Post Job Free
Sign in

Project Manager Engineer

Location:
Batam, Riau Islands, 29432, Indonesia
Salary:
SGD 6500/month
Posted:
July 29, 2013

Contact this candidate

Resume:

PERSONAL DATA Permanent address : Complex Mutiara View Block B4

No. 18 Tiban - Sekupang Batam - Indonesia

29432

Mobil Phone : +62-852-********

Passport No : R 455713

E-mail address : ab201r@r.postjobfree.com

ab201r@r.postjobfree.com

Place / Date of Birth : Plaju / 28 October 1972

BST (Basic Safety Training) Sea Survival, Fire

ADDITIONAL COURCE / ATTENDENT & Fighting & HUET Conducted by PT. Expro Indonesia -

SKILLS Batam

BST (Basic Safety Training) H2S Awareness Conducted

by PT. Fergaco Indonesia - Jakarta

In-House Course 80 Hours Internal Welding

Inspector Course Conducted by PT. Rotary

Engineering Indonesia - Batam

MicroSoft Literate (Ms.Excel, Ms.Word, Ms.

Powerpoint)

Auto-CAD

A highly adaptable professional Construction &

EXPERIENCE SUMMARY Commisioning Team [Piping, Structure, Mechanical,

HVAC, Architectural, Electrical and Instruments

Section] with total more than 16 year's extensive

experience on Oil and Gas (onshore & offshore) such

as: Well Head Platform, CPP Platform, Jacket

Platform, FPSO Top Side Module Process & Sub Sea

installation, Living Quarter Accommodation,

Electrical House, including fabrication support

Equipment such as: Separator, Gas Scrubber, Flare

Boom, K.O Drum, Hydro Cyclone, Metering Skid,

Surge Tank, Atmospheric Tank and Choke Manifold.

Fabrication & Installation for Refinery

Petrochemical, Power Plant, ship Building New /

repairs. Familiar with international standard and

codes, read out all engineering drawing and QA/QC

documentation.

01 October 2012 Until Present Duties & Responsibility:

PT. Rajawali Swiber Cakrawala - Provide technical support to contractors and review

Jakarta procedures submitted by contractors to ensure

Position : Field Engineer compliance with schedules, and standards and

Location : Batam - Indonesia. specifications.

Interprets and resolves questions regarding

designs, codes and specifications, as directed by

the Project Manager.

Review shop drawings for conformance with the

contract and ensure information is communicated to

Contractor Superintendent or supervisor.

Monitor fabrication and installation for

conformance to structural drawings.

Provides technical assistance to Construction

Superintendent,General Superintendent, and

Supervisors when requested.

Assists in the preparation of field design changes

and updates drawings for field use as required by

field conditions and regulations.

Provide technical engineering information and

interpretation of plans, detail sheets and

specifications for contractors.

Prepares field purchase requisitions, and procures

PROJECT INCHARGE: construction material.

South Belut Project _ Conoco manpower, schedule and cost data.

Phillips Indonesia. Inc. - Top Side Provides assistance to the contract team in

& Sub Sea Fabrication & administering and coordinating the contract.

Installation. Prepares schedules, reviews claims and engages in

quality tracking.

Prepares reports as required: progress, material,

procurement, status, etc.

Reports costs, progress, activity and other

matters.

Report accurate quantities for labor cost reports,

accurately monitor material ledgers to determine if

quantities remaining in the estimate are sufficient

to complete the project in the field.

Ensure construction work complies with all

engineering standards, codes, specifications and

design instruction.

Establishes and maintains necessary supporting

records and files.

01 June 2011 Until 29 September 2012 Duties & Responsibility:

Monitoring/ Control all activity by Contractor /

Siemens PTE Ltd - Singapore Sub-Contractor as per Project Specification &

Position : Field Engineer - Site Procedure.

Representative. Witness and Review all progress activity as per

Location : Batam - Indonesia Inspection Test Plan (ITP) such as: Material

Verification, fit-up, Dimensional Control

PROJECT INCHARGE: before/After Welding, Visual Welding and witness

Papa Terra Development Project NDT execution.

