Curriculum Vitae Construction & Pre Commissioning
Personal Profile
Name : Mujiono
Nationality : Indonesia
Religion : Moslem
Sex : Male
Marital Status : Married
Date of Birth : February 13, 1963
Passports No : A1162631 Valid up to Sept 2016
Resident Address : Balikpapan Regency Blok: BJ No-8.
JL Besakih – IX Balikpapan 76115
Résident Phone : +62-542-*******.
Mobile Phone : +62-813-******** / +628*********
E–mail : ab20yr@r.postjobfree.com
Language : Indonesia / English
Over 30 years’ experience as construction, pre-commissioning & commissioning at various project oil & gas, power plant
Leading all functions of project management including planning, designing, processing, specs-approval, managing staff,
supervising sub-contractors, QA/QC management, budgeting, scheduling, progress reporting and timely completion of projects
Objective Statement
• Challenging position to proficiently manage, oversee and execute large-scale of fabrication, construction, pre
commissioning & commissioning of projects Top Site module, E – House module, Process Platform Oil & Gas, Coal Fire
Steam Turbine, Combine Cycle Power Plant, Open Cycle Gas Turbine, Water Treatment Plant and Water Injection Plant
Core Competency
• Thorough knowledge of legal issues and safety standards.
• Effective time management and logical decision-making ability.
• Excellent communication skills.
• Capacity to motivate, lead and boost morale of team.
Key Project Lead Activities:
• Oversee construction, pre commissioning & commissioning of special projects from inception to planning to completion.
• Coordinated design and planning to ensure design standards are met and maintained.
• Conducted and performed site surveys during various stages of the construction project.
• Analyzed vendor proposals and selected the appropriate one for each project.
• Reviewed construction technical documentation for accuracy, feasibility, quality and conformance to industry standards
& company spec
• Supervised and guided other staff throughout the construction, pre commissioning process and commissioning.
Other Management Performance:
• Divided massive construction, pre Commissioning & commissioning project into small and easy steps, enabling
engineers to perform their functions as per their area of expertise.
• Arranged work-force as per requirement of project and dispatched schedule to worksite.
• Acted as a link between clients and workforce, reviewed work on clients’ behalf and issued reports to clients
• Ensured all construction pre commissioning processes were completed as per safety and quality guidelines.
• Contacted contractors regularly for project development updates.
Educational Qualifications
• Bachelor’s Electrical Engineering Institute Technology Pembangunan Surabaya GPA.3.11
Skills and Expertise
-Project Management, Steel Fabrication, Construction Management, Pre Commissioning & Commissioning
-Top Site & Process Module Oil & Gas, Power Plant, Water Injection & Water Treatment Plant
-Combine Cycle Power Plant, Coal fire steam turbine, Open Cycle gas turbine, 70 KV & 150 KV Substations
-Construction power distribution system and transmission Line: 3.3 K, 6.6 KV, 11 KV, 70KV
-Distributed Control System, Calibration, termination & splicing HV cables and Hi pot testing
-Steel Fabrication, erection, welding, Sand blasting, painting, piping, mechanical, equipment Installation and E & I
Hook Off shore, E&I, Cabling System, Site Pre Commissioning and commissioning whole plant, Etc
-Mechanical Completion: Structure, Piping, Architectural, Painting, Mechanical, Electrical & Instrument
-MS application: MS office, MS project, MS Visio, Computerize Maintenance Management System (CMMS)
Course Attended
-Electrical Industry in the Electrical Industries Training Center Certificate
-Basic Power Distribution and Transmission Lines State Owned Company of Electricity Certificate
-Advanced Power Distribution and Transmission Lines State owned Company of Electricity Certificate
-Cherry picker, crane truck operator, lifting, rigging, driving license
-Integrated Commissioning and Progress System Training (ICAPs)
-Basic & Advance welding government training center
-Programmable Logic Control & Distributed Control System.
-Leadership and Work permit system
-In house Training Project Management certificate.
-Safety Training Observation Program certificate.
-Advance Safety Auditing certificate.
