Location: Fountain Inn, SC
Position: Direct (Full-Time)
Title: 25-02542 - Mold Tech (Plastic Injection Molding)
Job Description:
Complete tool changes on injection molding machines
Troubleshoots issues, and performs machine and tool PMs
Must be able to operate a hi-lo and hoist, list heavy skids
Must be able to complete weekly preventive maintenance on machines and tools, apply
force of 75lbs or greater for clamping tools in machines, and frequently lift weight over
50lbs
Attendance at training classes and scheduled meetings will be required
Other specific duties will be required as specified by their supervisor or the molding team
supervisor
All individuals will maintain a professional attitude and work ethic.
Qualifications:
3 months mold change experience minimum, preferably injection molding.