E-House P-61 - Floatec De Mexico S.A Check and monitoring Structural Fabrication,

installation HVAC Ducting as per Ducting &

Cendor Phase 2 FPSO Project - Instruments Diagram.

Petrofac Malaysia. Review work packs for completeness prior to

documentation package compilation.

Report to Project Manager for Activity and Daily

Report.

03 January 2011 Until 31 May 2011 Duties & Responsibility:

PT. Nippon Steel Batam - Offshore Monitoring and Coordinate all QA/QC section, such

Service as: Welding Structure, Piping Process, E&I

Position : QA / QC Inspector Installation, Documentations and procedure.

Coordinator. Attend daily / weekly progress meeting with Client

Location : Batam - Indonesia and production Area Concerned people for progress

PROJECT INCHARGE: activity.

Total E&P Indonesie South Mahakam Liaise with Third Party Inspectors; Customer and

Field Development Phase 1&2 Project. Certifying Authorities in relation to work scopes.

Report to QA/QC Manager for Activity and Daily

Report.

09 September 2010 Until 09 December Duties & Responsibility:

2010 Monitoring and inspection all activities during new

NUCOASTAL ENERGY PTE.LTD modification Process Installation of Wellhead flow

A Subsidiary of Coastal Energy. Co - line (Upstream & Downstream), Water Injection Line

USA (Hydro Cyclone) Process and make sure all job

Position : QA / QC Inspector- Client installation as standard and specification.

Representative. Checking and Monitoring all activity as per QHSE

Location : Songkhla - Thailand procedure, such as: JRA (Job Risk Assessment) or

offshore - Songkhla platform - A, B, JSA (Job Safety Analist) and Work Permitt.

C Attend daily progress meeting with OIM and

production Area Concerned people for progress

activity and goal the project.

Report to QA/QC Manager for Activity and Daily

Report.

22June 2010 Until 22 August 2010 Duties & Responsibility:

SAPURA ACERGY SBN.BHD Monitoring and inspection all activities during

Location : Bredero Shaw Kabil - pipe laying and pipe coating, make sure the

Batam Tallyman for pipe laying, carried out the jobs as

Position : QA / QC Inspector- Client per standard and specification.

Representative. Coordination with Contactor for any problem matter

PROJECT INCHARGE: and make sure that is problem solved.

Apache Devil Creek Development Report to QA/QC Manager for Activity and Daily

Project. Report.

17 September 2009 Until 20 June 2010 Duties & Responsibility:

Check and Review Specification & ITP as Code &

PRODUCTION TESTER INTERNATIONAL PTE. Standard.

LTD Make line sizing calculation as per P&ID for

Position : Project Engineer process piping.

Location : Batu Ampar - Sending all Construction drawing to 3rd Party for

Batam - Indonesia review and approval.

Check and Review all Constructions Drawing from

PROJECT INCHARGE: engineering Designer before Issued to Production

WELL UNLOADING PACKAGE- CHEVRON for fabrication.

THAILAND Check & Review Mechanical Calculation such as

DESANDING SYSTEM - MURPHY SABAH OIL Pressure Vessels, K.O Drum, Surge Tank, and Water

CO.LTD Degasser from Fabricator before submitted to 3rd

Party Classification.

Make Project Schedule consolidation with Flow chart

organization concerning peoples.

Checking and make request M.T.O as per Construction

Drawing with Standard Specification Material.

Cooperation and coordination with engineering

project team for make minimize mistake job matter.

Prepare for Hydro test package, line checking,

punch list and reinstatement until pre

commissioning.

Handover with owner production Engineer for process

as per P&ID piping process, Instrumentation and

electrical for commissioning assignment.

Make report to Project Manager and client Rep

25 May 2009 Until 10 September 2009 Duties & Responsibility:

VME PROCESS ASIA PACIFIC PTE LTD Directly responsibility to the Construction manager

Position : Production Engineer on Project Preparation, Planning and Work

(Piping & Structural) Scheduling. Maintaining of Engineering, Quality

Location at PT. Utraco Yard Bt. Control, Document, Codes, Plant and specification.

Merah - Batam - Indonesia Authorizing materials take-off for additional work

PROJECT INCHARGE: and / or changes in the work at the site.

