PERSONAL DATA Permanent address : Complex Mutiara View Block B4
No. 18 Tiban - Sekupang Batam - Indonesia
29432
Mobil Phone : +62-852-********
Passport No : R 455713
E-mail address : ab201r@r.postjobfree.com
ab201r@r.postjobfree.com
Place / Date of Birth : Plaju / 28 October 1972
BST (Basic Safety Training) Sea Survival, Fire
ADDITIONAL COURCE / ATTENDENT & Fighting & HUET Conducted by PT. Expro Indonesia -
SKILLS Batam
BST (Basic Safety Training) H2S Awareness Conducted
by PT. Fergaco Indonesia - Jakarta
In-House Course 80 Hours Internal Welding
Inspector Course Conducted by PT. Rotary
Engineering Indonesia - Batam
MicroSoft Literate (Ms.Excel, Ms.Word, Ms.
Powerpoint)
Auto-CAD
A highly adaptable professional Construction &
EXPERIENCE SUMMARY Commisioning Team [Piping, Structure, Mechanical,
HVAC, Architectural, Electrical and Instruments
Section] with total more than 16 year's extensive
experience on Oil and Gas (onshore & offshore) such
as: Well Head Platform, CPP Platform, Jacket
Platform, FPSO Top Side Module Process & Sub Sea
installation, Living Quarter Accommodation,
Electrical House, including fabrication support
Equipment such as: Separator, Gas Scrubber, Flare
Boom, K.O Drum, Hydro Cyclone, Metering Skid,
Surge Tank, Atmospheric Tank and Choke Manifold.
Fabrication & Installation for Refinery
Petrochemical, Power Plant, ship Building New /
repairs. Familiar with international standard and
codes, read out all engineering drawing and QA/QC
documentation.
01 October 2012 Until Present Duties & Responsibility:
PT. Rajawali Swiber Cakrawala - Provide technical support to contractors and review
Jakarta procedures submitted by contractors to ensure
Position : Field Engineer compliance with schedules, and standards and
Location : Batam - Indonesia. specifications.
Interprets and resolves questions regarding
designs, codes and specifications, as directed by
the Project Manager.
Review shop drawings for conformance with the
contract and ensure information is communicated to
Contractor Superintendent or supervisor.
Monitor fabrication and installation for
conformance to structural drawings.
Provides technical assistance to Construction
Superintendent,General Superintendent, and
Supervisors when requested.
Assists in the preparation of field design changes
and updates drawings for field use as required by
field conditions and regulations.
Provide technical engineering information and
interpretation of plans, detail sheets and
specifications for contractors.
Prepares field purchase requisitions, and procures
PROJECT INCHARGE: construction material.
South Belut Project _ Conoco manpower, schedule and cost data.
Phillips Indonesia. Inc. - Top Side Provides assistance to the contract team in
& Sub Sea Fabrication & administering and coordinating the contract.
Installation. Prepares schedules, reviews claims and engages in
quality tracking.
Prepares reports as required: progress, material,
procurement, status, etc.
Reports costs, progress, activity and other
matters.
Report accurate quantities for labor cost reports,
accurately monitor material ledgers to determine if
quantities remaining in the estimate are sufficient
to complete the project in the field.
Ensure construction work complies with all
engineering standards, codes, specifications and
design instruction.
Establishes and maintains necessary supporting
records and files.
01 June 2011 Until 29 September 2012 Duties & Responsibility:
Monitoring/ Control all activity by Contractor /
Siemens PTE Ltd - Singapore Sub-Contractor as per Project Specification &
Position : Field Engineer - Site Procedure.
Representative. Witness and Review all progress activity as per
Location : Batam - Indonesia Inspection Test Plan (ITP) such as: Material
Verification, fit-up, Dimensional Control
PROJECT INCHARGE: before/After Welding, Visual Welding and witness
Papa Terra Development Project NDT execution.
E-House P-61 - Floatec De Mexico S.A Check and monitoring Structural Fabrication,
installation HVAC Ducting as per Ducting &
Cendor Phase 2 FPSO Project - Instruments Diagram.
