|
Resume alert |
Resumes 51 - 60 of 99 |
Grove City, OH
... Advanced experience with instrumentation and control of level, flow, absolute pressure, differential pressure and temperature in piping, vessels and other process equipment. Evaluated numerous structures for corrosion visually and ultrasonically. ...
- 2015 Jul 28
Columbus, OH
... of pipe Bruner Corporation, Columbus, Ohio Shop/Field welder, 2010-2011 Fabrication and installation of pipe Kirk Williams Piping, Grove City, Ohio Pipefitter/Welder Apprentice, 2004-2009 Training in all aspects of welding and installation of pipe ...
- 2015 Jun 30
Worthington, OH
... FLUENT, and CAD Language skills: Read, write, speak basic German Building skills: Able to assemble and work on lab-scale and field-scale equipment from instruction manuals and drawings, proficient in soldering, drilling, sanding, and sawing. ...
- 2015 Jun 11
Canal Winchester, OH
... Had rig training classes. Sent to School through company to Owens Tech where I learned a more depths on blueprint reading, weld symbols, mig, stick, carbon arcing, and some tig welding. • Press operator/millwright/kitter: loaded and unloaded the ...
- 2015 Feb 20
Columbus, OH
... environmental systems, air handling units, electrical and distribution systems, including equipment management controls (VFDs', AFDs', and PLCs), plumbing, piping, control systems, building energy management, fire suppression, and security systems. ...
- 2014 Sep 10
Columbus, OH
... Nutting/ A Terracon Company, Columbus, Ohio 2002- 2010 Geotechnical Engineering, Drilling, Construction Testing and Inspection and Environmental Engineering Firm Senior Project Manager/Project Environmental Geologist Office Health and Safety ...
- 2014 Aug 23
Powell, OH
... Once we arrived we would rig up iron to pump cement down the hole. After 12-40 hours we would rig down the iron and drive the equipment back to the Zanesville yard. Reason for wanting to change jobs: I did enjoy this job, however, I was not making ...
- 2014 Jul 22
Worthington, OH
... Oversight of the welding and installation piping spools at Davis Besse . NFPA 805 Transition at Davis Besse Power Station, Oak Harbor Ohio . Planner / Scheduler for the NFPA 805 Fire Protection Transition Project . Facilitate Walk-down schedules ...
- 2014 Jun 30
Powell, OH
... Complete layout of piping to gas/oil well for fracking; Setup pumps, cabling, and safety shutoffs; Pressure test piping; Monitor equipment during fracking operations; Perform equipment maintenance 2002 – 2012: cable/phone installer for Full Moon ...
- 2014 Jun 11
Blacklick, OH, 43004
... Tig Welder 6-G certification on 2" dia to 6" dia carbon steel alloy and stainless steel pressure vessel piping assemblies. ... Typical shop fab work including, welding, layout, drilling and assembly from blueprint through completion. 03 to 04 Better, ...
- 2014 May 03