W illard T. Custodio
W illard T. Custodio
Mobile : +639********* (Phils.)
+974******** (Qatar)
#*** ****. ***. ***** *********** Zambales
Phillippines
Email: **********@*****.*** /
*********@*****.***
Objectives
To seek diversity and chance for professional enrichment and to enhance my skills
i n the field of I nstrumentation and Control.
Education
1996 – 1999 Columban College Meralco Foundation Inc. Olongapo City M eralco
Foundation Scholarship program
Industrial Technology Course, Inst rumentation and Process Control
•
•
•
Experience
April 01, 2012 – P resent L ead I nstrument Technician Operations and
M aintenance
SPIE Oil and Gas Services Middle East LLC. N akilat – Keppel Offshore and Ma rine Qatar
Maintenance and operation of Fire and Gas System including CO2/FM200 Fire
Suppression System, Building Automation Environment Management System (BAEMS),
Potable water systems including chlorination systems,on electrical sub stations in the
yard.
Work includes t roubleshooting, rectifying and reporting of system failures.
Performs corrective and preventive maintenance as per SAP.
Monitoring and assigns daily routine maintenance activities to technicians and
assistant technicians for the fire and gas systems, chlorination systems, potable water
systems as per work orders.
January 13, 2010 – M arch 31, 2012 L ead I nstrument Technician I nitial Operations
a nd Maintenance
SPIE Oil and Gas Services Middle East LLC. Ras Laffan Port Expansion Project Qatar
Maintenance and operation of Fire and Gas System including CO2/FM200 Fire
Suppression System, Building Automation Environment Management System (BAEMS),
W illard T. Custodio
3
Potable water systems including chlorination systems, Industrial water systems and foul
water systems in the expanded Port area.
Work includes t roubleshooting of system failures and reporting findings for proper
action by vendor under warranty period.
Commissioning activities includes functional test and cause and effect verification of the
f i re and gas system and CO2 fi re suppression system.
Handles the commissioning and operation of BAEMS (Building Automation
E nvironment Management System), t roubleshoot and rectifies reoccur ring faults in the
system. Ini tiates SCR (software change request) to vendors upon approval of client for
p rogram i tems proven not in accordance to P& ID and process f low diagrams and those
t hat needs improvement and correction.
Monitoring and assigns daily routine maintenance activities to technicians and
assistant technicians for the fire and gas systems, chlorination systems, potable water
systems, industrial water systems, foul water systems and BAEMS as per work orders.
Handles the thermography reporting and data acquisition as part of predictive
maintenance for 11/132kV t ransformers, UPS systems, MCC, and Water chiller systems
p iping and motors.
Assists in the t roubleshooting and commissioning of the HVAC package units and water
chilled units.
June 20, 2009 - July 10, 2009 E & I I nspector
ACE I nstrument Pte. Ltd. N eptune Engineering Upgrading Project
Neptune Explorer
Sembawang Shipyard Singapore
Review/audit of contractor’s drawings, procedures and quality documents.
Willard T. Custodio
4
Onsite inspection of electrical and instruments on fields including cable routing,
p rotection standards, sizing, etc. as per project requirement.
Preparation and completion of check sheets for acceptance and punch list i tems for
contractor rectification.
Coordinates initial testing and inspection with Shipyard QC/QA representative for
acceptance or corrective actions on the field.
Inspection of Topsides electrical, instrumentation, Integrated Control and Safety System (PCS, PSD,
ESD/F&G), Telecom (PAGA) and Navigational aids equipment/systems.
April 08, 2008 - December 20, 2008 F i re and Gas / I nst rument Commissioning
T echnician
Brunel I nternational S.E.A. Pte. Ltd. Conoco Philips of China
Bohai FPSO Project Sembawang Shipyard
Singapore
Cold loop checks of gas detectors, heat sensors, infra-red fire detectors and visual type
cctv fire detectors prior to power – up and simulation.
Simulation and cause and effect function test of gas and fire detectors/instruments prior
to hand over.
Vendor assist on DCS I/O card labeling & configuration based on design specifications
and software configuration.
Commissioning assistance to the vendors during start up, leak testing, simulation,
calibration and fault finding of fi re and gas equipment/instruments.
Fault finding during acceptance period.
Works include documentation of all instruments prior to hand over of loop packages.
Monitor during loop checking of field inst ruments for various facilit ies of the plant.
W illard T. Custodio
5
Involved in the dynamic testing / Cause & Effect matr ix test for Fire and Gas Unit
shutdown and Process shutdown.
Involved in the commissioning of the Gas Turbine Generator skid fi re protection system
i ncluding the CO2 system for the enclosures, gas detection in control buildings and
shutdown and permissive logics .
