|
Resume alert |
Resumes 41 - 42 of 42 |
Deer Park, NY, 11729
... Some of my projects were to manage the instillation of several steam/electric chillers, 1-1500 ton and 1- 500 ton turbine chillers at CBS operated by BMS Systems. Another was to supervise the instillation of a 15 ton Air-cooled HVAC system to the 83 ...
- 2010 Jun 26
New Hyde Park, NY, 11040
... Performance Systems Analysis (PSA) Developed Algorithms and S/W for Real Life Problem Solving Application of Data Analysis and Filtering methods for Performance Evaluation of Gas Turbine Jet Engines. Design and Development of Constrained Kalman ...
- 2010 Mar 09