Post Job Free
Sign in

Engineer Mechanical Engineering

Location:
Dimapur, NL, 797103, India
Posted:
July 06, 2013

Contact this candidate

Resume:

Curriculum Vitae for Keviletuo Khate

P.O. Box: 586, Doha Qatar

Tel: +974-********

*********@*****.***

Date of birth : 17 February 1984

Personal

Nationality : Indian

Details:

Sex : Male

Age :29

Permanent Address : North Town School Colony

House No 15

Chumukedima, Nagaland

India

Reference:

Danny Alvarez

Well Intervention Engineer Occidental Petroleum of Qatar

E mail: *************@***.***

Phone Number: +974********

Bachelor in Mechanical Engineering B.E 2008

Education:

The National Institute of Engineering Mysore,VTU India

Self motivated with over 2+ years in an Oil and Gas industry professional environment. Team oriented with

Summary:

excellent leadership, communication, organizational, multi tasking, time management, and problem solving

skills. Energetic, flexible individual with ability to work in fast pace and challenging environments.

Performance oriented and results driven professional having expertise in Coil Tubing Engineering backed by

a B.E in Mechanical Engineering from National Institute of Engineering, Mysore. Experience of having

worked extensively using 1.50”, 2.00”, 2.375” and 2.875” Coil Tubes. Sound knowledge of 240, 480, 580 and

5100 Hydra Rig Injector Head. Understand BHA design configurations and operating procedures, safety and

loss prevention standards and coiled tubing contingency planning. Good exposure to operation and

maintenance of coiled tubing units, well control equipment, nitrogen pump and stimulation pump units.

Exhibit a systematic approach while being open to challenges. Enjoy working independently or as a team

member.

• Project Management • Operations Management

Areas of

• Coiled Tubing • Logistics & Administration

Expertise:

• Acid Stimulation • Personnel Management

• Nitrogen Lifting • Risk Assessment

• Evaluate coil tubing life by analyzing • Managed pre job simulation for coil tubing using

corrosion and fatigue life using CTES CTES.

Responsibilities • Responsible for planning, implementing and monitoring operational activities in the organization.

• Effectively handled personnel and equipment. Ensured efficient client service, Successful in exceeding /

meeting budget, revenue and profit margins.

• Conducted office engineering evaluations of upcoming projects.

• Evaluated coil tubing life by analyzing corrosion and fatigue life using CTES.

• Instrumental in preparing Hydra Rig Units for different types of works. Managed QA/QC functions.

• Judiciously prepared pre job, post job reports for all Coil Tubing activities and present to clients.

• Actively participate in preparation and stimulation of nitrogen and coil tubing units.

• Managed pre job simulation for coil tubing using CTES.

• Collaboratively worked in Dukhan Oil Field, Qatar Petroleum using advanced technology in coil tubing.

• Handled rig up and rig down operations of Coil Tubing Equipment such as fluid pumping and nitrogen

gas pumping.

Page 1 of 4

Professional Coil Tubing Engineer National Petroleum Services, Qatar

Experience: Join date Oct’2010 Present

Sound Knowledge of BOP’s

Blowout

Preventer Quad BOP( 3 1/16”, 4 1/16”)

Combi BOP (4 1/16”, 5 1/8”)

Annular BOP (7 1/16”)

Shear Seal BOP ( 7/16”)

Sound Knowledge of Stuffing Box

Stuffing Box

Over under Stuffing Box ( 3 1/16”,4 1/16”)

Side Door Stuffing Box ( 4 1/16”)

• Production Logging with Electric Line cable through CT [OPQL, MOQ, QP]

Production

Logging with 1.50”, 2.00”, 2.38” CT in Cased/ Open hole, SLB, conventional and pressure deploying PLT tools.

Logging

• Design jobs with CT Tractors for Extended Reach 2.00”, 2.38” & 2 7/8” CT [RasGas]

Extended

Simulate with both Welltec (based on flowrates) and Western Well Tools(based on backpressures) Tractors for

Reach

extended reach

• Design a job specific tapered 2 7/8”CT for a horizontal well [RasGasG]

2 7/8”CT (14,000’ long with 6 tapers) was opted to reduce pumping time. In the event that it couldn’t reach TD

a CT tractor was worked on as a contingency.

