Post Job Free

Turbine resumes in San Mateo, CA

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 81 - 90 of 148

Project Mechanical Engineer

San Francisco, CA
... Micro Electromechanical System (MEMS) Computational Fluid Dynamics Micro/Nano Fluid Mechanics Financial Engineering Gas Turbine Lean Production System Stress Analysis Project Management Vibration RESEARCH WORK & PROJECT Graduate Research Project ... - 2015 Jun 19

Engineer Manager

San Francisco, CA
... Manufacturing Engineer (02/1992 to 02/1994) General Motors, Allison Gas Turbine – Indianapolis, IN Reduced scrap by 25% and cycle time by 4 hours on the compressor vane manufacturing process. Reduced labor time by 30 minutes per component by re ... - 2015 Jun 17

Engineer Engineering

San Francisco, CA
... 2011- May 2012 Increased runtime from ~35% reliability to ~70% of air separation facility powered by Aero-derivative gas turbine coupled to power train and product compressors by implementing solutions: oCold box casing purge modification to ensure ... - 2015 Jun 11

Power Plant Maintenance

San Francisco, CA
... Mechanic Assembler: May 2015 – May 2015 Mounted of (LM6000, LM2500, LMS100 AND LM5000 TURBINE ENGINES.) Assemble/Disassemble and test support of gas turbine engines/packaging in accordance with the appropriate technical specifications and standard ... - 2015 Jun 08

Engineer Sales

San Francisco, CA
... • Through computer programming on the cyber mainframe, optimized turbine blade “stag” matching resulting in a 23 hr cycle time reduction per week for an overall improvement in manufacturing efficiency. •Reduced scrap and rework rates by 50 % by ... - 2015 Jun 03

Power Plant Quality Control

San Francisco, CA
... RRI Energy January 2010 -May 2010 New Florence, PA Quality Assurance Inspector (Contract) o Worked as a quality assurance inspector on a Boiler/Turbine outage at Conemaugh power plant. o Responsibilities included structural steel, piping, boiler ... - 2015 Jun 03

Project Manager

San Francisco, CA
... – Scheduling: • Develop completion schedule (at site) for New Martinsville Hydro Project (2 Units – Bulb Turbine); • Develop Bechtel / subcontractor interface schedules for the Ankara Motorway Project (Turkey). Seconded to Parsons/Brinkerhoff in ... - 2015 May 26

Engineer Engineering

San Francisco, CA
... Differential Equations, Engineering Design II and Energy resources & technology • Designed and constructed a Wind turbine Secondary School Diploma, Jalandhar, India 2006 – 2010 Delhi Public School VOLUNTEER EXPERIENCE Team Member, Guelph, ON ... - 2015 May 12

Service Engineer

San Francisco, CA
... Service Blade Repair _ July 2012 to Oct 2012 Gamesa Wind & Turbine (p) Ltd (Global) - Tamilnadu . Site Service Junior Engineer _ Nov 2012 to Present Gamesa Wind & Turbine (p) Ltd (Global) _ Maharashtra ( AE5x _ MADE TECHNOLOGY) EDUCATION Sri Krishna ... - 2015 Apr 24

High School Operator

San Mateo, CA
... Designation : Machnical TURBINE OPERATOR PERSONAL DETAILS : Name : GURDEEP Father’s Name : Mr. Devidass sharma DOB : 25 Oct,1994 Place: SAMBHAL Nationality : Indian Sex : Male Language Known : Hindi,English Maritial Status : Unmarried Declaration : ... - 2015 Apr 05
Previous 6 7 8 9 10 11 12 Next