Post Job Free

Turbine resumes in Chandigarh, India

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 21 - 28 of 28

Quality Assurance Thermal Power

Chandigarh, CH, India
... 6 weeks training at panipat thermal power station Under turbine & generator unit (HPGCL) during B Tech studies. . 6 months training at panipat thermal power station. . 3 months training at shubham flexible packaging machines, Ballabgard,fridabad. ... - 2014 Feb 20

Project Mechanical

Chandigarh, CH, India
... • Summer Training (6th Sem) from Bajaj Motors Limited, Rudrapur in 2012 • Seminar on Vertical axis wind turbine, • Visited Loco railway lko in 2011. • Visited cold storage at Kanpur highway road in 2011. Academic project • Title: -Autonomous Flight ... - 2014 Jan 14

Project Objective

Chandigarh, CH, India
... Convent H.S.School (MP Board) 63 PCM 2008 10th National Convent H.S.School (MP Board) 64 All compulsory 2006 Industrial Training: • Organization: Bharat Heavy Electricals Limited, Haridwar (U.K) Duration: 1 Month Title: Turbine Fabrication Sector. ... - 2013 Aug 14

Mechanical Engineering

Chandigarh, CH, India
... ACADEMIC POJECTS : • Minor : Power generating through SPEED BREAKER • Major : Floating Turbine HOBBIES • Listening music • Watching TV WHY SHOULD YOU HIRE ME ? Being fresher I have a good knowledge of mechanical designing and handling of mechanical ... - 2013 Jul 31

Power Plant Manager

Mohali, PB, India
... Designation : Asst.Manager (Chemist) Responsibility : Working from pre-tendering to complete erection & Commissioning of 4x270 MW Power Plant having four no of BHEL make 865 TPH Pulverized fired boiler and Turbine also. Water treatment plant having ... - 2013 Feb 10

Engineer Management

Chandigarh, CH, India
... particle testing, Visual testing and Radiographic test Interpretation) - Production - Flight Engineer (Mi-8/Mi-25/35 helicopters) Strengths More than 20 years of experience in aerospace & gas turbine engines (Indian Air Force) in technical field. ... - 2013 Jan 10

Power Plant Mechanical

Chandigarh, CH, 160002, India
... The machine is combination of Fordrinear wire and Former Board with fully automation by Hansol (A sister concern of Samsung Group) and erection by IDEPL under Hansol supervision It’s a 200 tpd Duplex board With a Power Plant Having 5.5 mw turbine & ... - 2012 Mar 17

For Manager Engineering

Chandigarh, India
... POWER PLANT AND UTILITIES BOILER 120TPH, WP 86KG/SQ CM, WT 510DEG AND BOILER 50 TPH WP 65KG/SQCM, TEMP 490 DEG DECC TURBINE BHEL MAKE 12 MW AND SIEMENS MAKE BP TURBINE 23 MW PAHARPUR MAKE COOLING TOWER OF CAPACITY 2*1500 CUM/HR AND 2*200 CUM ... - 2011 May 06
Previous 1 2 3