JUBILEE FIELD UNIT- FPSO TOP SIDE Establishing field engineering coordinating

PROJECT - TULLOW GHANA LIMITED procedure covering the above responsibility

activities.

Verifying by monitoring / auditing / surveillance

that the site activities relating quality are being

implementation accordance with Quality Plan.

Coordinating engineering matters with the OWNER's

representatives in charge, third party and Sub

contractor and Vendor.

20 December 2008 Until 20 May 2009 Duties & Responsibility:

ASL Marine Pte Limited - Singapore Prepare welders qualification test (WQT) and

Position : QA/QC Structural Welding Welding Procedure qualification test (WPQT) from

Inspector ordinary carbon steel material as per AWS D1.1

Location at PT. ASL Shipyard Tanjung Check & monitoring activity sub-contractor as

Uncang - Batam - Indonesia project assignments.

PROJECT INCHARGE: Liaise with Third Party Inspectors; Customer and

THRUSTER CANISTER BULLY 1 & 2 Certifying Authorities in relation to work scopes.

FRONTIER DRILLING INTERNATIONAL. INC Liaise with Client Quality Representatives.

- USA. Ensure certification complies with BoM (Biil of

Material) and contract requirements.

Make daily report to Project Manager for progress

report.

16 July 2007 Until 30 November 2008 Duties & Responsibility:

PT. EXPRO INDONESIA Directly responsibility to the Project manager on

A Subsidiary of EXPRO GROUP - UK Project Preparation, Planning and Work Scheduling.

Position : Project Engineer Maintaining of Engineering, Quality Control,

Location : Document, Codes, Plant and specification.

PT. Profab Indonesia Batu Ampar Co-ordinate with Surveyor Class/ Plant Operation

Batam team priors to access to Live Plant before and

PT. Heat Exchanger Indonesia - Batu during the process to carry out any Construction

Ampar Batam - Indonesia works.

PT. Tjokro Bersaudara Batu Ampar Prepare Technical Report and Correspondence,

Batam - Indonesia Construction schedule and monthly progress reports

and reporting to Project Manager for Project

PROJECT INCHARGE: progress status.

RUBICON VANTAGE FPSO TOP SIDE Conduct weekly and monthly progress meeting with

PROJECT Contractors, Trade Staff and Surveyor Class and

SEPARATION SYSTEM - BP TANGGUH prepared minute of meeting.

Establishing field engineering coordinating

procedure covering the above responsibility

activities.

Verifying by monitoring / auditing / surveillance

that the site activities relating quality are being

implementation accordance with Quality Plan.

03 April 2007 Until 03 July 2007 Duties & Responsibility:

Global Process System Pte.Ltd Conduct receiving inspection of material and

Singapore evaluation of mill certificate in accordance with

Position : QA/QC Inspector project specification

(Piping & Structure) Review specification, ITP, WPS and Welders

Location at PT. TOJ Sekupang - Qualification Record Involved in any process

Batam - Indonesia Check WPS & PQR at the stage of project

commencement

PROJECT INCHARGE: Check gaps prior to commencement of welding.

MAARI FIELD DEVELOPMENT PROJECT Request applicable NDT after welding complete as

OFFSHORE NEW ZEALAND - TPOT per inspection test plan.

Prepared document such as material heat number

traceability, hardness test report, PWHT's chart,

NDT request.

Reviewed radiography interpreter (RT/UT/MT/PT) sign

report.

Prepare release report to concerning people e.g.:

ABS, Client Representative, etc.

Control the accuracy of all reports produced by

certification section

11 September 2006 Until 31 March Duties & Responsibility:

2007 Responsibility to ensure piping fabrication

PT. Nippon Steel Batam - Offshore activity is carried out as per approved

Service construction drawing, fabrication specification,

Position : QA/QC Piping Inspector and welding procedures.

Witness/verify welder's qualification test.

PROJECT INCHARGE: Perform inspection during fabrication activities as

SISI NUBI PHASE I - Total E & P planned on Inspection and Test Plans, monitoring

Indonesie and reporting on the quality of the installation of

Manifold Well Head Platform piping systems, to include fitting and welding, and

-MWPN Deck - 4 Piles monitor production processes.

