Post Job Free
Sign in

Project Power Plant

Location:
Balikpapan, East Borneo, 76115, Indonesia
Salary:
Negotiable based on my Qualification
Posted:
July 29, 2013

Contact this candidate

Resume:

Curriculum Vitae Construction & Pre Commissioning

Personal Profile

Name : Mujiono

Nationality : Indonesia

Religion : Moslem

Sex : Male

Marital Status : Married

Date of Birth : February 13, 1963

Passports No : A1162631 Valid up to Sept 2016

Resident Address : Balikpapan Regency Blok: BJ No-8.

JL Besakih – IX Balikpapan 76115

Résident Phone : +62-542-*******.

Mobile Phone : +62-813-******** / +628*********

E–mail : ab20yr@r.postjobfree.com

Language : Indonesia / English

Over 30 years’ experience as construction, pre-commissioning & commissioning at various project oil & gas, power plant

Leading all functions of project management including planning, designing, processing, specs-approval, managing staff,

supervising sub-contractors, QA/QC management, budgeting, scheduling, progress reporting and timely completion of projects

Objective Statement

• Challenging position to proficiently manage, oversee and execute large-scale of fabrication, construction, pre

commissioning & commissioning of projects Top Site module, E – House module, Process Platform Oil & Gas, Coal Fire

Steam Turbine, Combine Cycle Power Plant, Open Cycle Gas Turbine, Water Treatment Plant and Water Injection Plant

Core Competency

• Thorough knowledge of legal issues and safety standards.

• Effective time management and logical decision-making ability.

• Excellent communication skills.

• Capacity to motivate, lead and boost morale of team.

Key Project Lead Activities:

• Oversee construction, pre commissioning & commissioning of special projects from inception to planning to completion.

• Coordinated design and planning to ensure design standards are met and maintained.

• Conducted and performed site surveys during various stages of the construction project.

• Analyzed vendor proposals and selected the appropriate one for each project.

• Reviewed construction technical documentation for accuracy, feasibility, quality and conformance to industry standards

& company spec

• Supervised and guided other staff throughout the construction, pre commissioning process and commissioning.

Other Management Performance:

• Divided massive construction, pre Commissioning & commissioning project into small and easy steps, enabling

engineers to perform their functions as per their area of expertise.

• Arranged work-force as per requirement of project and dispatched schedule to worksite.

• Acted as a link between clients and workforce, reviewed work on clients’ behalf and issued reports to clients

• Ensured all construction pre commissioning processes were completed as per safety and quality guidelines.

• Contacted contractors regularly for project development updates.

Educational Qualifications

• Bachelor’s Electrical Engineering Institute Technology Pembangunan Surabaya GPA.3.11

Skills and Expertise

-Project Management, Steel Fabrication, Construction Management, Pre Commissioning & Commissioning

-Top Site & Process Module Oil & Gas, Power Plant, Water Injection & Water Treatment Plant

-Combine Cycle Power Plant, Coal fire steam turbine, Open Cycle gas turbine, 70 KV & 150 KV Substations

-Construction power distribution system and transmission Line: 3.3 K, 6.6 KV, 11 KV, 70KV

-Distributed Control System, Calibration, termination & splicing HV cables and Hi pot testing

-Steel Fabrication, erection, welding, Sand blasting, painting, piping, mechanical, equipment Installation and E & I

Hook Off shore, E&I, Cabling System, Site Pre Commissioning and commissioning whole plant, Etc

-Mechanical Completion: Structure, Piping, Architectural, Painting, Mechanical, Electrical & Instrument

-MS application: MS office, MS project, MS Visio, Computerize Maintenance Management System (CMMS)

Course Attended

-Electrical Industry in the Electrical Industries Training Center Certificate

-Basic Power Distribution and Transmission Lines State Owned Company of Electricity Certificate

-Advanced Power Distribution and Transmission Lines State owned Company of Electricity Certificate

-Cherry picker, crane truck operator, lifting, rigging, driving license

-Integrated Commissioning and Progress System Training (ICAPs)

-Basic & Advance welding government training center

-Programmable Logic Control & Distributed Control System.

-Leadership and Work permit system

-In house Training Project Management certificate.

-Safety Training Observation Program certificate.

-Advance Safety Auditing certificate.