Assist Operation in start-up utilities facilities. Prepare loop check test sheet for signing
of the client.
Prepare as built drawings and loop drawing.
October 18, 2006 – Ma rch 18, 2008 I nstrument / Process Maintenance
Obeikan Group of Saudi Arabia E lopak Obeikan Automated Packaging Plant
Riyadh Saudi Arabia
Maintenance of production processes which includes condition data t roubleshooting.
Maintenance of various production machineries which includes PET perform injection,
H DPE blow moulding machines and PET stretch blow machines.
Process improvement of complete stretch blow and HDPE blow line which includes
sleeve labeling and wrap around labeling systems.
Parts replacements during model changes and calibration of instruments to ensure a
t rouble free production process.
I nvolve in Engineering activities for the preparation of Instrument job cards and
documents.
Prepare calibration check sheet, commissioning check sheet. Witness the calibration of
I nst ruments during bench calibration.
W illard T. Custodio
6
November 8, 2004 – March 25, 2005 I nst rument Technician
S.R. Ma r ine & General Services Phils. Subic Shipyard I nc.
Documentation of all works done in inst ruments in the field.
Reporting possible instrument failures as a justification for securing of repair permit.
Cable pulling, glanding & termination of signal cables, power and control cables.
Perform continuity check of power, control and signal cables. Perform loop checking and
f unction check of gas detector, smoke detector, manual call point ESD break glass, fusible
p lug loop.
Assist during Fire and Gas logic cause and effect matr ix test.
Prepare approval for construction of Instruments drawings for field fabrication and
i nstallation.
Prepare materials and equipment to be used during construction period.
Prepares installation check sheets, calibration check sheets and as built drawing.
May 20, 2004 – October 10,2004 F i re and Gas / I nst rument Commissioning
T echnician
Total Automation Ltd. Singapore Kellogs Brown and Roots Commissioning
T eam (Halliburton)
Conoco Philips Belanak FPSO Project
Pt. Mc Dermot Ship Repair Facility
Willard T. Custodio
7
Batam Island I ndonesia
Cold loop checks of gas detectors, heat sensors, infra-red fire detectors and visual type
cctv fire detectors prior to power – up and simulation.
Simulation and cause and effect function test of gas and fire detectors/instruments prior
to hand over.
DCS operation for panel view, graphic check, process monitoring from pre-commissioning
and commissioning activities during simulation of various testing equipment.
Vendor assist on DCS I/O card labeling & configuration based on design specifications
and software configuration.
Commissioning assistance to the vendors during start up, leak testing, simulation,
calibration and fault finding of process and fire and gas equipment/instruments.
Fault finding during acceptance period.
Works include documentation of all instruments prior to hand over of loop packages.
Monitor during loop checking of field inst ruments for various facilit ies of the plant.
Trouble shooting input / output faulty cards on PCS and SIS Marshalling cabinet.
I nvolve in the dynamic testing / Cause & Effect matrix test for Fire and Gas Unit
shutdown and Process shutdown.
Assist Operation in start-up utilities facilities. Prepare loop check test sheet for signing
of the client.
February 8, 1999 – May 18,2004 Maintenance Engineer
Koryo Subic, Inc. 1st Process Molding Department
Subic Bay Freeport Zone
Schedules Periodic Maintenance of production machinery.
Assigns and supervises technicians in the maintenance of production machinery.
Designs special machine options of Fanuc injection molding machines, Harmo Robot
a rms, Kawata Dehumidifying dryers an Performs t r ials on new machineries, jigs and dies
t hat will be used in the production f loor.
Willard T. Custodio
8
Calibrates load cells and position decoders of production machineries.
Repairs, t roubleshot and calibrates pressure gauges, vacuum generators, electronic level
i ndicators, t ransducers, bidirectional valves and safety valves of production equipments.
April 1998 – May 1998 H elper Mechanic (Summer H i re under Special Program for
E mployment of Students – SPES)
PWG Transportation Department Subic Bay Freeport Zone
Repairs, t roubleshoot and maintains motor vehicles.
Calibrates engine t imings.
Install and calibrates AVR systems and alarms.
Installs and calibrates oil gauges and temperature sensors.
Repairs and calibrates fuel pumps and oil pumps.
April 1997 – May 1997 F acility Maintenance on the job t rainee
I nternational Properties and Real State Division
Federal Express Corporation Subic Bay F reeport Zone
Hub facility maintenance crew.
Hub electrical t roubleshooting.
HVAC maintenance.
Maintains and calibrates all ground scales.
Troubleshoots motor control of the conveyor system in the hub.
Willard T. Custodio
9
Skills
Computer Li terate (MS WINDOWS).