Petrofac Malaysia. Review work packs for completeness prior to
documentation package compilation.
Report to Project Manager for Activity and Daily
Report.
03 January 2011 Until 31 May 2011 Duties & Responsibility:
PT. Nippon Steel Batam - Offshore Monitoring and Coordinate all QA/QC section, such
Service as: Welding Structure, Piping Process, E&I
Position : QA / QC Inspector Installation, Documentations and procedure.
Coordinator. Attend daily / weekly progress meeting with Client
Location : Batam - Indonesia and production Area Concerned people for progress
PROJECT INCHARGE: activity.
Total E&P Indonesie South Mahakam Liaise with Third Party Inspectors; Customer and
Field Development Phase 1&2 Project. Certifying Authorities in relation to work scopes.
Report to QA/QC Manager for Activity and Daily
Report.
09 September 2010 Until 09 December Duties & Responsibility:
2010 Monitoring and inspection all activities during new
NUCOASTAL ENERGY PTE.LTD modification Process Installation of Wellhead flow
A Subsidiary of Coastal Energy. Co - line (Upstream & Downstream), Water Injection Line
USA (Hydro Cyclone) Process and make sure all job
Position : QA / QC Inspector- Client installation as standard and specification.
Representative. Checking and Monitoring all activity as per QHSE
Location : Songkhla - Thailand procedure, such as: JRA (Job Risk Assessment) or
offshore - Songkhla platform - A, B, JSA (Job Safety Analist) and Work Permitt.
C Attend daily progress meeting with OIM and
production Area Concerned people for progress
activity and goal the project.
Report to QA/QC Manager for Activity and Daily
Report.
22June 2010 Until 22 August 2010 Duties & Responsibility:
SAPURA ACERGY SBN.BHD Monitoring and inspection all activities during
Location : Bredero Shaw Kabil - pipe laying and pipe coating, make sure the
Batam Tallyman for pipe laying, carried out the jobs as
Position : QA / QC Inspector- Client per standard and specification.
Representative. Coordination with Contactor for any problem matter
PROJECT INCHARGE: and make sure that is problem solved.
Apache Devil Creek Development Report to QA/QC Manager for Activity and Daily
Project. Report.
17 September 2009 Until 20 June 2010 Duties & Responsibility:
Check and Review Specification & ITP as Code &
PRODUCTION TESTER INTERNATIONAL PTE. Standard.
LTD Make line sizing calculation as per P&ID for
Position : Project Engineer process piping.
Location : Batu Ampar - Sending all Construction drawing to 3rd Party for
Batam - Indonesia review and approval.
Check and Review all Constructions Drawing from
PROJECT INCHARGE: engineering Designer before Issued to Production
WELL UNLOADING PACKAGE- CHEVRON for fabrication.
THAILAND Check & Review Mechanical Calculation such as
DESANDING SYSTEM - MURPHY SABAH OIL Pressure Vessels, K.O Drum, Surge Tank, and Water
CO.LTD Degasser from Fabricator before submitted to 3rd
Party Classification.
Make Project Schedule consolidation with Flow chart
organization concerning peoples.
Checking and make request M.T.O as per Construction
Drawing with Standard Specification Material.
Cooperation and coordination with engineering
project team for make minimize mistake job matter.
Prepare for Hydro test package, line checking,
punch list and reinstatement until pre
commissioning.
Handover with owner production Engineer for process
as per P&ID piping process, Instrumentation and
electrical for commissioning assignment.
Make report to Project Manager and client Rep
25 May 2009 Until 10 September 2009 Duties & Responsibility:
VME PROCESS ASIA PACIFIC PTE LTD Directly responsibility to the Construction manager
Position : Production Engineer on Project Preparation, Planning and Work
(Piping & Structural) Scheduling. Maintaining of Engineering, Quality
Location at PT. Utraco Yard Bt. Control, Document, Codes, Plant and specification.
Merah - Batam - Indonesia Authorizing materials take-off for additional work
PROJECT INCHARGE: and / or changes in the work at the site.
JUBILEE FIELD UNIT- FPSO TOP SIDE Establishing field engineering coordinating
PROJECT - TULLOW GHANA LIMITED procedure covering the above responsibility
activities.
