MOHAMMED JUNADE SIKANDAR Cell No:
Mail ID: ab1fji@r.postjobfree.com
mjunade68@ yahoo.com
[pic]
Job Objective
Junior/Middle management level assignments for Quality Assurance /
Quality Control in Mechanical engineering and Certified Welding Inspection
for piping, equipments, vessels, structures, erection inspection during
Construction phase of Projects in Manufacturing Industries repute in the
Oil & Gas, Power, Refinery, Petrochemical and Chemicals.
Professional Synopsis
Diploma Mechanical Engineer with 07 years of experience in advanced Welding
Inspection technology and international standards/codes used in piping.
Risk Base Inspection in Oil and gas, refinery and petrochemical industries.
Displayed skills in welding inspection and analyzing weld joints by NDT
Tests (RT, MT, PT & VT) through latest measuring instruments and applicable
project standards/codes. Excellent exposure to Welding Procedure
Specifications (WPS), Procedure Qualification Records (PQR) and Welder
Qualification (WQR). An effective communicator with excellent relationship
management, leadership skills and strong analytical, problem solving &
organizational abilities.
Areas of Expertise/Exposure
Quality Control & Assurance
> Ensuring adherence to quality standards (ISO) and maintaining all related
documents.
> Prepare and review of quality related documents like ITP, Method
statements, typical installation details, Calibration records etc.
> Raising Site Discrepancy Report and Non Conformity Reports based on fact
finding audit.
> Implementing latest quality tools and executing process enhancement
projects.
> Identifying areas of quality failures and take steps to rectify the
system.
Welding Technology
> Inspection and checking of welding activities during construction phase
of project to ensure that the same has been carried out as per all
designed applicable standards/codes specifically related to API, and ASME
B 31.3.
> Conducting NDT Tests ( MT & PT) through latest measuring instruments and
applicable project standards/codes in piping, equipment / vessels and
structures.
> Conducting and validating Welders test as per defined WPS and PQR.
Team Management
> Leading & motivating a team of Mechanical Supervisor / Technicians.
> Organizing for technician's internal/external programs based on the
training need analysis to elevate the skills & productivity of employees.
Knowledge preview
> Standards and Codes related to welding: API 1104, ASME Sec VIII, Sec IX,
Sec II, Sec V and other Inspection related codes as per the client
requirements.
> NDT tests: a) Magnetic Particle test, Liquid Penetrant test, Ultrasonic
testing, Radiographic testing.
> Holiday Testing of Pipe lines and Under Ground Plant Piping systems.
> Hydro testing and leak testing of piping/equipment/valves.
> Reading and interpreting isometric drawings, P & ID drawings, Plot plan,
WPS, and PQR.
.
Organizational Details
Since OCT, 2011 to DEC, 2012 with HYUNDAI ENGINEERING CO LTD Abu Dhabi as
QA/QC Welding Inspector for TAKREER GROUP III BASE OIL PRODUCTION
FACILITIES PROJECT,AL RUWAIS.
CLIENT: TECNIP, MOODY Interteck (TPI).
> Joined as QA/QC Welding Inspector in Hyundai engineering co ltd.
Responsible for welding inspection, Fabrication as per defined standards,
procedures and specifications in piping welding works.
> Erection and monitoring of Above ground piping, underground piping,shutdown job,tie-in job, verification of orientation, leveling and
alignment.
> Witnessing and conducting "Welder Qualification Tests" at shop.
> Material inspection as per codes and standards.
> Checking and Inspection of installed system based on check advice
intimation and performing surveillance audit. Reporting any discrepancies
as per defined procedures and to ensure that corrective action has been
carried out.
> Witnessing and conducting "Welder Qualification Tests" at shop and field.
> To conduct regular weld audits against every WPS used in the project
> Prepare weld maps to ensure individual identity for every weld and to
document every stages of welding.
> Preparing and issuing Weekly and Monthly Quality concerned reports.
JAN, 2011 to SEP, 2011 with Oil and Gas construction company LLC (OGASCO)
Abu Dhabi as QA/QC Welding Inspector for 4th NGL TRAIN PROJECT.
CLIENT: PETROFAC / GS JV (GASCO PROJECT)
> Worked as a QA/QC Welding Inspector in Oil and Gas Construction Company.
Responsible for Fabrication as per defined standards, procedures and
specifications in piping welding works.
> Material inspection as per codes and standards.
