Narendra M. Lede
MOBILE- +91-860******* EMAIL-
ab1p44@r.postjobfree.com
[pic]
JOB OBJECTIVE
TO BECOME AN ASSET OF AN ORGANIZATION BY UTILIZING MY EXPERIENCE, SKILL &
ABILITIES THAT OFFERS CONDUCIVE WORK ENVIRONMENT AND PROFESSIONAL GROWTH IN
POWER GENERATION SECTOR.
PROFESSIONAL SYNOPSIS
> CURRENTLY FUNCTIONING AS AN ASST. MANAGER-CPP WITH GOPANI IRON & POWER
(I) PVT. LTD., CHANDRAPUR IN 1 X 15 MW THERMAL CPP.
> NEARABOUT 10 YEARS OF EXPERIENCE IN THE CAPTIVE POWER PLANT AND RELATED
INDUSTRIES PROJECT, OPERATION AND MAINTENANCE ACTIVITIES AND TOTAL 14
YEARS OF INDUSTRIAL EXPERIENCE.
> HAVING AN EXPERIENCE IN PROJECT BASICALLY IN ERECTION AND COMMISSIONING
OF CAPTIVE POWER PLANT INVOLVES BTG AND BOP PACKAGES AS WELL.
> SIGNIFICANT EXPERIENCE IN PLANNING AND SCHEDULING OF EFFECTIVE
PREVENTIVE/ PREDICTIVE MAINTENANCE SCHEDULE FOR CAPTIVE THERMAL POWER
PLANT.
> CONVERSANT WITH HANDLING ALL IBR FORMALITIES REQUIRED FOR ERECTION -
GROUND INSPECTION, WELD SETUP, RADIOGRAPHY, STRESS RELIEVING AND HYDRO
TEST ETC.
> CONVERSANT WITH ISO- 9001 & EMS.
> PROFICIENT IN SPEARHEADING PRODUCTION OPERATIONS AND TAKING COST-SAVING
INITIATIVES TO OPTIMISE EFFICIENCY OF MACHINES AND ENHANCE PRODUCTIVITY.
PROJECTS HANDLLED
> ERECTION AND COMMISSIONING OF 12 THP WHR BOILER, 45 THP AFBC BOILER AT
M/S.GOPANI IRON & POWER (I) PVT. LTD., CHANDRAPUR (M.S.) IN 15 MW CPP
> ERECTION & COMMISSIONING OF 38 THP AFBC BOILER, 8MW STEAM TURBINE, CHP
& AHP, COOLING TOWER, DM PLANT AT M/S.YASH AGRO ENERGY LTD., KOLARI
(M.S.)
> ERECTION & COMMISSIONING OF 45 TPH TRAVELING GRATE BOILER, FHP,AHP &
BOP AT M/S. GAYATRI AGRO INDUSTRIAL POWER LTD., GONDIA OF 8 MW CPP.
ORGANISATIONAL EXPERIENCE
JULY'2009-TILL DATE
GOPANI IRON & POWER (I) PVT. LTD., CHANDRAPUR.- COMPANY ENGAGED IN THE
MANUFACTURING OF THE SPONGE IRON & BILLETS AND IN POWER GENERATION.
ASSISTANT MANAGER-CPP
OPERATIONS PURVIEW:
. WORKED AS A PROJECT ENGINEER IN ERECTION & COMMISSIONING OF 15 MW
POWER PLANT
HAVING COAL AS A FUEL.
. AFTER SUCCESSFUL ERECTION & COMMISSIONING OF PLANT INVOLVED IN
OPERATION AND MAINTENANCE OF FOLLOWING AREAS AS A ASSISTANT MANAGER-
CPP
> 4 NOS. OF LLOYDS MAKE WEST HEAT RECOVERY BOILERS HAVING CAPACITY OF 12
TPH.
> 79 KG/CM PRESSURE & 490 C TEMP CVPL MAKE AFBC BOILER HAVING CAPACITY
OF 45 TPH.
