Post Job Free
Sign in

Construction Scheduler

Company:
Embark Recruiting Solutions
Location:
Clinton Township, OH, 43224
Posted:
March 10, 2026
Apply

Description:

Title: Construction Scheduler

Location: Columbus, OH

Duration: Direct Hire

Our client, located in Columbus OH, has an immediate need for a Scheduler. This is a direct hire / full time position. Details are as follows:

The scheduler shall have an in-depth knowledge of construction practices and sequencing

The construction scheduler shall review construction schedules with supporting documentation and provide reports to project team

Analyze scheduling scenarios to assist the project team

The scheduler shall demonstrate the ability to prepare a Critical Path Schedule (CPM)

Assist the Project Team in evaluating and monitoring the Contractors progress schedule as well as consulting and troubleshooting issues throughout the construction of the project

The scheduler shall have excellent computer skills with in-depth knowledge of Primavera P6 scheduling software and Microsoft Project.

Ability to utilize Microsoft Office products, specifically Word and Excel will be required Experience:

Must have a minimum of 3-5 years' scheduling experience

BS degree in Civil Engineering or Building/Construction Management is preferred

Strong background using Primavera P6 scheduling software

Experience with construction schedules for the design-build phase of the projects

Critical Path Method (CPM) scheduling knowledge/experience and the ability to analyze schedules to determine duration and logic issues

Experience developing detailed resource loaded design and construction schedules, and preparing progress/status reports and performance of earned value analysis

Experience with time impact analysis

Construction claims and change order experience is preferred

Construction scheduler should have experience integrating the construction schedule into the master schedule

Candidate must be able to demonstrate excellent verbal and written communications skills

The scheduler shall have excellent computer skills with in-depth knowledge of Primavera P6 scheduling software and Microsoft Project.

Ability to utilize Microsoft Office products, specifically Word and Excel will be required

Apply