P.O Box 682

Benson, AZ 85602

520-***-****

************@*****.***

Qualifications QualificationsQualificationsQualificationsQualifications

Licensed HVAC contractor in the state of Arizona since 2001. Responsible for all of my own

Estimating, project management and supervisory tasks. Completely well versed in the dry, wet

And DX sides of the HVAC industry. Proficient in job costing, procurement, quality control, layout,

Estimating, material takeoffs, design, business development.

Started in the mechanical trade as a pipe fitter for Oklahoma Refining Corporation, Cyril

Oklahoma in 1985.

Relevant ExperienceRelevant Experience Relevant ExperienceRelevant Experience Relevant ExperienceRelevant ExperienceRelevant ExperienceRelevant Experience Relevant ExperienceRelevant Experience Relevant ExperienceRelevant Experience

Midstate Mechanical Southern AZ Division 2011 – 2012

Field Operations Manager

Manage and direct the day to day functions and operations of piping, sheetmetal, plumbing and warehouse.

Scheduled with service department for project startups.

Identify, develop and manage pre- project staffing, equipment, material needs, scheduling and priorities.

Coordinate with the internal staff, department and others on projects, client needs, pre-planning and on – going issues.

Review all projects, project status, cost incurred and related project – specific timelines, budgets, cost and

expenditures.

Develops, presents, justifies and monitors overall operations division and specific departmental budgets.

Represent the company to outside vendors, contractors, clients and others

San Pedro Mechanical, 2004- 2011

Owner, Estimator, Project Manager

Full time in charge of entire operations of the company. Performed work on numerous military

And private contracts including multiple contracts at FtHuachuca AZ. Projects included the installation

Of chillers, boilers, cooling towers, air handlers, CRAC units, chilled water, heating water, refrigeration,

Package units, exhaust systems, direct digital controls, duct work, piping, vav boxes.

The following is a partial list of projects that we have completed.

Army Corps Of Engineers, Ft Huachuca AZ - HVAC Renovations Bldgs 41407 & 41408

This project dealt with design and installation of Mitsubishi’s City Multi System. Teamed with

KC Mechanical Engineering from Tucson AZ for the design.

Army Corps Of Engineers, Ft Huachuca AZ - New Unmanned Aerial Vehicle Facility

Project entailed the installation of chilled water and DX applications to four new buildings.

Directorate Of Public Works, Ft Huachuca AZ - New Dining Hall at the Unmanned Aerial Vehicle Facility.

Design and installation of DX package units, teamed with KC Mechanical Engineering for the design.

Directorate Of Public Works, Ft Huachuca AZ - Install New Underground Of New Chilled And Heating Water Piping

For The Intel School. Installation of 8,200’ lf of piping along with direct digital controls and four chilled pumps

And four heating water pumps.

Directorate Of Public Works, Ft Huachuca AZ - Installation Of New 600 Ton Cooling Tower Greely Hall.

Performed demolition of existing tower, design of new frame works for new tower, installation of new

Tower as well as ten and eight inch piping. Utilized a 240 ton crane to set new tower.

City Of Sierra Vista, AZ - New 17,000 Square Feet Fire Station - Installation of heating water system with

Gas fired boiler, DX packaged air handler with vav boxes and direct digital controls.

Tucson Federal Court House - Tenant Improvements - Remodeling of five floors including completely new

Chilled water piping,constant volume duct system and direct digital controls.

Centennial Contractors, Inc, 1999 – 2004

Estimator / Project Manager, Ft Huachuca AZ

Responsible for all plumbing, mechanical and fire protection estimating and project management for the

Job Order Contract (JOC). Estimated all projects via Pulsar program, administer all subcontracts, performed

Job costing, quality control. 80% of the projects performed were design build based.

The following is a partial list of projects that I completed with Centennial Contractors, Inc

Directorate Of Public Works, Ft Huachuca AZ - Installation Of New Sewer Lift Station. Installed new lift station

Along with 5,100 lf of new sewer piping.

City Of Marana, Marana AZ - installation Of New Sewer Piping. Installation of 9,500 lf of new sewer piping

Through the city of Marana.

Directorate Of Public Works, Ft Huachuca AZ - HVAC Renovation Of Barnes Field House. Installation of new

Relief air ductwork along with 16 industrial grade evaporative coolers. Including all electrical and water supply

To support new equipment.

Directorate Of Public Works, Ft Huachuca AZ - HVAC Renovation To Bldg 80811. Design and installation of

New multiple DX split systems along with new ductwork and lighting. Also new installation of direct digital controls.

Sun Mechanical Contracting, Inc 1996 - 1999

Project Foreman

Sheet metal project foreman responsible for crew placement, take offs, layout, general contractor relations and

Quality control.

The following is a partial list of projects that I was involved with.

General Services Administration, New Federal Court House, Tucson AZ - Was one of five sheet metal foreman’s who

Worked under a general superintendent. Responsible for a crew of nine employees covering the mechanical rooms

In the basement, first floor, third floor, fifth floor and roof. Performed all lay out coordination, material take offs and

Quality control. Received structural welding certification.

Army Corps Of Engineers, Ft Huachuca AZ - New Barracks . Was project foreman for the sheet metal work. Installed

350 chilled and heating water fan coils along with twenty exhaust fan systems. Work also included the installation

Supply, return and outside air ductwork. Project also included a new laundry facility which included a new constant air volume duct system.

Education

Casper College, Casper WY 1982 - 1984

Major; Petroleum Technology

Certified In Honeywell’s Light Commercial Building Systems (DDC) 2008

Certified By Mitsubishi For Installation, Start Up And Commissioning Of Their City Multi System 2010

Excellent References Upon Request