> 79 KG/CM PRESSURE & 490 C TEMPERATURE AND 15 MW QINGDAO JIENENG
(QJPS), CHINA MADE CONDENSING STG WITH SHANDONG JINAN CHINA MAKE
GENERATOR HAVING BRUSHLESS EXCITER AND ROCKWELL AUTOMATION'S DCS,
WOODWARD 505 & BENTLY NEVADA-3500 SYSTEM.
> BALANCE OF PLANT INVOLVED COAL HANDLING PLANT, ASH HANDLING PLANT AND
DM PLANT.
> SUPERVISION OF COAL/ASH SAMPLING AND ANALYSIS.
> RESPONSIBLE FOR SMOOTH OPERATION & UP-GRADATION OF CAPTIVE THERMAL
POWER PLANT.
> PLANNING & SCHEDULING OF MANPOWER DONE EFFECTIVELY.
GENERAL AND SHUTDOWN MAINTENANCE
. GENERAL AND SHUTDOWN MAINTENANCE IN STEAM TURBINES AND AUXILLARIES
SUCH AS CONDENSATE PUMP, OIL PUMP, CW PUMPS, CONDENSERS, ELC & OIL
CENTRIFUSE.
. GENERAL AND ANNUAL SHUTDOWN MAINTENANCE OF BOILERS INCLUDING COIL AND
TUBE CHANGING JOB.
. GENERAL AND SHUTDOWN MAINTENANCE OF ASH HANDLING SYSTEM AND COAL
HANDLING SYSTEM.
NOV'2007-JULY'09
YASH AGRO ENERGY LIMITED, KOLARI DIST. CHANDRAPUR - YASH AGRO ENERGY IS
INVOLVED 8 MW POWER GENERATION BASED ON BIOMASS AND COAL.
SHIFT IN-CHARGE
OPERATIONS PURVIEW:
. WORKED AS A PROJECT ENGINEER IN ERECTION & COMMISSIONING OF 8 MW POWER
PLANT
HAVING COAL & BIOMASS AS A FUEL.
. AFTER SUCCESSFUL ERECTION & COMMISSIONING OF PLANT INVOLVED IN
OPERATION AND MAINTENANCE OF FOLLOWING AREAS AS SHIFT IN-CHARGE.
> 38 TPH, 92 KG/CM AFBC BOILER OF CVPL MAKE
> SIEMENS MAKE CONDENSING WITH EXTRACTION STEAM TURBINE WITH COMPLETELY
SIEMENS MAKES PCS 7 & MASIBUS DCS SYSTEM, WOODWARD 505 E GOVERNOR AND
TDPS BANGLORE MAKE GENERATOR HAVING BRUSHLESS EXCITER,
> ASSOCIATED AUXILIARIES RELATED TO BOILER AND TURBINE,
> CHP, AHP AND COOLING TOWER, ETC.
APRIL'2004-NOV'07
GAYATRI AGRO INDUSTRIAL POWER LTD., GONDIA.- GAYATRI POWER IS INVOLVED 8 MW
POWER GENERATION BASED ON BIOMASS AND COAL.
ENGINEER
OPERATIONS PURVIEW:
. TEAM MEMBER INVOLVED IN THE SUCCESSFUL ERECTION AND COMMISSIONING OF
45 TPH, 45 KG/CM BIO-MASS BASED TRAVELING GRATE BOILER OF M/S
WALCHANDNAGAR IND. LTD. PUNE,
. 45 KG/CM, 480 C MULTISTAGE AND CONDENSING STEAM TURBINE BY M/S
KALUGA TURBINE WORKS, RUSSIA
. 2000 M /HR CAPACITY MIST COOLING TANK BY MIST RESONANCE ENGG. PVT.
LTD., PUNE.
. DAY TO DAY SUPERVISION OF BOILER AND TURBINE OPERATION AND
MAINTENANCE.
JUNE'2001-MAR'04
AURANGABAD MOTOR MANUFACTURERS PVT. LTD., FARIDABAD.- COMPANY INVOLVED IN
THE MANUFACTURING OF REFRIGERATOR SEALED SYSTEM FOR MAJOR OEM COMPANIES
VIZ. WHIRLPOOL OF INDIA LTD., L.G., SAMSUNG, FRIGOGLASS INDIA LTD.
