Post Job Free
Sign in

Project Customer Service

Location:
Evergreen Park, IL
Posted:
July 05, 2013

Contact this candidate

Resume:

PHILIP BULATEK

*** ********** **** ******* ****, IL 60014 815-***-**** ab0h3a@r.postjobfree.com

CAREER TARGET: FINANCE, ENTRY-LEVEL

Earned B.S. degree in Finance and Management, gaining strong knowledge base

in accounting, investments, and other financial disciplines. Demonstrated ability

to conduct detailed analysis, identify problem areas, and implement corrective

solutions. Extremely high level of attention to detail.

Overview:

Diverse experience includes team leadership, project management, technical troubleshooting, and

customer service skills. Able to perform comprehensive financial analyses and draw conclusions

based on findings. Built effective relationships with employees, clients, and vendors. Generated cost

savings for employers through implementing improvements. Computer background includes:

Microsoft Office, including Excel and PowerPoint; Quicken; and Financial Software for Home.

Selected knowledge/skill areas:

Financial Reporting Systems Financial Forecasting & Financial Statement

Modeling Analysis

Product Costing & Profit

Visibility Bond Valuation Processes Adjustments in Journal

Entries

Cash Flow / Budget Return-on-Equity Evaluations

Management Sarbanes-Oxley

Regulations

EDUCATION & CREDENTIALS

Bachelor of Science, 3.3 gpa out of 4, Finance and Management, 2012: COLUMBIA COLLEGE

OF MISSOURI

Courses:

Finance: Accounting, Fundamentals of Investing, Business Finance, Comprehensive Financial

Planning

Other: International Business, Marketing, Business Law, Information Systems, Statistics, Business

Ethics

Projects:

Strategic Management/Capstone Class – Completed online simulation for full P&L management of

a company entitled “Glo-Bus” (competition included other colleges). Managed all the financial

aspects of the company with 2 other team members. Results: Group received “A” grade on the

project and tied for 1st Place in the world on the simulation, earning invite to play simulation again

as well as an invitation to a Meet and Greet at the college with the server for the game.

Fundamentals of Investments Class – Served as Team Lead for group of 3 on project involving

analysis of 2 publicly traded companies. Performed in-depth company analysis (including vertical

and horizontal analysis) using EBITDA, operating profitability, financial rations, and other criteria.

Compared and contrasted companies’ profitability vs. stocks, forecasting earnings to determining

validity of stock purchase. Results: Determined less risk, less return on one of the Fortune 50

companies and higher risk, higher return on the other. Group received “A” grade on the project.

PROFESSIONAL EXPERIENCE

TRUE VALUE MANUFACTURING – Cary, IL – 2011-Present

PHILIP BULATEK, 2-815-***-**** ab0h3a@r.postjobfree.com

Project Coordinator / Electrician

Initially hired as Maintenance Electrician and earned additional Project Coordinator role. Prioritize

requests for projects from managers and employees. Contact vendors to secure prices for items

needed on projects; build relations with new vendors and maintains relations with current vendors;

analyze prices from several vendors, select the best deals, and present to management for approval

for purchases. Cost savings by sorcing pricing from multiple vendors within our vendor network; cost

savings through building new vendors. Planning projects for timely completion and within budget as

directed.

Saved the company on labor costs by improving efficiency on up to 40 photo-eyes across 4

production lines through updates and repairs, expediting product turnover times.

Replaced DC with AC system that generated cost savings in terms of material cost of motor

(AC system cost 25% of the total cost of the DC motor) and total energy consumption savings.

Set up proof for insurance company and created spreadsheets for equipment to determine

areas for repair.

BERRY PLASTICS – Woodstock, IL – 2008-2011

Maintenance Electrician / Mechanic

Worked closely with multiple contractors to implement new business within the facility’s production

lines. Installed new equipment, improved areas of the building, performed routine preventive

maintenance, and completed troubleshooting/ repairs on various equipment that included injection

molding machines, auxiliary equipment, building automation systems, and automation equipment.

Worked on production floor within a food safe environment adhering to Good Manufacturing Practices

(GMPs), ISO 9001 guidelines, and lean manufacturing principles.

Improved production rates and efficiency by collaborating with workers and management on

strategies, as well as interacting with manufacturers to recommend change in part production

process.

Developed procedure for piece of equipment on technique for changing it from one set-up

to another, including information in a binder per request of management, that eliminated

confusion and prevented costly production.

Worked closely with vendors to improve upon JD Edwards system and vendor-managed

inventory system.

MCHENRY COUNTY / INTERNATIONAL BROTHERHOOD OF ELECTRICAL WORKERS – Crystal Lake, IL –

2004-2008

Building Construction & New Electrician Apprentice

Installed major appliances according to specifications and technical manuals. Tested voltage and

resistance using voltmeters and ohmmeters to ensure safety upon job completion. Installed EMT,

RMC, IMC, PVC, and conduits. Pulled various size wires in raceways, laid out and installed electrical

cabinets, troubleshot problematic circuits, installed various devices and fixture types, and managed

commercial/housing repair and maintenance tasks.

Worked effectively with a team of up to 15 electricians on various projects throughout

McHenry County, including work on 2-3 different job sites at once. Maintained excellent

punctuality, organization, and efficiency in task completion.

Utilized communications skills in meeting project goals, including completing schedules,

ensuring proper staffing per project, and maintaining adherence to project milestones.

SCHAFER BUILDERS – Crystal Lake, IL – 2001-2004

PHILIP BULATEK, 3-815-***-**** ab0h3a@r.postjobfree.com

Project Team Member / Electrician

Completed projects that included custom second story additions, room additions, total rehabs,

commercial remodeling, maintenance, repair, and service initiatives. Interacted one-on-one with

customers to address and resolve issues as needed. Defined project scope, reviewed

architectural/engineering plans, and completed project tasks in a professional manner.

Created inventory system for parts with a price list that was kept in vehicle while on

project sites, resulting in the ability to bill and have parts on hand to increase time/cost savings

on avoiding travel.

Ensured 100% customer satisfaction by resolving issues and providing exemplary service.

Wrote up change orders at customers’ houses and communicated with sales representatives to

ensure understanding of customers’ needs.

LANGBOW, INC. – Cary, IL – 1999-2001

Machine Builder / Field Technician

Built custom tube bending machines in-house from the ground up, including panel boards,

mechanical components, pneumatic systems, and hydraulic systems. Interacted with customers one-

on-one in the field & phone, to perform repairs.

Managed numerous tasks and implemented decisions without direct supervision, gaining

reputation for effective time management skills. Traveled nationwide and to Canada to

troubleshoot on customer sites, establishing and maintaining high level of customer satisfaction

through personalized service.

MCKESSON HBOC – Carol Stream, IL – 1998-1999

Inventory Control Clerk

Hired as temporary employee and earned promotion to full-time status. Improved inventory accuracy

by contributing to change from manual to barcode scanner process. Evaluated reports side by side to

ensure accuracy in counts. Daily job functions include 10 key data entry, cycle counts, and product

location inquiries.



Contact this candidate