-HSE awareness & Scaffolding certificate
-Fire Fighting and Breathing Apparatus certificate
-Risk Assessment & Awareness and prevention Certificate
-Shipyard Safety Instruction Course (SSIC) Singapore certificate
-Risk Management Biz safe Level 2 Singapore Certificate
-HUET & Sea Survival Training Certificate
Work Experience
1. April, 2013 - Present
Company: PT. Gunanusa Utama Fabricators EPSCC Oil & Gas
Position: Pre Commissioning Manager
Propose: Contract Status
Client: Total Myanmar
Project Title: Subsidence Yadana On & Offshore Top Site Module Brown Field Project Myanmar
Duties and responsibilities:
-Approve a contract strategy, pre – commissioning and commissioning scope of work, commissioning organization
Requirement, training requirement, commissioning/start up spare parts
-Approve commissioning organization procedure and pre – commissioning and commissioning preparation
-Review and giving an inclusion to the general pre-commissioning procedure i.e.: Hydro Test, Flushing, Piping, Draining &
Drying, Gross leak test, Flange management, Inst/System/Telecom, Electrical, Instrument, Calibration, and ICAPS -
Execution Integration Procedure
-Review and give an inclusion to Pre-commissioning dossier i.e.: Sample Dossier, ME/PI/STR/INST/ ELC/TLCOM
Input data Base of ICAPS Program and Administrators,
-System/subsystem dossier c/w all required forms, mark-up drawing, index’s, Compile pre-commissioning dossier
-Arrange and review Compilation to dossier Test sheet/Check list, Status Index’s, as per sub-system
-Ensure that all Quality and Safety requirements set by Management is clearly understood by the workforce
-Review the progress of Updating Pre-commissioning Status Index’s, updating Pre-commissioning Progress Report and
Updating List of Modification / as built drawing as per Actual Installation
-Control pre-commissioning and commissioning activities and define a pre-commissioning & commissioning scope
Of work, commissioning organization requirements, training requirements etc
Project status: on going
2. March, 2012 – March, 2013
Company: SIEMENS PTE LTD EOG Division Singapore
Position: Construction & Hook up Manager
Propose: Contract Status
Project Title: GLNG Project E-House Module
Duties and responsibilities:
-Review & approve AFC & As built drawing, procedure and mechanical completion of: Structure, architectural, Piping, E&I
-Supervision & Controlling site activities: fabrication, erection, construction, Equipment installation
-Lead of site engineer, Safety officer, production, Inspector and document controller
-Lead of pre commissioning & commissioning: E & I, Mechanical & load out team
-Responsible for managing site team & work in partnership with the Contractor
-Supervision construction works based on designs, specification, standards and HSQE requirements
-Liaise with other discipline Safety, engineering, project engineer, planer etc
-Monitoring installation equipment, mechanical completion (ITR), punch clearance, etc
-Review & approve Materials Data Register and closed out project document etc
Project Status: Completed Contract
July, 2011 – Feb, 2012
Position: Construction & Hook up Manager
Propose: Contract Status
Page 2 of 5
Project Title: Water Injection and Water Treatment Plant Module FPSO Project
Duties and Responsible:
-Review and approve AFC & As built drawing, procedure, scope of work and contract from initiation to completion of project
-Supervise and monitoring fabrication, erection: structural, piping, mechanical, painting and E&I
-Monitoring procurement materials status and approve receiving materials
-Installation: Corrosion Inhibitor, Feed Pump, Reverse Osmosis & Sulphate Removal Unit
-Mechanical completion piping: line check, pressure test, flushing, drying, leak test, reinstatement, flange management
-Approved mechanical completion document: structural, piping, mechanical, painting, E&I
-Mechanical completion E&I: Cables Testing, continuity check, Loop check, calibration
-Review & approve Mechanical Completion document: Structural, Piping, Mechanical, painting, E & I