-HSE awareness & Scaffolding certificate

-Fire Fighting and Breathing Apparatus certificate

-Risk Assessment & Awareness and prevention Certificate

-Shipyard Safety Instruction Course (SSIC) Singapore certificate

-Risk Management Biz safe Level 2 Singapore Certificate

-HUET & Sea Survival Training Certificate

Work Experience

1. April, 2013 - Present

Company: PT. Gunanusa Utama Fabricators EPSCC Oil & Gas

Position: Pre Commissioning Manager

Propose: Contract Status

Client: Total Myanmar

Project Title: Subsidence Yadana On & Offshore Top Site Module Brown Field Project Myanmar

Duties and responsibilities:

-Approve a contract strategy, pre – commissioning and commissioning scope of work, commissioning organization

Requirement, training requirement, commissioning/start up spare parts

-Approve commissioning organization procedure and pre – commissioning and commissioning preparation

-Review and giving an inclusion to the general pre-commissioning procedure i.e.: Hydro Test, Flushing, Piping, Draining &

Drying, Gross leak test, Flange management, Inst/System/Telecom, Electrical, Instrument, Calibration, and ICAPS -

Execution Integration Procedure

-Review and give an inclusion to Pre-commissioning dossier i.e.: Sample Dossier, ME/PI/STR/INST/ ELC/TLCOM

Input data Base of ICAPS Program and Administrators,

-System/subsystem dossier c/w all required forms, mark-up drawing, index’s, Compile pre-commissioning dossier

-Arrange and review Compilation to dossier Test sheet/Check list, Status Index’s, as per sub-system

-Ensure that all Quality and Safety requirements set by Management is clearly understood by the workforce

-Review the progress of Updating Pre-commissioning Status Index’s, updating Pre-commissioning Progress Report and

Updating List of Modification / as built drawing as per Actual Installation

-Control pre-commissioning and commissioning activities and define a pre-commissioning & commissioning scope

Of work, commissioning organization requirements, training requirements etc

Project status: on going

2. March, 2012 – March, 2013

Company: SIEMENS PTE LTD EOG Division Singapore

Position: Construction & Hook up Manager

Propose: Contract Status

Project Title: GLNG Project E-House Module

Duties and responsibilities:

-Review & approve AFC & As built drawing, procedure and mechanical completion of: Structure, architectural, Piping, E&I

-Supervision & Controlling site activities: fabrication, erection, construction, Equipment installation

-Lead of site engineer, Safety officer, production, Inspector and document controller

-Lead of pre commissioning & commissioning: E & I, Mechanical & load out team

-Responsible for managing site team & work in partnership with the Contractor

-Supervision construction works based on designs, specification, standards and HSQE requirements

-Liaise with other discipline Safety, engineering, project engineer, planer etc

-Monitoring installation equipment, mechanical completion (ITR), punch clearance, etc

-Review & approve Materials Data Register and closed out project document etc

Project Status: Completed Contract

July, 2011 – Feb, 2012

Position: Construction & Hook up Manager

Propose: Contract Status

Page 2 of 5

Project Title: Water Injection and Water Treatment Plant Module FPSO Project

Duties and Responsible:

-Review and approve AFC & As built drawing, procedure, scope of work and contract from initiation to completion of project

-Supervise and monitoring fabrication, erection: structural, piping, mechanical, painting and E&I

-Monitoring procurement materials status and approve receiving materials

-Installation: Corrosion Inhibitor, Feed Pump, Reverse Osmosis & Sulphate Removal Unit

-Mechanical completion piping: line check, pressure test, flushing, drying, leak test, reinstatement, flange management

-Approved mechanical completion document: structural, piping, mechanical, painting, E&I

-Mechanical completion E&I: Cables Testing, continuity check, Loop check, calibration

-Review & approve Mechanical Completion document: Structural, Piping, Mechanical, painting, E & I

-Lead site team: Engineer, Safety, Supervisor, Inspector and load out team, clearance punch list

-Lead Pre fabrication & fabrication, construction and yard pre commissioning & commissioning package

-Chair man progress meeting, approve MDR and Completion and closed out document

Status: Project Completed

March, 2011 – Jun, 2011

Position: Construction Manager

Propose: Contract Status

Project: 11 KV Substations E House Onshore Barzan Project

Job Description & Responsibilities

-Supervise Sub Contractor Fabrication, erection: Steel structure, architectural, painting

