Post Job Free
Sign in

Cell Site Integrator

Company:
TEKsystems
Location:
Broward County, FL
Posted:
June 14, 2025
Apply

Description:

Job Description

Top Skills' Details

1. 5+ years as a cell site of field tech

2. Ericsson experience (Must Have)

3. Projects include Macro's + Small Cell

4. Verizon experience nice to have

Job Description

Projects Supported:

Small Cell 5G Only

Small Cell 4G Only

Small Cell 4G & 5G (C-Band or 5GmmWave)

ODAS Node

IDAS Node

Macro New Build (assumes 4G and C-Band)

Macro Carrier Add (includes C-Band)

Macro RELO

Macro Drop & Swap

Macro C-Band Prep/Conversion

Macro Sector Add

Baseband Upgrade

The below tasks cover the major projects:

Small Cell, IDAS, ODAS 5G Milestone Integration Tasks

- Order License Key File (LKF) via IOP

- Import LKF to Ericsson Network Manager (ENM) via IOP

- Generate SiteInstall file (integration file) via IOP

- Install SiteInstall file onto 5G radio

- Once integration file reaches 65% install completion, click on the integrate icon

- When integration file reaches 100%, the radio is ready to verify connectivity to ENM

- Use ENM Scripting Server to verify that the ENM and radio are communicating

- Verify node is synchronized

- Verify node is on the latest software version, if not upgrade via ENM

- Run Post Integration Script via ENM Scripting Server

- Run Post Upgrade Script via ENM Scripting Server

- Verify PTP timing

- Repeat above steps for each 5G radio

- Assuming there are no issues, hand over the project to System Performance (SP) to build anchors and run their scripts

- SP will hand the project back to NA to finalize the activations process

- Test all radio/sectors and do speed and ping tests

- Enter testing data into IOP

- Complete all IOP Quality Check List Tasks

- Activate Call Signs in IOP [FINAL TASK & PAY POINT)

Small Cell, IDAS, ODAS 4G Milestone Integration Tasks

- Verify power, SFP, and overall Hub readiness to integrate baseband (reference RiPort Map)

- Order License Key File (LKF) via IOP

- Import LKF to Ericsson Network Manager (ENM) via IOP

- Generate SiteInstall file (integration file) via IOP

- Install integration file onto baseband

- Once integration file reaches 65% install completion, click on the integrate icon

- When integration file reaches 100%, the baseband is ready to verify connectivity to ENM

- Use ENM Scripting Server to verify that the ENM and baseband are communicating

- Verify node is synchronized

- Verify node is on the latest software version, if not upgrade via ENM

- Run Post Integration Script via ENM Scripting Server

- Run Post Upgrade Script via ENM Scripting Server

- Run 4X scripts in SAT Tool (if not done via the install files)

- Verify PTP timing

- Check RSSI on each radio/sector

- Verify light levels on fiber

- Assuming there are no issues, hand over the project to System Performance (SP) to build Golden Parameters and run their scripts

- SP will hand the project back to NA to finalize the activations process

- Perform E911 testing

- Complete all IOP Quality Check List Tasks

- Activate Call Signs in IOP [FINAL TASK & PAY POINT)

Macro New Build, RELO and Drop-and-Swap 4G & C-Band Milestone Integration Tasks

- Verify power, SFP, and overall Hub readiness to integrate baseband (reference RiPort Map)

- Verify fiber path

- Integrate IXRe at cell site (work with MSC)

- Order License Key File (LKF) via IOP

- Import LKF to Ericsson Network Manager (ENM) via IOP

- Generate SiteInstall file (integration file) via IOP

- Install integration file onto baseband

- Once integration file reaches 65% install completion, click on the integrate icon

- When integration file reaches 100%, the baseband is ready to verify connectivity to ENM

- Use ENM Scripting Server to verify that the ENM and baseband are communicating

- Verify node is synchronized

- Verify node is on the latest software version, if not upgrade via ENM

- Run Post Integration Script via ENM Scripting Server

- Build ERAN via feature activation tool for carrier aggregation

- Run Post Upgrade Script via ENM Scripting Server

- Run 4X scripts in SAT Tool (if not done via the install files)

- Verify PTP timing

- Build RETs via IOP (scan & troubleshoot with tower crew if not visible in IOP)

- Check RSSI on each radio/sector

- Verify light levels on fiber

- Assuming there are no issues, hand over the project to System Performance (SP) to build Golden Parameters and run their scripts

- SP will hand the project back to NA to finalize the activations process

- Perform E911 testing

- Drive test site and test all sectors, to include speed tests

- Complete all IOP Quality Check List Tasks

- Punch down environmental alarms

- Update FUZE Compliance (hazard materials on site)

- Apply stickers and signage

- Install and wire up Centeron Fuel Monitor

- Activate Call Signs in IOP [FINAL TASK & PAY POINT)

Macro Carrier Add C-Band Modification Milestone Integration Tasks

- Verify power, SFP, and overall Hub readiness to integrate baseband (reference RiPort Map)

- Integrate IXRe at cell site (work with MSC)

- Order License Key File (LKF) via IOP

- Import LKF to Ericsson Network Manager (ENM) via IOP

- Work with tower crew for radio swap out (RUL/RUS to 4449 and/or 8843)

- Use scripting tool and SAT Tool to add and delete radios from existing baseband

- Generate SiteInstall file (integration file) via IOP

- Install integration file onto new baseband (6648)

- Once integration file reaches 65% install completion, click on the integrate icon

- When integration file reaches 100%, the baseband is ready to verify connectivity to ENM

- Use ENM Scripting Server to verify that the ENM and baseband are communicating

- Verify node is synchronized

- Verify node is on the latest software version, if not upgrade via ENM

- Run Post Integration Script via ENM Scripting Server

- Build ERAN via feature activation tool for carrier aggregation

- Run Post Upgrade Script via ENM Scripting Server

- Run 4X scripts in SAT Tool (if not done via the install files)

- Verify PTP timing

- Build RETs via IOP (scan & troubleshoot with tower crew if not visible in IOP)

- Check RSSI on each radio/sector

- Verify light levels on fiber

- Assuming there are no issues, hand over the project to System Performance (SP) to build Golden Parameters and run their scripts

- SP will hand the project back to NA to finalize the activations process

- Drive test site and test all sectors, to include speed tests

- Perform E911 test (if required…usually at a 700MHZ only site getting upgraded)

- Complete all IOP Quality Check List Tasks

- Punch down environmental alarms

- Update FUZE Compliance (if any new hazard materials were added to site)

- Apply stickers and signage (for new cabinets)

- Activate Call Signs in IOP [FINAL TASK & PAY POINT)

Full-time

Apply