Post Job Free

Resume

Sign in

Sales Service

Location:
Dartmouth, NS, B2R 1C6, Canada
Salary:
150000 CAD
Posted:
July 30, 2013

Contact this candidate

Resume:

Timothy Randall DeVouge

** ******** **

Waverley, NS Canada B2R1C6

1-902-***-**** home 1-902-***-**** cell

ab22ww@r.postjobfree.com

Airport of origin: YHZ (Halifax, Nova Scotia CANADA)

Work Experience

TD TECHNOLOGIES (owner/operator Timothy DeVouge) 2009 – 2013 – Belize, China, Iraq, Syria, Luanda

• 2009 – 2010 – Belize – Belize Energy, complete open hole completion.

2011 – China – Topwell Services, Consultant. Training and supervising, slickline set inflatable bridge

plug (SSIBP) with hydraulic anchor. Designed to install through smaller ID well head and set in tubing

or in casing for well head changes.

2011 Syria – Shell. Consultant for workover operations with coil tubing, setting inflatables to shut

off well, extra barrier.

2011 Iraq – ENI. Consultant, workover Company Man re completing wells in Rumaila Field Basra.

2012 – 2013 Luanda. Building completions for Total CLOV project. Quality process for comingled oil

producers (COP), comingled water injectors (CWI), mentor and tutor.

HALLIBURTON October 2006 February 2009 International – Kazakhstan

Service Leader Coordinator Supervising Multi Packer Intelligent well completions and services. Direct

completions, writing procedures, project management, system integrity testing, base operations, control storage

and inventories, mentor tutor to junior personnel planning training

BAKER OIL TOOLS INTERNATIONAL May 2001 December 2005 International – Kazakhstan, China, Saudi, Oman,

India

Service Leader Coordinator Supervising work over & completion operations, well interventions with slick line,

fishing, packers, SSSV & liner hanger operations, cementing, acidulation, N2 stimulation and well clean up

operations, review / writing of programs and procedures. Ensure that Company HSE & Operations policies are

well understood and followed by all personnel under my supervision and ensure that contractor crews are

proficient in the services they deliver.

TD TECHNOLOGIES LTD – January 1999 – now (Contractor/Owner)

Consultant/Contractor Key competencies organization & planning, leadership & team work of Well Services &

Completion operations, Technical expertise, Leader in HSE & quality. (Contractor to various service companies

when not on overseas payroll). Weatherford, Baker, Packers Plus, Prairie Oil Tools, Innicor, Trend Oil Tools, World

Oil Tools & Oil Serv.

POLAR COMPLETIONS – August 1999 – May 2001 Alberta Canada

District Manager – Project set up of District to supply 7 rigs with service tools and completion tools, work overs

and new drills, cement retainers, selective acidizing, cup style and packer type. plus completion hook ups.

(Contract Apache Canada)

SAPEX OILTOOLS – February 1999 – August 1999 International Indonesia

Sales & Serviceman Sales and service all over Sumatra on sales calls and tool application design, run several

inflatable tool strings. Track and control replacement parts for client inventory.

SCHLUMBERGER – September 1998 – December 1998 International Turkmenistan

Completions Supervisor Design and complete, 2 packer system with downhole choke, sliding sleeve door, on off

expansion tool. Produce tubing and casing. 3 well package. Oversea: slick line, eline perforating and rig.

operations.

CUMMINGS OIL TOOLS – July 1994 – September 1998 Red Deer, Alberta Canada

Field Technician Specialist Supervise operations on field loc'n, meet with Company Rep, review well program,

plan job, measure drift and function tools at surface. Make up tools to run in hole on, csg, tbg, slick line, Eline.

Deployed with Rig, coil tubing, electric line, slick line, snubbing unit. space all tools in the well according to the

planned depth and configuration requested and agreed. Cementing tools, frac tools, acidizing tools, slick line

tools, Packers both mechanical or hydraulic set, Liner hangers, bridge plugs. Operate set and test all tools after

set in well bore. Make well schematic to indicate all depths, sizes, weights and calculations for well file. Complete

billing and invoicing. Sales quotes and completion design.

