Post Job Free

Resume

Sign in

Project Manager Engineer

Location:
Jenks, OK, 74033
Posted:
July 09, 2013

Contact this candidate

Resume:

Ransom Blevins

Objective To gain employment in a position where my ability

and experience will benefit my employer's goals as

well as contribute to the success of my career.

Experience 03/01/2008-5/22/13 CCC Group Inc. San Antonio, TX

Project Manager/ Project Engineer

Responsible for overall contract management and

execution from pre-construction to finish.

Provide a single point of contact between CCCG and

the client.

Manage and provide all financial and progress

reporting to CCCG and client.

Compile RFQ packages for competitive bids, execute

and negotiated subcontracts between supplier and

CCCG.

Estimated future projects and compiled detailed

proposals for submittal.

Motivate and manage all support personnel along

with field operations to ensure they are providing

quality work in a safe and productive environment.

7/31/2006-02/28/2008 Dome Technology Idaho Falls,

ID

Assistant Superintendent/Foreman

Managed, motivated and multi-tasked a crew to

ensure constant production.

Assisted in completing long and short term

construction plans and ensured they were executed

precisely.

Provided a single point of contact for the client

during construction in the education and industrial

fields.

7/18/2005-7/28/2006 First OMNI Mortgage

Lending Tulsa, OK

Mortgage Banker

Provided cost analysts based on individual client

facts to provide proper solutions ensuring client

satisfaction

Contacted and coordinated all necessary parties

involved in completing a loan to provide a single

point of contact for the client.

Completed all loan processing documentation from

start to finish.

10/14/2002-7/15/2005 West Corp.

Tulsa, OK

Account Manager

Provided a single point of contact at an executive

level for large business Qwest clients.

Resolved any billing issues and provided detailed

quarterly reviews.

Ordered and coordinated any additions, changes or

moves to our client's service.

7/6/2001-10/1/2002 Phillip Services corp. Sand

Springs, OK

Fabrication/Helper

Installed 2inch - 10inch carbon and high alloy pipe

in oil and gas refineries.

Fabricated and prepped large heat exchangers for

shipment.

Tested out as a high allow pipe welder.

Education Locust Grove High School Locust Grove, OK

Graduated with a high school diploma. In addition

to general high school curriculum, also studied

psychology and sociology.

The University of Texas

Austin, TX

CII Project Management

The University of Clemson

Clemson, SC

NCCER Project Management Academy

Skills All Microsoft Office Programs, Logic Understanding

of Primavera P3/P6 and Microsoft Project. Familiar

with WinEst Estimating platform. AutoCAD LT. Coins

Ti/OA Accounting system.

Personal Profile: Ransom Blevins

Position: Project Manager

Qualifications: MSHA Training Part 48

OSHA Training 10 hour

CCC Group, Inc. Supervisor Safety Training

NCCER Project Management Academy - University of Clemson

CII Project Management Academy - University of Texas

Primary Function: Responsible for the management of the contract and CCCG

operations on the project. Is the primary client contact.

Provides overall project management to ensure project is

constructed in accordance with design, scope, budget and

schedule. Supervises project superintendents and other key

personnel. Is responsible for procurement of subcontracts,

materials, and major construction equipment. Is proficient in

scheduling, coordinating, and supervising project personnel

and their work activities. Ensures onsite personnel comply

with project procedures, safety program requirements and work

rules. Provides technical assistance, i.e. interpretation of

drawings, recommending construction methods, reviews

constructability and equipment requirements as necessary.

Previous Projects:

Fluor/Alcoa Casthouse Structural Steel Repair - Massena, NY

Project Manager

A $6 Million contract for structural steel replacement /

repair. Scope of work included structural, rigging and piping

work. Installed 38 new truss sections with interconnecting

steel and decked the roof. Installed 14 new ventilators, 5 new

heaters and all of the necessary natural gas piping to operate

the heaters. Managed the roofing contractor for the

installation of a new hot and cold built up roofing system.

Fluor/Alcoa Hydroelectric Upgrades - Robbinsville, NC

Project Manager

An $8.3 Million contract for site upgrades and major

modernization project. Scope of work included civil,

structural, mechanical and electrical work lasting 36 months.

Installed all of the internal and external piping systems for

units 1 thru 4. Executed phase I and II Structural/Civil

packages to support the complete demo and rebuild of the

transformer deck, Switchgear Gallery and powerhouse floor.

Removed and replaced the seals on 4 of the 19 gates on the dam

under an Alcoa Contract and will be continuing the remodel of

the remaining 15 gates under the new owners.

Alcoa- Maryville, TN 2010-2011

Project Manager

A $4 million fire damage project that destroyed much of the

truss chords and roofing system. Later that year Alcoa again

sustained heavy wind damage to the same building over the

rolling mills totaling $5 million contract. Work included

repairs and reinstallation of the 96" and 120" rolling mill.

Also, on various small projects and outages that have included

rebuilds of the baking furnaces, casting pit foundations and

equipment, installation of a new fume exhaust system for the

96" mill, work on the annealing furnaces as well as the ingot

pad and runway.

Gerdau Ameristeel - Knoxville, TN

Project Manager

Billet crane and facility equipment overhaul / maintenance

work. Mezzanine Furnace floor demo and replacement.

Keystone Cement - Bath, PA

Project Engineer

$86 million contract for cement plant modernization. Scope of

work included civil, structural, electrical & instrumentation

and mechanical, to construct new cement pyro processing line.

CCCG managed and controlled the master schedule and all work

activities as directed by Keystone Cement. Project included

Raw Mill, Five Stage Dry Process Preheater and Pre-Calciner,

Spline Drive Kiln, Clinker Cooler, Clinker Transport and

Cement Transport, Finish Mill, and Blending Silo. In

addition, CCCG was responsible for overseeing the

owner-selected civil and refractory contractors. The plant

was built to produce 3000 ST/PD.

Graymont, Inc. - Pleasant Gap, PA

Project Engineer

$5.8 Million contract for lime plant major expansion. CCCG

erected a 480' long kiln. This is the longest lime kiln

without a pre-heater that has been erected in North America

since 1975. In addition to the kiln, CCCG erected a Solios

dry scrubber and an 8 compartment baghouse that includes a

reactor, recycle lime bin and hydrated lime bin. Ancillary

systems included a burner building, a tubular stone feed

conveyor system roughly 200' long, two emergency feed

conveyors, a cooler, coal bin, coal mill and coal drag

conveyors.

The kiln is 14.5' diameter and was assembled from 19 sections,

all of which were sub arc welded. We performed pre-assembly of

"can sections" in a lay-down / staging area and transported

sections weighing roughly 180,000 lbs. each to their final

erection point.

Prior to Joining CCC Group, Ransom worked on projects that

also contributed to refining his expertise.

Dome Technology - Idaho Falls, ID

Assistant Superintendent/Foreman

Managed, motivated and multi-task crews to ensure constant

production. Assisted in completing long and short term

construction plans and ensured they were executed correctly in

the education and industrial fields.

Phillip Services Corp. - Sand Springs, OK

Pipe Fitter / Welder

Installed 2" to 10" carbon and high alloy pipe in oil and gas

refineries. Tested out as a high alloy pipe welder.



Contact this candidate