Electrical/Instrument Systems Troubleshooting.
Industrial Automation.
Industrial Robotics and Application.
Seminars and Training
December 5 & 6, 2010 Cathodic Protection Company LTD.
Cathodic Protection of Reinforced Concrete Training Seminar
Qatar Petroleum/ Consolidated Contractors Company Training Facility
Ras Laffan Port, State of Qatar
May 24, 2010 Hydro Trading and Contracting W.L.L
Kidde F M200 (EDS & ADS) Extinguishing System Design, I nstallation,
O peration & Maintenance T raining
Qatar Petroleum/ Consolidated Contractors Company Training Facility
Ras Laffan Port, State of Qatar
May 23, 2010 Hydro Trading and Contracting W.L.L
Kidde CO2 Extinguishing System Design, I nstallation, Operation &
M aintenance T raining
Qatar Petroleum/ Consolidated Contractors Company Training Facility
Ras Laffan Port, State of Qatar
Willard T. Custodio
10
M ay 17, 2010 Flygt ITT M idlle East
Service & I nstallation of Flygt Pumps & Monitoring Relays
Qatar Petroleum/ Consolidated Contractors Company Training Facility
Ras Laffan Port, State of Qatar
May 4, 2010 Johnson Controls Airconditioning & Refrigeration Inc. Dubai
York YCUL Condensing Unit Operation and Maintenance T raining
Qatar Petroleum/ Consolidated Contractors Company Training Facility
Ras Laffan Port, State of Qatar
July 1, 2010 Autronica Fire & Security (UTC)
Advance T raining Course in Configuration of Autrosafe I nteractive Fi re
D etection System
Qatar Petroleum/ Consolidated Contractors Company Training Facility
Ras Laffan Port, State of Qatar
June 29, 2010 Autronica Fire & Security (UTC)
Basic T raining Course in Operations and Maintenance of Autrosafe I nteractive
F i re Detection System
Qatar Petroleum/ Consolidated Contractors Company Training Facility
Ras Laffan Port, State of Qatar
April 16, 2008 NTUC Learning Hub Singapore
Shipyard Safety I nst ruction Course
NTUC Workplace Safety and Health
Willard T. Custodio
11
J une 24, 2003 Koryo Subic, Inc. Subic Bay Freeport Zone
Pneumatic Control Technology Symposium
Koryo Subic Training and Development Section
August 09, 2002 Bldg.8095, Boton Wharf Subic Bay Freeport Zone
Total Productive Maintenance Workshop
Koryo Subic Human Resources Department
December 12 – 13, 2001 Bldg.8095, Boton Wharf Subic Bay Freeport Zone
Time and Motion Study Workshop
Koryo Subic Human Resources Department
June 28 - 30, 2001 63-C Dar ter Terrace, Kalayaan, Subic Bay Freeport Zone
Team Building Workshop for Supervisory and Managerial Levels
Koryo Subic Human Resources Department
September 7, 2001 Koryo Subic, I nc. Subic Bay F reeport Zone
Selection of Steels for Molding Lecture – Seminar
Koryo Subic T raining and Development Section
January 20 – 21, 2001 Bldg. 8095 Boton Wharf Subic Bay F reeport Zone
Basic Supervisory Development Program
Meralco Foundation, Inc.
June 17 – 18, 1999 Bldg. 8095 Boton Wharf Subic Bay F reeport Zone
Willard T. Custodio
12
Basic Life Support/Basic Fi rst Aid T raining Course
Subic Bay Public Health and Welfare Department
Occupational Health and Safety Division Preventive Health Programs
June 16, 1999 Bldg. 8095 Boton Wharf Subic Bay F reeport Zone
Fi re P revention I ndoctrination T raining
Subic Bay Metropolitan Authority Fire Department
Fire Prevention Division
Personal Data
Bi rthplace: Philippine General Hospital, Manila Philippines
Bi rthdate: 24 September 1978
Status: M ar r ied
Height: 167 cm.
Weight: 70 kgs.
Character Reference
I an Royal
Project Manager
SPIE Oil and Gas Services
e-mail : i **.*****@****.***
Mr. Antonio Rodriguez
Maintenance Coordinator
SPIE Oil and Gas Services
Ras Laffan Port Expansion Project
QP/CCIC Qatar
Email: *******.****@*****.***
H p:+974********
Willard T. Custodio
13
E ngr. Edwin Baybayan
Electrical Commissioning Engineer
Exxon Mobil Russia
e-mail: **********@*****.***.**
Engr. Ruel Baybayan
Technical and eBusiness Manager at AIRUSYS Inc.
Toronto Canada
e-mail: *********@*******.***
Phone: 416-***-****
Willard T. Custodio
14