-WPN2 Deck - 4 Piles Ensuring all visual inspection is undertaken in a

-MWPS Deck - 8 Piles timely manner. Handling all quality issues with

project management and the Client's representatives

on site.

Prepared document such as material heat number

traceability, hardness test report, PWHT's chart,

NDT request.

10 September 2005 Until 10 September Duties & Responsibility:

2006 Monitoring all quality and progress of project

Compass Energy ltd. Singapore. which is constructed by contractor.

Joint Operation Body Review all document related to QC department, steel

Production Tester International ltd. structure, piping, HVACs, Electrical,

Singapore Instrumentation, Insulation, and Painting.

Gogain Investment ltd. Singapore Advise assist contractor solve any problem

Position : Project Engineer regarding construction activities.

Location : Jaya Asiatic Shipyard Report to Project Manager for daily activity and

Tanjung Uncang. weekly progress report.

PROJECT INCHARGE:

Soraya -Rig Accommodation Facilities

200 Men project.

10 March 2004 Until 08 September Duties & Responsibility:

2005 Assist Project Engineer make Schedule and progress

PT. Expro Indonesia Batam Base - project

Batu Ampar - Batam - Indonesia Make line schedule and than making line check for

Position : Assistant Project hydro test package as per P and ID

Engineer Make drawing such as: piping isometric, pressure

vessel,Water Degasing, K.O Drum & Burner Boom as

PROJECT INCHARGE: per G.A drawing

Pearl Oil Project -Jambi. Sumatra ( Make M.T.O (Material Take Off) as per Drawing and

Production Facilities & Pipe Line) Client Specification, and issued materials to

Cuulong Project -Vietnam ( production.

Separation System ) Report to Project Engineer & Project Manager.

Nangnuan Project - Thailand

(Production Facilities)

Kufpect Project - Seram Island

(Production Facilities)

Medco Tiaka Project - Sulawesi

(Production Facilities)

27 December 2002 UNTIL 31 January Duties & Responsibility:

2004 Conduct receiving inspection of material and

PT. J. Ray Mc Dermott Indonesia, evaluation of mill certificate in accordance with

Batam Fabrication Yard project specification

PT. J. Ray Mc Dermott Indonesia is a Inspect pre-rolling of pipe activities e.g. :

foreign construction and engineering fit-up, quality w / assistance of DC personnel

services company for on shore / off Check gaps prior to commencement of welding

shore oil / gas, jacket & platform Review specification, ITP, WPS and Welders

and heavy weight accessories Qualification Record Involved in any process

industries. Check all parent metals surface to be welded to

Position : Structural / Piping QC avoid misalignment and bad workmanship

Welding Inspector Check all weld profile during fabrication to ensure

all under-fill and undercut remedied

Check application of preheat on each parent metal

as stipulated by the WPS/PQR of AFC Drawing

Check WPS & PQR at the stage of project

commencement

PROJECT INCHARGE: Check NDT Requirement & Request applicable NDT

Dominion Exploration and Production after welding complete as per inspection test plan.

Inc, DEVIL TOWER - MISSISIPPI CANYON

Block 773 (SPARHULL PROJECT) Prepare release report to concerning people e.g. :

RANG DONG FIELD DEVELOPMENT PROJECT Chief Inspector, Client Representative, etc.

- JVPC OFFSHORE VUNG TAU, VIETNAM Prepare punch list and submitted to Fabrication

FPSO - CONOCO BELANAK PROJECT section as per review by Client Representative.

Control the accuracy of all reports produced by

certification section prior to signature.

15 November 2001 Until 15 November Duties & Responsibility:

2002 Checking & monitoring all activity for Ship

Asetanian Marine pte.ltd - Singapore modification as per construction drawing or

Electrical & Instrumentation diagram or schematic

Joint Operation Production Tester drawing.

International (Tricom) Batu-Ampar Check and monitoring Material in coming as per

Position : QA/QC Inspector - Owner Classification Role and make sure all is acceptable

Representative condition.

Reviewed & Witnessed all testing activity such as:

PROJECT INCHARGE: Hydrotesting, Leak testing and Vacum Testing, and

Station Support - V Project make sure all is acceptable as per Classification

Location : ASL Shipyard Tanjung Role & Standart.

