Post Job Free
Sign in

Bowling Mechanic

Company:
Ladgov Corporation
Location:
Melbourne, FL, 32901
Posted:
April 09, 2024
Apply

Description:

Job Description

Position Title: Bowling Technician

Location: Patrick Space force Base

Routine Lane Maintenance Services

General: The applicant shall be responsible for performing and documenting preventive lane maintenance services.

Daily preventive maintenance shall include the following and shall be documented on the checklist provide in Appendix A:

Check call sheets for the previous day and transfer calls to stop summary

Cycle/check machines, foul lights and related equipment

Investigate/correct machines that have developed a malfunction pattern

Clean ball lift and distributor belts

Clean pin elevator

Clean pin guide and orientor pan

Keep work area, workbench and service isle clean & orderly

Assign and record preventive maintenance on the preventive maintenance charts

Weekly preventive maintenance shall include the following and shall be documented on the checklist provide in Appendix A:

Clean shuttle and bin

Clean, check ball door exit, lift arm, paddle, LBS operation

Clean ball lift assembly, lift rods

Clean pit carpet belt

Clean pin curtain, cushion, drip pans

Tighten plows, check for cracks and replace as needed

Change ball wipes

Clean bowling pins

Inspect distributor, observe for proper operation and correct as needed

Monthly preventive maintenance shall include the following and shall be documented on the checklist provide in Appendix A:

Check, clean, correct, adjust, spotting cups, respot cells, and table assembly in general.

Check, clean correct adjust, sweep assembly

Check, clean, correct ball tracks, down sweeps

Check, correct, adjust carpet belt tracking, front and rear rollers

Check, correct, adjust bounce board, dampers, supports, ground strap

Check, correct, adjust cushion assembly and shock

Blow out sweep and table brakes

Check all machine belts, replace asneeded

Clean distributor assembly

Quarterly preventive maintenance shall include the following and shall be documented on the checklist provide in Appendix A:

Clean the machine framework, drip pans

Complete quarterly lubrication items

Tighten front and rear jackscrews

Tighten pin cushion and hangar boxbolts

Remove distributor clutch assembly. Clean the pinion and sleeve, friction disks metal and plastic. Use fine emery cloth to smooth friction disk. Lubricate pinion and sleeve and reassemble.

Check: pin holder brackets, shuttle straps, shuttle operator rod. Repair as needed. Tighten shuttle bolts.

Yearly preventive maintenance shall include the following and shall be documented on the checklist provide in Appendix A. Check the following for worn or broken parts, repair or replace as needed:

Table and sweep arms, shaft bushings, keyways and pillow blocks

Complete annual lube chart items

Check/correct gearbox oil leaks and change oil

Rebuild table drive

Rebuild carpet roller and pit assembly

Rebuild distributor assembly

Rebuild ball lift assembly, light ballsensor

Clean underground return tracks, tighten down sweep track

Routine Lane Machine Services

4.1 General: The contractor shall be responsible for performing and documenting lane machine services as shown below:

Daily preventive maintenance shall include the following and shall be documented:

Using a clean cloth, wipe down the entire length of the power cord

Completely wipe down oil compartment. Do not clean the transfer brush or buffing brush unless needed

Clean drip pads on each side of the machine in the oil compartment

Clean the drive, lane distance and momentary wheels. Dust & lint shall not be allowed to build up

Wipe squeegee clean & inspect for wear. An extra set of blades must be kept on-site as a backup and must be stored in a dark cool space

Wipe down front of the machine

Wipe off outside of the machine

Monthly preventive maintenance shall include the following and shall be documented:

Using compressed air, remove dust from all surfaces

Inspect recovery tank filter. Replace as specified in Appendix 3 or as needed

Clean lint from transfer brush and clean between brushes

Replace duster cloth if required. If the duster cloth is changed clean the entire cleaning compartment and lube the cleaner head bar

Wipe off casters

Remove large black covers and clean around the motors

Inspect the motor end of the vacuum and make sure dust does not build up on the cover for the vacuum motor

Inspect vacuum housing and troubleshoot if wet

Inspect power cord (ends and entire length) for splits or wearing. Replace as needed for proper operation and safety

Routine Supplies and Parts:

The contractor shall furnish The Alley Manager with a list of required supplies and required stock levels to perform routine service and preventive maintenance on at least a monthly basis. The Alley Manager will ensure required routine supplies and parts are on-hand prior to on-site visits.

The Alley Manager will provide all applicable owner/operating manuals for machinery to be maintained.

Powered by JazzHR

CutQzQtJAE

Apply