Post Job Free

Thermal resumes in Lucknow, Uttar Pradesh, India

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 51 - 60 of 94

Liasoining Works with Govt Authorities, People etc to commence Project

Lucknow, Uttar Pradesh, India
... Duration From 1995 to 1997 Organization Century Cement, Baikunth, Position Project Engineer Project Captive Thermal Power Plant & other Plant units Project cost Rs. 25 Cr Responsibility Execution of Civil Work. 11. Duration From 1994 to 1995 ... - 2020 May 20

Power Plant Security

Lucknow, Uttar Pradesh, India
... WB performe General Dury, 3/- 1998 to 20 00 posted in Calcutta Port Trust perfome STF duty, 4/- 2000 to 2004 posted in Panki Thermal power Kanpur Up performe o fficialandliaison duty, 5/-2004 to 2008 posted in Gail India Auraiy a up perform Computer ... - 2020 May 19

Engineer Power Plant

Lucknow, Uttar Pradesh, India
... Project Name :Anpara Thermal Power Project, 2*500MW, BTPS, Sonebhadra (UP) Duration : One month. JOB EXPERIENCE: Started working in Tata Projects limited in Transmission and Distribution field in March 2017 to May 2019. Worked on a position of ... - 2020 May 19

Power Plant Engineer

Lucknow, Uttar Pradesh, India
... per annum (MTPA), 6 MTPA of cement, 60 mega watt of captivepower plant and 15 mega watt of waste heat recovery-based powerunit.Jun 10, 2019 Period : 2 Team Size: 1200 Role : Project Eriction Supervisor Field of Interest thermal Power Sector TG area. ... - 2020 Apr 29

Chemical Engineering Plant

Lucknow, Uttar Pradesh, India
... We were in the Production department and learned about how to enhance the Thermal Efficiency of the cooling fans of kiln. ACHIEVEMENTS AND POSITION OF RESPONSIBILITY I Served as HOUSE CAPTAIN in JNV Lakhimpur kheri. I took part in inter house ... - 2020 Apr 23

Coal inspection and analysis

Lucknow, Uttar Pradesh, India
... Chemist WORK EXPERIENCE Client : NABHA POWER LTD Super Critical Thermal Power Plant 2 700 MW (Rajpura Punjab) Company : ION EXCHANGE INDIA LTD Duration : AUGUST 2017 to July 2018 Designation: operator Job Responsibilities: My responsibility for ... - 2020 Mar 09

Engineer Test

Lucknow, Uttar Pradesh, India
... experiences Signal generator,DC/AC sources,Electric loads,Automated test figures,Fuctional testing,Hipot testing,Burn in test,Thermal testing,Flash Programming • Used tools such as PITSA,SAP for tracking the EMS flow and automated of core process • ... - 2019 Dec 30

Engineer Maintenance

Lucknow, Uttar Pradesh, India
... 3- Organization: Prince Engineering (sep - 2015 to july - 2016) (Under National Thermal Power Corporations Ltd Shaktinagar) (Distt:-Sonebhadra) Designation: Supervisor Area: Maintenance and Overhauling of Boiler Pressure Parts. Total Scope of Steam ... - 2019 Dec 22

Training Electrical Engineering

Lucknow, Uttar Pradesh, India
... Board, Naini Allahabad 2016 68.36 1st Summer Training: One Month Summer Training from Obra Thermal Power Project Obra Sonbhadra (UP) Experience: Apprenticeship Training: One year Apperenticeship Training in 5 200 M.W. BTPS, Obra Sonbhadra (UP). ... - 2019 Dec 01

Mechanical Engineer Power Plant

Lucknow, Uttar Pradesh, India
... Bara Thermal Power Station is an upcoming coal-based thermal power plant located in Bara Tehsil in Allahabad district, Uttar Pradesh. The power plant is owned by PrayagRaj Power Generation, a subsidiary of the Jaypee Group. The estimated cost of the ... - 2019 Nov 06
Previous 3 4 5 6 7 8 9 Next