-Lead site team: Engineer, Safety, Supervisor, Inspector and load out team, clearance punch list
-Lead Pre fabrication & fabrication, construction and yard pre commissioning & commissioning package
-Chair man progress meeting, approve MDR and Completion and closed out document
Status: Project Completed
March, 2011 – Jun, 2011
Position: Construction Manager
Propose: Contract Status
Project: 11 KV Substations E House Onshore Barzan Project
Job Description & Responsibilities
-Supervise Sub Contractor Fabrication, erection: Steel structure, architectural, painting
-Supervise Installation, pre commissioning & commissioning equipment: 11 KV switch gears, 400 V MCC, power Transformer,
HVAC, cable ladder installation, Cabling system electrical & instrument, function test equipment
-Supervision installation equipment LV switch gear, HV switch gear, transformer, HVAC, instrument
-Approved mechanical completion: structural, painting, E & I & punch list clearance, etc
-Lead site team: Engineer, Safety, Inspector and load out team
-Chair man progress meeting, approve MDR and closed out document
Status: Project completed
3. May, 2007 – Feb, 2011
Company: Total Indonesia E & P Oil & Gas Indonesia
Project Title: Oily Water Treatment Top Site Module On & Offshore site
Project Title: Gathering Testing Satellite Top Site Module Tunu Phase -12 & 13A on & Offshore
Project Title: Bottle Necking Bekapai Brown Field Project On & Offshore
Propose: Contract Status
Position: Construction & Pre Commissioning Superintendent
Job description & Responsibilities
-Supervisory yard fabrication & construction phase and hook up offshore site
-Coordinate, review and approve the project construction schedule
-Supervise the Construction, Pre Commissioning, and post startup support of projects activities
-Ensure that all Construction QC Manuals/Procedures are implemented throughout the project
-Review drawing, Specification, Procedure, FATs electrical & instrument
-Lead & Supervise production, QA/QC, Per Commissioning and Punch Clearance team
-Liaise with other discipline Safety, engineering, project engineer, planer, cost control etc
-Ensure Project Quality and standard maintained at location within the project budget and schedule
-Review & approved, Mechanical completion: check list, test sheet Structure, Mechanical, Piping, Painting, EI
Remark: Completed project
4. October, 2005 – April, 2007
Company: PT.Kaliraya Sari EPC Oil & Gas Indonesia
Project Title: Sapi Development on & offshore Project Top Site Module, Process Module and Pipe line
Client: Chevron Indonesia EP oil & Gas Company
Project Title: Compression Installation Brown Field Project
Client: Virginia Indonesia Oil & Gas Company on shore
Position: Construction, Installation & Commissioning Manager
Job description & Responsibilities
-Manage from initiation to completion: fabrication, construction: Structural, Piping, Painting, Mechanical, Electrical & Instrument
-Lead Engineering team, Pre commissioning, Commissioning and post startup support of projects consist of:
Well head, Process Platform, 10” Pipe line 10 Km, Compressor and hook up off shore site
-Promote quality awareness throughout the project and company organization.
-Responsible and execution of construction, pre commissioning & commissioning, handover and close-out of projects
-Supervise and guide the department to ensure that their work is of the required quality
-Lead and supervise site team: production, structure, piping, mechanical, QA/QC, Electrical & Instrument
-Review & approval project dossier consist of: MC, DMCC, LUN, Pre Commissioning and RFCC
Remarks: Completed Project
5. June, 1998 – September, 2005
Company: VICO Indonesia E & P Oil & Gas Indonesia
Project Title: On shore Brown Field Project
Position: Construction & Commissioning Superintendent
Job description & Responsibilities
-Supervise and manage of construction project and contractor from initiation to completion of project
-Installation flow line, well head, HP, LP, VLP compressor
-Lead project team to upgrading or modified existing plant facilities & major project.
