Resume alert |
Resumes 21 - 23 of 23 |
Tista Bazar, WB, India
... 2015 to Till date with Simar infrastructure ltd for TalwandiSabo (PB) power plant 3*660i.e 1980 mw super critical thermal power plant banawala(Distt:Mansa)As manager pneumatic and hydraulic instrumentation. Role: Area in charge for coal mill, ash ...
- 2016 Aug 10
Siliguri, WB, 734001, India
... TRAININGS/ PROJECTS Industrial training at “VISAKHAPATNAM STEEL PLANT” (17TH June, 2013 - 6TH July, 2013). Vocational training from “SIMPLEX INFASTRUCTURE PVT. LTD.” under Kolkata Port Trust. (15 days). SUBJECTS OF INTEREST IC Engine Hydraulic ...
- 2016 Mar 02
Kalimpong, WB, 734301, India
... 2.WORKED IN QATAR PRIMARY MATERIALS COMPANY AS A PLANT FOREMAN FROM 2007 TO 2012. RESPONSIBILITIES a. RUNNING THE SAND PLANT ON SCADA AND HMI. b. SENDING REPORTS TO SUPERIORS AND SAND SAMPLES TO LAB AT THE END OF THE SHIFT. c. LOOKING INTO THE ...
- 2013 Jan 05