| Distance: |
Resume alert |
Resumes 71 - 80 of 153 |
Mesa, AZ
... Machinist / General Electric Industrial & Power Systems Schenectady, NY 1993-1995 Set up and operated a Cincinnati tracer machine for the fabrication of the Turbine Blades for Aerospace and Power Generation. Operated a variety of manual and ...
- 2016 May 06
Scottsdale, AZ
... Early experience was gained with the General Electric Company as Manager of Steam Turbine applications; Also served as a Senior Engineer in the Industrial Turbine Division and as a Senior Engineer in the Nuclear Energy Division. Summaries of Typical ...
- 2016 Mar 15
Phoenix, AZ
... Technical aspects like Turbine and blade selection, selection of land, risks, and optimization calculations were carried out successfully to obtain minimum cost of electricity (3.7 cents/KWh) with maximum revenue generation. Design and Fabrication ...
- 2016 Mar 13
Mesa, AZ
... SKILLS Project management and Leadership: Organized, scheduled test plans and completed along with a co-worker, a $500,000 gas turbine experimental research project funded by Solar Turbines during Master’s program. Strong mechanical design knowledge ...
- 2016 Feb 03
Phoenix, AZ
... Typical structures included Steam Turbine buildings, pipe racks, Raw and Fire water Reservoir, chlorination building, and Deaerator structure. Assignments span from Structural design, submitting design reports for Approval of Authorities like ...
- 2016 Feb 01
Phoenix, AZ
... DIVISION MATERIALS MANAGER HEXCEL CORPORATION – SALT LAKE CITY, UT 3/2012 – 9/2013 Global aerospace manufacturer of carbon fibers, composite structures, and components used in commercial aerospace, defense, wind turbine, and recreational industries. ...
- 2015 Dec 20
Surprise, AZ
... ● Shaw Construction Employed (11/4/11 to 1/15/12) Instrument fitter/ pipe fitter Hope, AZ Job Duties: This was a grass roots project of a gas turbine power plant. I was involved in the installation of tubing, tray and related instruments, as well as ...
- 2015 Nov 13
Glendale, AZ
... Triumph Engines Tempe, Tempe AZ Nov 2006 – July 2008 • Repair and evaluation - analysis / development of repairs for APU and propulsion turbine engine components • Supported production in the repair and manufacturing of aerospace components. ...
- 2015 Sep 29
Tempe, AZ
... School, Mesa, AZ Jan 2015 -Aug 2015 Maintained the laboratory equipment, Perform research experiments on batteries for wind turbine applications and Teach High Schools students about renewable energy Analyzed the degradation of batteries in hot ...
- 2015 Sep 14
Tolleson, AZ
... November 2009 – April 20 5 Chromalloy Arizona Phoenix, Arizona Engineer II Develop and implement new repair procedures and improve existing repairs for Auxiliary Power Units and Industrial Gas Turbine engine components using lean manufacturing ...
- 2015 Sep 12