-Lead production, QA / QC, Pre commissioning, commissioning team & perform testing equipment
-Budgeting of project and approved construction progress report & FAT Electrical, Instrument, mechanical
-Lead & Supervise team: Safety, Civil & Structural, mechanical, piping, painting, E&I, Pre commissioning & commissioning
-Approved mechanical completion: structure, piping, painting, electrical & instrument, Close out & Turn over project document
Remark: Completed Contract
6. November, 1995 – May, 1998
Company: Rolls Royce Industrials Power System Samarinda East EPC Indonesia
Project Title: 60 MW Combine Cycle Power Plants
Client: Indonesia Government (State Owned Company of Electricity Indonesia)
Position: Electrical & Materials Engineer
Job description & Responsibilities
-Construction, Pre commissioning, Commissioning and Start up of 60 MW Power Plant consist of:
-2 x 20 MW gas turbine & 1 x 20 MW steam turbine, 2 x MCC gas turbine generator, 1 MCC HRSG
-150 KV Substation, gas treatment plant, water treatment plant, cooling water plant, black start generator,
Infrastructure building, lighting, HVAC, etc
-3 x 30 MVA step up power transformer 11KV to 150 KV and 3 x 2, 5 MVA Auxiliary transformers
-Responsible and accountable to manage the execution of construction, commissioning, handover document,
E & I Commissioning coordinator, Inspection of electrical equipment & materials
-Review AFC drawing, contract & client spec refer to international standard
-Prepare progress report project, approved & review as built drawing; provide MC ITR Electrical & Instrument & Turn
Over Document and Closed Out Document
Remark: Completed Project
7. February, 1995 – October, 1995
Company: BOW VALLY LTD Oil Company JOB Pertamina Indonesia
Project Title: Open Cycle Power Plants, Water Treatment Plant and Water Injection Plant
Position: E & I Superintendent
Job description & Responsibilities
Construction, pre commissioning, commissioning & start up of:
-2 x 3 MW open cycle gas turbine Generator, switch gear and generators MCC, water treatment plant & water injection plant,
6.6 KV switch gear, water tank capacity 150.000 BPD
-Supervise construction & pre commissioning and commissioning team, planning project activities
-Responsible and accountable to manage the execution of construction, pre commissioning, commissioning
-Prepare progress report project, plant maintenance during warranty, setup construction activities
-Construction, commissioning of 6,6 KV over head line power distribution & under ground
Remark: Completed Project
8. June, 1994 – January, 1995
Company: PT. Dermaga Perkasa Pratama Indonesia
Project Title: Coal Terminal Transshipment
Position: Electrical & Instrument Inspector
Job description & Responsibilities
-Inspect installation of electrical: Cables ladder & tray installation, cabling system MV cables, power, control, lighting,
Instrument, cabling termination and witness cables testing
-Inspect electrical equipment installation: 6.6 KV Switch gears, over land conveyor MCC, re claimer, Stacker, etc
-Generate & clearance punch list, witness function test electrical and instrument device
-Supervise electrical & instrument sub contractor and monitoring site activities
-Supervise & witness termination, splicing MV cables and testing
Remark: Completed project
9. February, 1990 – May, 1994
Company: PT. Kaltim Prima Coal Indonesia
Project Title: Coal Fire Power Plants 10 MW, 70 KV Sub Station, 70 KV Transmission Line
Position: Electrical Supervisor & Commissioning Electrical Coordinator
Job description & Responsibilities
-Construction, commissioning, start up and maintenance of 2 x 5 MW coal fire steam turbine
-3 x 2 MW diesel generator, 70KV & 11KV sub station,
-70KV transmission line, 11 KV power distribution over head line & underground system
-Maintenance HV switch gears, steam Turbine MCC, over land Conveyor switch gear
-Trouble shorting electrical overland conveyor, Stacker, Re claimer, ship loader etc.
-Construction & maintenance step up / step down 70 KV power transformers
-Supervise & Performing Terminate, splicing HV & MV of cables and testing
-Setup maintenance schedule of equipment and man power planning
Remark: Resign own my request
10. Jul, 1984 – January, 1990
Company: PT. Sangkulirang Bhakti Ply Wood Company Indonesia
Project Title: Power Plants, Process Plant & Maintenance
Position: Electrical Supervisor
Job Description & Responsibilities
-Construction, pre commissioning & commissioning electrical & instrumentation system
-Installation cabling system, scheduler plant maintenance
-Setup schedule maintenance, setup maintenance budget, man power and materials
-Rectify electrical troubles shorting and generator maintenance
-Provide weekly report project construction, provide as built drawing
Remark: Completed Project & resign own my request
11. February, 1982 – Jun, 1984
Company: Bechtel INC Indonesia
Project Title: Refinery Project & Project Maintenance
Position: Electrical Foreman
Job Description & responsibilities
-Installation cabling system, power, control, instrument and electrical building
-Prepare daily report project activities, provide check list & test sheet cables ladder, cabling system, lighting,
Electrical panel & equipment
-Plant maintenance, lighting, motor control center,
Remark: Completed Project.
Page 5 of 5