Verifying by monitoring / auditing / surveillance
that the site activities relating quality are being
implementation accordance with Quality Plan.
Coordinating engineering matters with the OWNER's
representatives in charge, third party and Sub
contractor and Vendor.
20 December 2008 Until 20 May 2009 Duties & Responsibility:
ASL Marine Pte Limited - Singapore Prepare welders qualification test (WQT) and
Position : QA/QC Structural Welding Welding Procedure qualification test (WPQT) from
Inspector ordinary carbon steel material as per AWS D1.1
Location at PT. ASL Shipyard Tanjung Check & monitoring activity sub-contractor as
Uncang - Batam - Indonesia project assignments.
PROJECT INCHARGE: Liaise with Third Party Inspectors; Customer and
THRUSTER CANISTER BULLY 1 & 2 Certifying Authorities in relation to work scopes.
FRONTIER DRILLING INTERNATIONAL. INC Liaise with Client Quality Representatives.
- USA. Ensure certification complies with BoM (Biil of
Material) and contract requirements.
Make daily report to Project Manager for progress
report.
16 July 2007 Until 30 November 2008 Duties & Responsibility:
PT. EXPRO INDONESIA Directly responsibility to the Project manager on
A Subsidiary of EXPRO GROUP - UK Project Preparation, Planning and Work Scheduling.
Position : Project Engineer Maintaining of Engineering, Quality Control,
Location : Document, Codes, Plant and specification.
PT. Profab Indonesia Batu Ampar Co-ordinate with Surveyor Class/ Plant Operation
Batam team priors to access to Live Plant before and
PT. Heat Exchanger Indonesia - Batu during the process to carry out any Construction
Ampar Batam - Indonesia works.
PT. Tjokro Bersaudara Batu Ampar Prepare Technical Report and Correspondence,
Batam - Indonesia Construction schedule and monthly progress reports
and reporting to Project Manager for Project
PROJECT INCHARGE: progress status.
RUBICON VANTAGE FPSO TOP SIDE Conduct weekly and monthly progress meeting with
PROJECT Contractors, Trade Staff and Surveyor Class and
SEPARATION SYSTEM - BP TANGGUH prepared minute of meeting.
Establishing field engineering coordinating
procedure covering the above responsibility
activities.
Verifying by monitoring / auditing / surveillance
that the site activities relating quality are being
implementation accordance with Quality Plan.
03 April 2007 Until 03 July 2007 Duties & Responsibility:
Global Process System Pte.Ltd Conduct receiving inspection of material and
Singapore evaluation of mill certificate in accordance with
Position : QA/QC Inspector project specification
(Piping & Structure) Review specification, ITP, WPS and Welders
Location at PT. TOJ Sekupang - Qualification Record Involved in any process
Batam - Indonesia Check WPS & PQR at the stage of project
commencement
PROJECT INCHARGE: Check gaps prior to commencement of welding.
MAARI FIELD DEVELOPMENT PROJECT Request applicable NDT after welding complete as
OFFSHORE NEW ZEALAND - TPOT per inspection test plan.
Prepared document such as material heat number
traceability, hardness test report, PWHT's chart,
NDT request.
Reviewed radiography interpreter (RT/UT/MT/PT) sign
report.
Prepare release report to concerning people e.g.:
ABS, Client Representative, etc.
Control the accuracy of all reports produced by
certification section
11 September 2006 Until 31 March Duties & Responsibility:
2007 Responsibility to ensure piping fabrication
PT. Nippon Steel Batam - Offshore activity is carried out as per approved
Service construction drawing, fabrication specification,
Position : QA/QC Piping Inspector and welding procedures.
Witness/verify welder's qualification test.
PROJECT INCHARGE: Perform inspection during fabrication activities as
SISI NUBI PHASE I - Total E & P planned on Inspection and Test Plans, monitoring
Indonesie and reporting on the quality of the installation of
Manifold Well Head Platform piping systems, to include fitting and welding, and
-MWPN Deck - 4 Piles monitor production processes.