Uncang - Batam - Indonesia Report to Project Manager for daily activity

report.

30 June 1998 until 2 November 2001 Duties & Responsibility:

PT. ROTARY ENGINEERING INDONESIA Verifying by monitoring / auditing / surveillance

Batam Fabrication Yard that the site activities relating quality are being

PT. ROTARY ENGINEERING INDONESIA is implementation accordance with Quality Plan

under ROTARY ENGINEERING LIMITED Coordinating engineering matters with the OWNER's

SINGAPORE is a foreign construction representatives in charge, third party and Sub

and engineering services company for contractor and Vendor.

refinery, fabrication & installation Ensuring that the subcontracting documents are in

pipe spools. compliance with the technical requirement for the

Position : Production Engineer. project in aspects of quality and quantity

Ensuring development of complete site office

PROJECT INCHARGE: engineering records and as-built drawing with

Mitshui Bispenol Singapore (MBS1) assistance of the home office engineering group

Project, Toyo Engineering Coordinating hand over procedure effort among all

Corporation. parties concerned, including compilation of

Syngas (Singapore Gasification) documents required for facilities turnover to

project, The M.W. Kellogg OWNER.

SOP (Singapore Olefins) project, The

M.W. Kellogg

SAP (Singapore Acytile Project)

Foster Wheeler

RIF (Refinery Interface Facilities)

project, Foster Wheeler

Maxus Widuri Project, Powell

Electric Co

Mitshui Bispenol Singapore (MBS2)

Project, Toyo Engineering

Corporation.

10 October 1997 Until 22 April 1998 Duties & Responsibility:

Company : Shin Wha Engineering Performing Inspection and controlling that the

Cooperation fabricated project has mach the requirement of

Client : Toyo Engineering specification.

Corporation Coordination with department involved regarding the

Position : Project Engineer job progress date to date basis.

Location : Paiton Steam Power Plant Lease with Client in the Matter of overall Quality

Phase I Paiton - East Java - inspection.

Indonesia Overseeing the compilation of progressed document

and reviewing the isometrics used and issuing for

as built.

Report & responsibility direct to Project Manager.

6 April 1997 Until 25 September 1997 Duties & Responsibility:

Responsibility for the Mechanical Completion

Company : TAKADA - SURYA BESINDO J/O activities for successful completion of the

project.

Client : TORAY ENGINEERING LIMITED Coordinating activities of each discipline staffs

Position : Mechanical Engineer to ensure the progress and maximum targets.

Location : IBP - 2 Project Tangerang Controlling the pre commissioning and commissioning

- Banten - Indonesia as per system definition on time.

Monitoring progress outstanding of punch category

B,C,D to ensure are not delay to handed over of MC.

Report to Project Engineer & Project Manager.

12 October 1996 Until 26 February Duties & Responsibility:

1997 Make drawing such as piping Isometric, piping Plan,

Company : PT. TRUBA JURONG new drawing or modification as revised by field (as

ENGINEERING Built Drawing)

Client : IHI ENGINEERING LIMITED - Check actual material incoming with M.T.O as per

JAPAN Packing list and issued materials matching to

Position : Draftsman Piping fabrication materials demand form.

Location : Pindo Deli II Project Report to Piping Engineer or Project Engineer.

Karawang - West Java - Indonesia

5 August 1995 Until 30 August 1996 Duties & Responsibility:

Company : PT. TERGAYU JAYA Responsibility direct to Project Engineer for

Client : PT ANDAYANI MEGAH - GAJAH progress project.

TUNGGAL INDUSTRIAL ESTATE Check & Monitoring M.T.O as Isometric drawing

before issued to production.

Position : Piping Engineer. Check & Monitoring activity piping fabrication, and

Location : AM III Project Gajah installation pipe spool on site.

Tunggal Tangerang - Banten - Coordination with Client Representative for any

Indonesia problem and any modification as per Client comment

and requested.

Prepare Line check punch list, Hydro testing

package, Reinstatements.

Make Daily Report to Project Engineer & Project

Manager.

[pic]

[pic]



Contact this candidate