-Supervise Installation, pre commissioning & commissioning equipment: 11 KV switch gears, 400 V MCC, power Transformer,

HVAC, cable ladder installation, Cabling system electrical & instrument, function test equipment

-Supervision installation equipment LV switch gear, HV switch gear, transformer, HVAC, instrument

-Approved mechanical completion: structural, painting, E & I & punch list clearance, etc

-Lead site team: Engineer, Safety, Inspector and load out team

-Chair man progress meeting, approve MDR and closed out document

Status: Project completed

3. May, 2007 – Feb, 2011

Company: Total Indonesia E & P Oil & Gas Indonesia

Project Title: Oily Water Treatment Top Site Module On & Offshore site

Project Title: Gathering Testing Satellite Top Site Module Tunu Phase -12 & 13A on & Offshore

Project Title: Bottle Necking Bekapai Brown Field Project On & Offshore

Propose: Contract Status

Position: Construction & Pre Commissioning Superintendent

Job description & Responsibilities

-Supervisory yard fabrication & construction phase and hook up offshore site

-Coordinate, review and approve the project construction schedule

-Supervise the Construction, Pre Commissioning, and post startup support of projects activities

-Ensure that all Construction QC Manuals/Procedures are implemented throughout the project

-Review drawing, Specification, Procedure, FATs electrical & instrument

-Lead & Supervise production, QA/QC, Per Commissioning and Punch Clearance team

-Liaise with other discipline Safety, engineering, project engineer, planer, cost control etc

-Ensure Project Quality and standard maintained at location within the project budget and schedule

-Review & approved, Mechanical completion: check list, test sheet Structure, Mechanical, Piping, Painting, EI

Remark: Completed project

4. October, 2005 – April, 2007

Company: PT.Kaliraya Sari EPC Oil & Gas Indonesia

Project Title: Sapi Development on & offshore Project Top Site Module, Process Module and Pipe line

Client: Chevron Indonesia EP oil & Gas Company

Project Title: Compression Installation Brown Field Project

Client: Virginia Indonesia Oil & Gas Company on shore

Position: Construction, Installation & Commissioning Manager

Job description & Responsibilities

-Manage from initiation to completion: fabrication, construction: Structural, Piping, Painting, Mechanical, Electrical & Instrument

-Lead Engineering team, Pre commissioning, Commissioning and post startup support of projects consist of:

Well head, Process Platform, 10” Pipe line 10 Km, Compressor and hook up off shore site

-Promote quality awareness throughout the project and company organization.

-Responsible and execution of construction, pre commissioning & commissioning, handover and close-out of projects

-Supervise and guide the department to ensure that their work is of the required quality

-Lead and supervise site team: production, structure, piping, mechanical, QA/QC, Electrical & Instrument

-Review & approval project dossier consist of: MC, DMCC, LUN, Pre Commissioning and RFCC

Remarks: Completed Project

5. June, 1998 – September, 2005

Company: VICO Indonesia E & P Oil & Gas Indonesia

Project Title: On shore Brown Field Project

Position: Construction & Commissioning Superintendent

Job description & Responsibilities

-Supervise and manage of construction project and contractor from initiation to completion of project

-Installation flow line, well head, HP, LP, VLP compressor

-Lead project team to upgrading or modified existing plant facilities & major project.

-Lead production, QA / QC, Pre commissioning, commissioning team & perform testing equipment

-Budgeting of project and approved construction progress report & FAT Electrical, Instrument, mechanical

-Lead & Supervise team: Safety, Civil & Structural, mechanical, piping, painting, E&I, Pre commissioning & commissioning

-Approved mechanical completion: structure, piping, painting, electrical & instrument, Close out & Turn over project document

Remark: Completed Contract

6. November, 1995 – May, 1998

Company: Rolls Royce Industrials Power System Samarinda East EPC Indonesia

Project Title: 60 MW Combine Cycle Power Plants

Client: Indonesia Government (State Owned Company of Electricity Indonesia)

Position: Electrical & Materials Engineer

Job description & Responsibilities

-Construction, Pre commissioning, Commissioning and Start up of 60 MW Power Plant consist of:

-2 x 20 MW gas turbine & 1 x 20 MW steam turbine, 2 x MCC gas turbine generator, 1 MCC HRSG

-150 KV Substation, gas treatment plant, water treatment plant, cooling water plant, black start generator,

Infrastructure building, lighting, HVAC, etc

-3 x 30 MVA step up power transformer 11KV to 150 KV and 3 x 2, 5 MVA Auxiliary transformers

-Responsible and accountable to manage the execution of construction, commissioning, handover document,

E & I Commissioning coordinator, Inspection of electrical equipment & materials

-Review AFC drawing, contract & client spec refer to international standard

-Prepare progress report project, approved & review as built drawing; provide MC ITR Electrical & Instrument & Turn

Over Document and Closed Out Document

Remark: Completed Project

7. February, 1995 – October, 1995

Company: BOW VALLY LTD Oil Company JOB Pertamina Indonesia

Project Title: Open Cycle Power Plants, Water Treatment Plant and Water Injection Plant

Position: E & I Superintendent

Job description & Responsibilities

Construction, pre commissioning, commissioning & start up of:

-2 x 3 MW open cycle gas turbine Generator, switch gear and generators MCC, water treatment plant & water injection plant,

6.6 KV switch gear, water tank capacity 150.000 BPD

-Supervise construction & pre commissioning and commissioning team, planning project activities

-Responsible and accountable to manage the execution of construction, pre commissioning, commissioning

-Prepare progress report project, plant maintenance during warranty, setup construction activities

-Construction, commissioning of 6,6 KV over head line power distribution & under ground

Remark: Completed Project

8. June, 1994 – January, 1995

Company: PT. Dermaga Perkasa Pratama Indonesia

Project Title: Coal Terminal Transshipment

Position: Electrical & Instrument Inspector

Job description & Responsibilities

-Inspect installation of electrical: Cables ladder & tray installation, cabling system MV cables, power, control, lighting,

Instrument, cabling termination and witness cables testing

-Inspect electrical equipment installation: 6.6 KV Switch gears, over land conveyor MCC, re claimer, Stacker, etc

-Generate & clearance punch list, witness function test electrical and instrument device

-Supervise electrical & instrument sub contractor and monitoring site activities

-Supervise & witness termination, splicing MV cables and testing

Remark: Completed project

9. February, 1990 – May, 1994

Company: PT. Kaltim Prima Coal Indonesia

Project Title: Coal Fire Power Plants 10 MW, 70 KV Sub Station, 70 KV Transmission Line

Position: Electrical Supervisor & Commissioning Electrical Coordinator

Job description & Responsibilities

-Construction, commissioning, start up and maintenance of 2 x 5 MW coal fire steam turbine

-3 x 2 MW diesel generator, 70KV & 11KV sub station,

-70KV transmission line, 11 KV power distribution over head line & underground system

-Maintenance HV switch gears, steam Turbine MCC, over land Conveyor switch gear

-Trouble shorting electrical overland conveyor, Stacker, Re claimer, ship loader etc.

-Construction & maintenance step up / step down 70 KV power transformers

-Supervise & Performing Terminate, splicing HV & MV of cables and testing

-Setup maintenance schedule of equipment and man power planning

Remark: Resign own my request

10. Jul, 1984 – January, 1990

Company: PT. Sangkulirang Bhakti Ply Wood Company Indonesia

Project Title: Power Plants, Process Plant & Maintenance

Position: Electrical Supervisor

Job Description & Responsibilities

-Construction, pre commissioning & commissioning electrical & instrumentation system

-Installation cabling system, scheduler plant maintenance

-Setup schedule maintenance, setup maintenance budget, man power and materials

-Rectify electrical troubles shorting and generator maintenance

-Provide weekly report project construction, provide as built drawing

Remark: Completed Project & resign own my request

11. February, 1982 – Jun, 1984

Company: Bechtel INC Indonesia

Project Title: Refinery Project & Project Maintenance

Position: Electrical Foreman

Job Description & responsibilities

-Installation cabling system, power, control, instrument and electrical building

-Prepare daily report project activities, provide check list & test sheet cables ladder, cabling system, lighting,

Electrical panel & equipment

-Plant maintenance, lighting, motor control center,

Remark: Completed Project.

Page 5 of 5



Contact this candidate