-WPN2 Deck - 4 Piles Ensuring all visual inspection is undertaken in a
-MWPS Deck - 8 Piles timely manner. Handling all quality issues with
project management and the Client's representatives
on site.
Prepared document such as material heat number
traceability, hardness test report, PWHT's chart,
NDT request.
10 September 2005 Until 10 September Duties & Responsibility:
2006 Monitoring all quality and progress of project
Compass Energy ltd. Singapore. which is constructed by contractor.
Joint Operation Body Review all document related to QC department, steel
Production Tester International ltd. structure, piping, HVACs, Electrical,
Singapore Instrumentation, Insulation, and Painting.
Gogain Investment ltd. Singapore Advise assist contractor solve any problem
Position : Project Engineer regarding construction activities.
Location : Jaya Asiatic Shipyard Report to Project Manager for daily activity and
Tanjung Uncang. weekly progress report.
PROJECT INCHARGE:
Soraya -Rig Accommodation Facilities
200 Men project.
10 March 2004 Until 08 September Duties & Responsibility:
2005 Assist Project Engineer make Schedule and progress
PT. Expro Indonesia Batam Base - project
Batu Ampar - Batam - Indonesia Make line schedule and than making line check for
Position : Assistant Project hydro test package as per P and ID
Engineer Make drawing such as: piping isometric, pressure
vessel,Water Degasing, K.O Drum & Burner Boom as
PROJECT INCHARGE: per G.A drawing
Pearl Oil Project -Jambi. Sumatra ( Make M.T.O (Material Take Off) as per Drawing and
Production Facilities & Pipe Line) Client Specification, and issued materials to
Cuulong Project -Vietnam ( production.
Separation System ) Report to Project Engineer & Project Manager.
Nangnuan Project - Thailand
(Production Facilities)
Kufpect Project - Seram Island
(Production Facilities)
Medco Tiaka Project - Sulawesi
(Production Facilities)
27 December 2002 UNTIL 31 January Duties & Responsibility:
2004 Conduct receiving inspection of material and
PT. J. Ray Mc Dermott Indonesia, evaluation of mill certificate in accordance with
Batam Fabrication Yard project specification
PT. J. Ray Mc Dermott Indonesia is a Inspect pre-rolling of pipe activities e.g. :
foreign construction and engineering fit-up, quality w / assistance of DC personnel
services company for on shore / off Check gaps prior to commencement of welding
shore oil / gas, jacket & platform Review specification, ITP, WPS and Welders
and heavy weight accessories Qualification Record Involved in any process
industries. Check all parent metals surface to be welded to
Position : Structural / Piping QC avoid misalignment and bad workmanship
Welding Inspector Check all weld profile during fabrication to ensure
all under-fill and undercut remedied
Check application of preheat on each parent metal
as stipulated by the WPS/PQR of AFC Drawing
Check WPS & PQR at the stage of project
commencement
PROJECT INCHARGE: Check NDT Requirement & Request applicable NDT
Dominion Exploration and Production after welding complete as per inspection test plan.
Inc, DEVIL TOWER - MISSISIPPI CANYON
Block 773 (SPARHULL PROJECT) Prepare release report to concerning people e.g. :
RANG DONG FIELD DEVELOPMENT PROJECT Chief Inspector, Client Representative, etc.
- JVPC OFFSHORE VUNG TAU, VIETNAM Prepare punch list and submitted to Fabrication
FPSO - CONOCO BELANAK PROJECT section as per review by Client Representative.
Control the accuracy of all reports produced by
certification section prior to signature.
15 November 2001 Until 15 November Duties & Responsibility:
2002 Checking & monitoring all activity for Ship
Asetanian Marine pte.ltd - Singapore modification as per construction drawing or
Electrical & Instrumentation diagram or schematic
Joint Operation Production Tester drawing.
International (Tricom) Batu-Ampar Check and monitoring Material in coming as per
Position : QA/QC Inspector - Owner Classification Role and make sure all is acceptable
Representative condition.
Reviewed & Witnessed all testing activity such as:
PROJECT INCHARGE: Hydrotesting, Leak testing and Vacum Testing, and
Station Support - V Project make sure all is acceptable as per Classification
Location : ASL Shipyard Tanjung Role & Standart.