CUMMINGS OIL TOOLS – November 1993 July 1994 Red Deer, Alberta Canada

Shop Hand Take apart repair clean re assemble, tubing anchors, sand bailers, on off tools, tubing packers both

single grip and double grip mechanical set, selective acidizing tools both cup type and packer type. Dual string

packers, scrappers, unloader valves, slick line tools, wire line packer setting equipment, baker 10 and 20 eline

setting tools for setting packers, plugs, cement retainers on wire line. Test, drift, measure all rebuilt tools and

record. Oil Tool inventory: Baker Oil Tools, Guiberson, Site, D&L, Kline Oilfield Equipment, Ottis, Track and trace

and record all inventory on rebuilding tools and keep client inventory and billing up to date.

ALBERTA GOLD WELL SERVICING January 1982 – October 1993 Alberta Canada

January 1982 – October 1993 Driller /Supervisor / Crew Chief Operate and maintain, rig, Blow Out

Preventer (BOP) system, blind rams, pipe rams, annular, and accumulator. Supervise rig crew in all operations,

tripping pipe, rigging up and rigging out, snubbing units, slick line units, Electric lines, hydraulic lines, pumping

units. Work with all service crews to rig up all surface equipment to perform a task to the well. Set and unset,

packers, anchors, rod pumps, bridge plugs, fishing tools, on off tools, ESP, sand bailers, liner hangers, scrapers.

Drill out cement plugs, cement retainers, and packers using various methods, surface tubing swivels and mud

motors. Deep and shallow wells, oil gas and injection wells,(Sour and sweet Gas) track and log operation verses

time and record. Track all movement below BOP's. Swab dead well to live well with swabbing system. Find and

record well fluid levels with swabbing operations.

July 1983 – August 1986 – Derrick Man Operate and maintain, pump and tank, well head and BOP valves and

pressures, track and record fluids, flow and kill well for work over operations. Run fluid and pump system for

drilling operations. Rig in manifolds for cement, acid, N2, fracs and snubbing operations. Run derrick tripping of

pipe. Operate pressure boilers winters 1985 & 1986.

January 1982 – June 1983 – Roughneck Assist rig up/rig out of Rig, fluid pump and lines, Run tongs, slips and

elevator's, trip pipe from catwalk and derrick.

Education

High School Diploma 1980

Bachelor of Science (Mehanical Engineer) June 1984

25+ years in field service and hands on experience

Achievements/Awards

Hydraulics 001 Program Baker Oil Tools License 001 March 2002 to March 2002

AMC Torque Machine AMC Engineering Limited License RT 14 S January 2002 to January 2002

Subsurface Safety Systems Baker Oil Tools License 23 FEC Module October 2002 to October 2002

Packer Systems Baker Oil Tools License 011 FEC Module October 2002 to October 2002

Packer 111 Seminar Baker Oil Tools March 2002 to October 2002

Liner Hanger Seminar Baker Oil Tools License 124 June 2004 to July 2004

Special Oil well Operators Alberta Labor, General Safety Services Division, Boilers Branch License 4928

November 1985 to December 1985

IADC, WELLCAP, COMBINED SURFACE & SUBSEA International Association of Drilling Contractors License

A368324 February 2012 (expires February 2014)

IWCF, International Well Control Forum International Oilfield Training Solutions LTD. (I.O.T.S) License NI February

2012 (expires March 2014)

H2S ALIVE

ENFORM License HAL 228***-******* February 2010 (expires February 2013)

Basic Offshore Safety Induction and Emergency Training – 5700 (Including HUET and EBS) expires 10 04 2016

REFERENCES

Zhanibek Ataushiyev – ab22ww@r.postjobfree.com

Kevin Langille – ab22ww@r.postjobfree.com

Mike Haynes – ab22ww@r.postjobfree.com



Contact this candidate