Post Job Free

Commissioning or Plant or Plc jobs in Columbus, OH, 43215

Sign in
Sorry, this job has been deleted.
Please consider applying to the jobs below.
Search for: Jobs   Resumes


distance:
Job alert Jobs 1 - 10 of 730

Plant Manager

T. Marzetti Company  –  Columbus, OH
... Overview: Directs and manages all plant operations with overall responsibilities for production, processing, maintenance, human resources, sanitation, accounting, materials management and other requirements necessary to the successful operations of ... - Apr 25

Plant Services Engineering Lead

Mill Run  –  Hilliard, OH, 43026
... Participate in emergency troubleshooting to expedite the plant's return to production. Lead sourcing and installation of critical plant support equipment (chillers, compressors, towers, vacuum pumps, grinders, and electrical infrastructure). Work ... - Apr 16

2nd Shift Plant Attendant

T. Marzetti Company  –  Columbus, OH
... Overview: The plant attendant contributes to the production environment at T. Marzetti by coordinating with the operators and forklift drivers to keep the production areas clean, organized, and running efficiently. 2nd Shift full-time schedule of 40 ... - Apr 24

Plant Operator (1st shift: Mon-Sat.)

Kokosing  –  Columbus, OH
... Summary: Responsible for the operation of the plant as directed by supervision and for the coordination of the activities relating to safety, maintenance and production of the processing operation ** This role is 1st Shift with a schedule of Monday ... - Apr 25

3rd Shift Plant Attendant

T. Marzetti Company  –  Columbus, OH
... Overview: The plant attendant contributes to the production environment at T. Marzetti by coordinating with the operators and forklift drivers to keep the production areas clean, organized, and running efficiently. 3rd Shift full-time schedule of 40 ... - Apr 24

Plant Services Engineering Lead

Mill Run  –  Hilliard, OH, 43026
... Participate in emergency troubleshooting to expedite the plant's return to production. Lead sourcing and installation of critical plant support equipment (chillers, compressors, towers, vacuum pumps, grinders, and electrical infrastructure). Work ... - Apr 16

Plant Engineering Manager

Path Engineering  –  Gahanna, OH
Job Description Role As a Plant Maintenance Engineer (also known as Facility Maintenance Manager, Plant Equipment Engineer), ... Proficiency in PLC Programming, Industrial Robot Programming, Continuous Improvement, Mechanical and Electrical ... - May 10

Sr. Maintenance Technician- PLC

Niagara Bottling  –  Gahanna, OH, 43230
... PLC Sr. Maintenance Technician-PLC ensures equipment uptime through timely, in-depth electrical troubleshooting of 480VAC & 24VDC components. The Sr. Maintenance Technician-PLC has strong working knowledge of all operating systems in the plant ... - May 07

Plant Engineering Manager

Niagara Bottling North America  –  Gahanna, OH
Job Description Responsible for the design, construction, maintenance, and/or repair of plant equipment and machinery. ... You should be proficient in: PLC Programming Experience Industrial Robot Programming Continuous Improvement Mechanical ... - May 10

Cannabis Plant Manager

Wyld  –  Columbus, OH
The Plant Manager’s key purpose is directly leading all departments and functions of the manufacturing facility. This includes but is not limited to: ensuring accountability at all levels; managing department managers (Admin, Inventory, Production, ... - May 09
1 2 3 4 5 6 7 Next