Uncang - Batam - Indonesia Report to Project Manager for daily activity
report.
30 June 1998 until 2 November 2001 Duties & Responsibility:
PT. ROTARY ENGINEERING INDONESIA Verifying by monitoring / auditing / surveillance
Batam Fabrication Yard that the site activities relating quality are being
PT. ROTARY ENGINEERING INDONESIA is implementation accordance with Quality Plan
under ROTARY ENGINEERING LIMITED Coordinating engineering matters with the OWNER's
SINGAPORE is a foreign construction representatives in charge, third party and Sub
and engineering services company for contractor and Vendor.
refinery, fabrication & installation Ensuring that the subcontracting documents are in
pipe spools. compliance with the technical requirement for the
Position : Production Engineer. project in aspects of quality and quantity
Ensuring development of complete site office
PROJECT INCHARGE: engineering records and as-built drawing with
Mitshui Bispenol Singapore (MBS1) assistance of the home office engineering group
Project, Toyo Engineering Coordinating hand over procedure effort among all
Corporation. parties concerned, including compilation of
Syngas (Singapore Gasification) documents required for facilities turnover to
project, The M.W. Kellogg OWNER.
SOP (Singapore Olefins) project, The
M.W. Kellogg
SAP (Singapore Acytile Project)
Foster Wheeler
RIF (Refinery Interface Facilities)
project, Foster Wheeler
Maxus Widuri Project, Powell
Electric Co
Mitshui Bispenol Singapore (MBS2)
Project, Toyo Engineering
Corporation.
10 October 1997 Until 22 April 1998 Duties & Responsibility:
Company : Shin Wha Engineering Performing Inspection and controlling that the
Cooperation fabricated project has mach the requirement of
Client : Toyo Engineering specification.
Corporation Coordination with department involved regarding the
Position : Project Engineer job progress date to date basis.
Location : Paiton Steam Power Plant Lease with Client in the Matter of overall Quality
Phase I Paiton - East Java - inspection.
Indonesia Overseeing the compilation of progressed document
and reviewing the isometrics used and issuing for
as built.
Report & responsibility direct to Project Manager.
6 April 1997 Until 25 September 1997 Duties & Responsibility:
Responsibility for the Mechanical Completion
Company : TAKADA - SURYA BESINDO J/O activities for successful completion of the
project.
Client : TORAY ENGINEERING LIMITED Coordinating activities of each discipline staffs
Position : Mechanical Engineer to ensure the progress and maximum targets.
Location : IBP - 2 Project Tangerang Controlling the pre commissioning and commissioning
- Banten - Indonesia as per system definition on time.
Monitoring progress outstanding of punch category
B,C,D to ensure are not delay to handed over of MC.
Report to Project Engineer & Project Manager.
12 October 1996 Until 26 February Duties & Responsibility:
1997 Make drawing such as piping Isometric, piping Plan,
Company : PT. TRUBA JURONG new drawing or modification as revised by field (as
ENGINEERING Built Drawing)
Client : IHI ENGINEERING LIMITED - Check actual material incoming with M.T.O as per
JAPAN Packing list and issued materials matching to
Position : Draftsman Piping fabrication materials demand form.
Location : Pindo Deli II Project Report to Piping Engineer or Project Engineer.
Karawang - West Java - Indonesia
5 August 1995 Until 30 August 1996 Duties & Responsibility:
Company : PT. TERGAYU JAYA Responsibility direct to Project Engineer for
Client : PT ANDAYANI MEGAH - GAJAH progress project.
TUNGGAL INDUSTRIAL ESTATE Check & Monitoring M.T.O as Isometric drawing
before issued to production.
Position : Piping Engineer. Check & Monitoring activity piping fabrication, and
Location : AM III Project Gajah installation pipe spool on site.
Tunggal Tangerang - Banten - Coordination with Client Representative for any
Indonesia problem and any modification as per Client comment
and requested.
Prepare Line check punch list, Hydro testing
package, Reinstatements.
Make Daily Report to Project Engineer & Project
Manager.