SHANE WEBSTER
**** *. ******** *******, ** ● Cell 509-***-**** ● ab0ge8@r.postjobfree.com
SUMMARY OF QUALIFICATIONS
Seasoned operator of heavy commercial and farm equipment; and commercial/residential pipe layer and
installer
CURRENT WORK HISTORY
11-2010 to 06–2012 M&M Earthworks Portland, OR
Heavy Equipment Operator
Responsible for the operation and day to day maintenance of excavators, loaders, off road
haul trucks, dozers, skid steers and bobcats
Determined with use of blueprints and input from supervisor the final layout of pipelines,
including grade calculations and avoidance of conflicting utilities
Primary job types included, grading parking lots, roadways and loading ramps working in
a variety of terrains
06-2006 to 08-2008 Swaggert Brothers Hermiston, OR
Heavy Equipment Operator
Responsible for the operation and day to day maintenance of excavators, loaders, off road
haul trucks, dozers, skid steers and bobcats
Determined with use of blueprints and input from supervisor the final layout of pipelines,
including grade calculations and avoidance of conflicting utilities
Primary job types included, grading parking lots, roadways and loading ramps working in
a variety of terrains
05-2003 to 06-2006 MaHaffey Enterprises Kennewick, WA
Head Pipe-Layer
Primary responsibilities included shooting grades from surveyed hubs, setting up line
instruments in order to establish correct line for pipe laser setup, installing for both
residential and commercial - water systems, sewer lines and storm drains
Heavy Equipment Operator
Heavy equipment operation of excavator, loader, off road haul truck for the purpose of
backfilling and dirt moving
1998 to 1999 IMCO General Construction, Inc. Bellingham, WA
Pipe fitter
Worked on construction of the Dayton WA sewer treatment plant. Responsibilities
included laying the water main and sewer lines
1997 to 1998 McClure and Sons, Inc. Bothell, WA
Pipe fitter
Worked on construction of the Walla Walla WA water treatment plant. Responsibilities
included installation of stainless steel pipe, anchoring ladders and weir plates to concrete
walls and baffle placement in the contactor
1992 to 1995 Nekich Construction Spokane, WA
Head Pipe layer
Responsibilities included shooting grades from surveyed hubs, setting up line instruments
in order to establish correct line for pipe laser setup, installing for both residential and
commercial - water systems, sewer lines and storm drains
1987 to 1992 Mt. Crest Enterprises Spokane, WA
Pipe layer
Responsibilities included shooting grades from surveyed hubs, setting up line instruments
in order to establish correct line for pipe laser setup, installing for both residential and
commercial - water systems, sewer lines and storm drains