ENGINEER
OPERATIONS PURVIEW:
. MONITORING AND ANALYZING PRODUCTION PROCESS
. CORE MEMBER IN COST OPTIMIZATION ACTIVITIES.
. TO LOOKED AFTER THE ACTIVITIES OF PRE-TREATMENT PROCESS & ETP.
AUG'2000-MAY'01
DIGITRONICS EQUIPMENTS & CONSULTANT ENGINEERS, NAGPUR.
FIRM OPERATING IN REFURBISHMENT & MAINTENANCE OF POWER SUPPLY SUB-STATION
ERECTION & COMMISSIONING UP TO 220KV CLASS, ON SITE. OVERHAULING OF EXTRA
HIGH VOLTAGE (EVH) GRADE POWER TRANSFORMER UP TO 220KV CLASS
Site Engineer
OPERATIONS PURVIEW:
. TO LOOKED AFTER SITE PROJECT WORK OF - ERECTION, TESTING, CHARGING OF
POWER SUPPLY SUB-STATION AND OVERHAULING OF EXTRA HIGH VOLTAGE (EVH)
GRADE POWER TRANSFORMER.
JAN'97 - JUNE'2000
HINDUSTAN COMPOSITES LTD., BHANDARA - HCL (FORMERLY KNOWN AS HINDUSTAN
FERREDO LTD., A JV WITH FERREDO LTD., GRAIT BRITAIN U.K.) IS A PIONEER
COMPANY IN MANUFACTURING OF ASBESTOS BASE AUTOMOTIVE PARTS IN INDIA.
COMPANY ENGAGED IN THE MANUFACTURING OF CLUTCH FACINGS, INDUSTRIAL BRAKE
LINERS, BRAKE DISCS & BRAKE SHOES, ALSO MANUFACTURES THE CHINA CLAY SHEETS
FOR AERO PLANE INDUSTRY.
ENGINEER
OPERATIONS PURVIEW:
. MAINTENANCE OF HAND FIRED BOILER & ASSOCIATED AUXILIARIES
. IMPLEMENTATION OF PREVENTIVE MAINTENANCE SCHEDULE AND BREAKDOWN
MAINTENANCE.
. IMPLEMENTATION OF COST SAVING AND EFFICIENCY IMPROVEMENT TECHNIQUES.
ACHIEVEMENT-
V ACHIEVED COST SAVING OF RS.25000/ANNUM IN PUNCHING OPERATION BY
MODIFYING SHEET PUNCHING TOOL.
V ACHIEVED COST SAVING OF RS.50000/ANNUM IN PRE-MOULDING & MOULDING
PROCESS BY REDUCING INPUT QUANTITY OF MIXED RAW MATERIALS.
ACADEMIC CREDENTIALS
. BACHELOR OF ENGINEERING (PRODUCTION) FROM NAGPUR UNIVERSITY IN 1996 WITH
1ST DIVISION.
. DIPLOMA IN BUSINESS MANAGEMENT FROM NAGPUR UNIVERSITY, 1998.
. BOILER OPERATION ENGINEER (BOILER PROFICIENCY CERTIFICATION)
PERSONAL DETAILS
DATE OF BIRTH : 30 JUNE 1974
PRESENT ADDRESS : QTR NO. A-005, GOPANI IRON & POWER (I) PVT. LTD.,
CHANDRAPUR
PERMANENT ADDRESS : S/O SHRI. MANOHARRAO LEDE, VIVEKANAND COLONY,
GOVINDPUR ROAD, CIVIL LINES, GONDIA - 441 601
(MAHARASHTRA)
LANGUAGES KNOWN : MARATHI, HINDI AND ENGLISH.
MARITAL STATUS : MARRIED
EXPECTED SALARY : NEGOTIABLE
HOBBIES : CHESS, READING NEWSPAPER & MAGAZINES IN POWER PLANT
SECTOR.
DECLARATION: I HEREBY DECLARE THAT THE ABOVE WRITTEN PARTICULARS
ARE TRUE TO
THE BEST OF MY KNOWLEDGE AND BELIEF.
PLACE: CHANDRAPUR, MAHARASHTRA NARENDRA M. LEDE