPH Sandvik & 400 TPH Mc-Nally make Coal Hammer

Mill.

. Gap Setting of Hammer and Crushing Liner.

. Hammer Arm and Hammer replacing.

. Hydraulic Lifting Cylinder Repairing of Hammer Mill.

. Maintenance of IC manufactured Flip flop 'Coal Fines Separator

Screen'.

. Maintenance of conveyors drum pulley, bearing changing, Belt

alignment, Belt replacement of size up to 1400mm width and 100m

length.

> Erection of Hammer Mill Circuit.

. Handling of complete erection of 400 TPH Hammer mill coal circuit.

. Material inspection with supplier required for erection.

. Checking the availability of materials required for erection.

. Evaluation of drawing/Documents.

. From Bolt Checking up to Structure erection.

. Fabrication and Erection of conveyors Gallery, Trestles.

. Erection of Hammer Crusher and Flip Flop Screen.

. Fabrication and Erection of Vertical Gravity Take-up.

. Erection of Gear Box and Motor.

ACHIEVEMENTS

> Awarded "Rewards and Recognition" for the completion of Hammer

Mill Circuit before the due time.

> Among Top 10 ranker in College during B.Tech in Mechanical

Engineering.

> Rewarded for the best performer in University Level Cricket

League.

PROFESSIONAL QUALIFICATION:-

> Completed B.Tech in Mechanical Engineering from IACR Engineering

College Rayagada, Odisha. In first Division and Degree Percentage 7.3

CGPA in 2009.

ACADEMIC QUALIFICATION:-

> Completed 10th (C.B.S.E) From Kendriya Vidyalaya with 72.8% securing

in 2002.

> Completed 12th (C.B.S.E) From Kendriya Vidyalaya with 62.8% securing

in 2004.

COMPUTER SKILLS:-

> Operating System: Windows 2000/Xp/2003/Vista/windows7, MS-DOS

> Computer Language: C, C++, Java, .Net, Data Structure, RDBMS.

OTHER SKILLS:-

> Industrial Training in Welding (BTC Indian railway).

> AUTOCAD 2006

PERSONAL PROFILE

. Name : Amlesh Kumar

Singh

. Date of birth : 4th Feb. 1987

. Gender : Male

. Marital Status : Married

. Language Known : English, Hindi, Oriya,

Bengoli.

. Hobbies : Reading Books,

Playing Cricket

Declaration:-

I consider myself familiar with Power sector ( BOP) aspects. I am also

confident of my ability to work in a team. I hear by declare that the

information furnished above is true to the best of my knowledge.

Date: -

(Amlesh Kumar Singh.) [pic]