> Interpretation of radiographic films as per relevant code and client
specification.
> Checking and Inspection of installed system based on check advice
intimation and performing surveillance audit. Reporting any discrepancies
as per defined procedures and to ensure that corrective action has been
carried out.
> Witnessing and conducting "Welder Qualification Tests" at shop and field.
> To conduct regular weld audits against every WPS used in the project
> Prepare weld maps to ensure individual identity for every weld and to
document every stages of welding.
> Preparing and issuing Weekly and Monthly Quality concerned reports.
DEC, 2009 to DEC, 2010 with Oil and Gas construction company LLC(OGASCO)
Abu Dhabi as QA/QC Welding (Welding & Piping).for ASAB FULL FIELD
DEVELOPMENT PROJECT.
CLIENTS: PETROFAC/ADCO
> Witnessing and conducting "Welder Qualification Tests" at shop.
> Review of WPS and PQR.
> Inspection of welding and subsequent tests.
> Erection and monitoring of, piping, verification of orientation,
leveling and alignment.
> Interpretation of radiographs according to client specifications and
applicable acceptance standards.
> Supervision of welding personnel for welding related activities at site
and at shop.
> Survey for vibration in piping and support systems and further preparing
proposal based on analysis.
> Preparing and issuing Weekly and Monthly Quality concerned reports,
Inspection check list, Vendor evaluation report, ITRs, NDT procedures,
Stage wise and final inspection reports.
> Inspection of equipments and piping healthiness during shutdown.
> Preparation of construction punch list for the piping system.
> Preparation of weld inspection summary and updating various inspection
status.
DEC, 2008 TO NOV, 2009 WITH ZENITH MACHINE TOOLS, INDIA as Welding
/Machine shop Supervisor.
CLIENTS: BDK VALVES.
> Witnessing and conducting "Welder Qualification Tests" at shop.
> Inspection of welding and subsequent tests.
> Preparing and issuing Weekly and Monthly Quality concerned reports.
> Supervise welding personnel for welding related activities at site and at
shop.
> Issuance of NCRs and their follow up.
> Witness and preparation of Hydro/ Pneumatic test reports.
> Monitoring of sand blasting and painting.
> Inspection of Heads, Shells, Tube Sheets, Hole/ Grooving, Baffle Plates,
Tube bending and overall dimensions according to their construction codes
and preparation of inspection reports of above mentioned activities.
> Material verification and comparison of Mill Test Certificates as per
relevant codes.
> Review of final dimension and visual inspection.
> Witness of NDT activities and verifying contractors reports.
> Interpretation of radiographs as per client specification and relevant
code.
DEC, 2007 TO DEC, 2008 WITH CADD WORLD, INDIA as project member for CADD
projects.
AUG, 2005 to OCT,2007 WITH METAL CONVERTERS,INDIA as Welding /Machine shop
Supervisor.
CLIENTS: BEST INDUSTRIES.
> Magnetic Particle Testing of welded joints and SHAFT parts for crack
detection.
> Preparing and using weekly and Monthly Quality concerned reports,
Inspection check list, Vendor evaluation report, ITRs, NDT procedures,
Stage wise and final inspection reports.
> Ultrasonic testing and Thickness gauging of welded parts, casting and in-
service equipments.
> DFT and Wet film thickness measurement of painted parts.
> Macro examination of welded joints.
> Destructive testing of specimens for procedure qualification.
> Report preparation and record keeping of RT, MT and PT
> Performing remote visual inspection (RVI).
Major Projects Executed
> Asab full field development Project.
> 4th NGL TRAIN PROJECT, RUWAIS.
> Takreer group III base oil production facilities project.
Certification
1. Certified Welding Inspector (CSWIP 3.1)", Certificate no. 51254 from
The welding Institute
IT Skills
1. MS OFFICE, MS EXCEL,AutoCAD 2008
Education
2005 DIPLOMA IN MECHANICAL ENGINEERING, TSIT, Karnataka, India.
2000 Higher Secondary School Certificate.
Personal Details
Date of Birth : 18th September, 1984
Communication Address Deepthi Residency
in India : H No 202,1st floor R/at 3rd
A main road,
Rathan singh Layout, Kaval
byrasandra,
R T Nagar, Bangalore,
Karnataka, India .
Contact no : +919*********
Passport Details : H 0249956,
Place of Issue - Bangalore,
India.
Nationality : INDIAN