|
Resume alert |
Resumes 51 - 60 of 117 |
Buffalo, NY
... architect and the design team § Alarko Construction, Summer 2013 Field Engineering Intern, Karakuz Dam and Hydroelectric Power Plant Project, Adana, Turkey - Learned the work safety procedure - Examined concrete pouring at body of dam - Analyzed the ...
- 2016 Jun 06
Buffalo, NY, 14224
... Responsibilities have included plant management, profit and loss management (P&L), production organization, human resources ... Word, and Power Point - OSHA 10 hour and lockout training -City of Buffalo 1st and 2nd class Stationary Engineers license
- 2016 Apr 25
Tonawanda, NY
... Pareto Analysis of Power distribution in the Water Treatment Plant to identify the major source of power consumption. Brainstormed the possible solutions with the team and developed a solution matrix for the root cause identified. Worked with ...
- 2016 Mar 28
Niagara Falls, ON, Canada
... Laptop and Workstation fixing: soldering power ports, replacing LCD and brackets, HDD, memory faults. Install Configuration ... Support 04/2005 – 12/2009 Cherry Forest Product (Wood and lumber production plant) Recoded (Visual Basic and SQL statements ...
- 2016 Mar 23
Buffalo, NY
... 12/5/91 – 8/21/1999 Master Scheduler Utilized ERP system Work Station Basic to plan MRP and CRP plant wide Implemented order entry system into MRP for an 80% more accurate work schedule for both materials and man power planning TQM / ISO 9000 TEAM ...
- 2016 Mar 03
Bowmansville, NY
... May 2015 – Aug 2015 Summer Intern Designing & Improving the plant electrical protection system such as Arc Flash Studies using SKM Power tools software at Climax Molybdenum, Ft Madison Iowa. Improve the reliability of the plant power system with ...
- 2015 Oct 22
Niagara Falls, ON, Canada
... pumps and waste water treatment * Creek bed and bank restoration Labourer 2013 Nabisco Plant Niagara Falls, Ontario Terry 513-***-**** *Cleaning and power washing outer surface of building *Windows scraped and re-cauked * Brick work dismantled, ...
- 2015 Oct 21
North Tonawanda, NY
... Greatbatch, Inc., Clarence New York 1988 - 2006 Developer/manufacturer of implantable and commercial power sources and ... Streamlined plant flow, reducing layers of direct personnel and set-up to run full capacity. Implemented Lean concepts and ...
- 2015 Aug 17
Buffalo, NY
... Long haul truck driver to deliver and pack goods that were to go all over the county in a desired time period cp&l south port power plant south port, NC United States 01/1992 - 01/1993 Hours per week: 50 asbestos remover and insulator Duties, ...
- 2015 Jul 30
Buffalo, NY
... regulations of electricity Protection Engineer Intern - North Chennai Thermal Power Station, Chennai (India) June 2012 - July 2012 Learned the working of thermal power plant and substation operations carried out by NCTPS, India Assisted the plant ...
- 2015 Apr 23