• Stimulating Multi lateral wells with lateral re entry tools [OPQL]

Stimulation

Multi lateral wells with up to 4 laterals, stimulating up to 3 laterals in a single run, without resurfacing

• Stimulating through CT [OPQL, MOQ, RG, Shell, QG3&4, QP]

Running into Dual completion wells, stimulate each individual string

• N2 Lifting [Maersk, Qatar Petroleum]

• Perforating with CT [OPQL]

Perforating SLB Perforating guns were run with 2.38”CT with Electric line cable, depth of 12,000’

• Sand Cleanout using CT [OPQL, QG3&4]

Sand Cleanout

Sand and other sediments brought back to surface by circulating with fluids or by Venturi Junk Baskets

• Coiled Tubing Drilling [RasGas, QG3&4]

CT Drilling/

Drilling with CT through drillpipe to establish recirculation thereby freeing stuck drill pipe

Milling/ Fishing

• Milling [RG, OPQL, QG3&4]

Various milling runs with reamers, burning shoes, milling bits to clear blocked tubing

• Fishing in Cased/ Open Hole [OPQL]

• Fishing for cable in Cased hole [OPQL]

Page 2 of 4

• Drill Stem Test (DST) Operations on Gas wells [RG, QP, Wintershall,Shell]

DST Extensive work with 1.5” CT in gas wells up to 4,200psi., spotting of acid across perforations before major acid

job, running samplers to collect live gas samples, lift well with N2, work closely with client to work out the site

layout, coordinate equipment and personnel movement, schedule maintenance work on a timely basis as DSTs

last up to 90days. Identified and improved operations by reducing rig up time by 45%

• Setting Bridge Plugs through Coil Tubing[RG, OPQL]

Well • Setting Cement plugs through Coil Tubing[RG, OPQL, QP]

Abandonment

• Electrical Submersible Pump ( ESP) Installation and Fishing

Other Projects

2.375” CT was used for fishing ESP and install back ESP in Al Morjan Platform (OPQL)

• Shifting Down hole Sleeves with CT [MOQ]

• Stimulate and N2 Lift a High Pressure Gas Well with CT [Shell,Wintershall]

2.00” CT was used to stimulate an 18,000’ gas well with a CITHP of 4,200psi. and then use N2 to lift fluids

Challenges RIH to TD with snubbing forces of 15,000lbs.; well flowed back @ 110mscf/day on

surface while lifting fluids with CT in hole.

• Cement plug through CT, CT Milling [RasGas]

A leak was detected in the production tubing of a North Field gas well. A Composite Bridge plug was set with

wireline beneath the leak, CT was used to set a cement plug over the bridge plug to positively secure the well.

Once the completion tubing was replaced, CT was used to mill out the cement and bridge plug to get the well

back to production

• PLT job with 2.38” CT [MOQ]

Challenges: 2.38”CT required getting deeper into well, Rig crane unable to lift weight of WR with required CT

length

CT was mobilized separately, on a Work Reel and with a metal spool (to be used with Spooling Foundation).

After spotting the equipments the CT string was welded together on location, and then spooled over completely

to the Work reel on the main deck after NDT and pressure testing. The cable was injected offshore as well.

• Liftboat Operations [OPQL]

The Kikuyu Barge has a semi permanent Coiled tubing unit installed for a six week campaign. The barge runs

2.00” and 2.38” conventional and E line coiled tubing strings. Responsible for designs, loadout, tech support,

evaluation and invoicing.

All jobs were simulated using Orpheus and Hydra modules of Cerberus. Advanced coiled tubing

Cerberus simulations were carried out for running into high pressure/ live wells. Different cases ran for

simulating worst cases collapse/ burst. Tapered string designs completely modeled on Cerberus

[Coil Tubing string designer.

Modeling

Software]

Page 3 of 4

• •

Clients Worked Ras Gas (Exxon Mobil) Shell Qatar

• •

For: Maersk Oil Qatar Qatar Gas

• •

Occidental Petroleum of Qatar [OPQL] Wintershall

• •

Qatar Petroleum Development [QPD] Qatar Petroleum

• • Safety Leadership Training

Training: Cerberus CT modeling Software

Qatar Enterprise Development Network (EDN)

Qatar

• • Basic Cementing Course

International Well Control (IWCF)

Level2 UAE

Qatar

Permit to Work

Trained as Worksite Supervisor Level 1

for Qatar Petroleum (QP)

Page 4 of 4



Contact this candidate