|
Resume alert |
Resumes 51 - 60 of 189 |
Delaware, OH
... devices • Supporting Field Technician on customer’s site-visit • Projects: Wirelessly powered miniature self-leveling pipe inspection camera • Designed to be drop-in replacement for old system • Backward compatible with existing NTSC monitor ...
- 2020 Jun 10
Columbus, OH
Name Murad Hasan Suleiman AlFuqaha Residency Herndon, VA Contact details 202-***-**** E-Mail Address adc2a0@r.postjobfree.com SUMMARY OF PROFILE: Communication Engineer with 10 years’ work experience focused in Cellular Engineering and Optimization ...
- 2020 May 03
Columbus, OH
... Education Hobart Institute of Welding Technology October 2008 Structural and pipe welding course. Primary Leadership Development Course Non-Commissioned Officer Academy United States Army Commandant’s List References Available upon request
- 2020 Apr 21
Dublin, OH
... using AutoCAD in the structural and mechanical engineering fields Developed 3D models and drawings of structural piping, pipe supports, and bulk material handling systems using AutoCAD 2019 and CADWorx Designed and drafted plant and equipment ...
- 2020 Mar 05
Columbus, OH
... -Assure following the correct procedure to any fluid contamination, hole-cleaning problem, and stuck pipe events. -Offshore job required, at Lago de Maracaibo. P.P.S (2012-2013) Drilling Fluid Engineer -Assists clients by providing solutions for ...
- 2020 Feb 27
Ostrander, OH
... toward quality control within transportation Facilitated on-site problem solving, supervised installation of inventory with foreman, site supervisors and staff Worked in supervisory roles in real estate environments analyzing opportunities to ...
- 2020 Feb 05
Columbus, OH
... A” School Gulfport MS 1990 Graduate Kenmore High School Akron, Ohio November 2013 – October 2019 Heavy Crane Operator • Yard Foreman • Fabcon Precast, Inc July 2013 – November 2013 Heavy Equipment Operator • Operating a variety of large equipment in ...
- 2020 Jan 23
Columbus, OH
... • Managed all workers and foreman according the delivery date schedule to achieve the high quality and quantity. • Material and production planning for all orders, calculated the lead time required to control our inventory levels and production ...
- 2019 Sep 25
Dublin, OH
... Calculated size and reinforcing bar for various concrete piers, foundations, and pipe supports. Designy and modeled components in AutoCad software. Reviewed bids from subcontractors. Designed a new steel support structure for a cable tray on AutCad. ...
- 2019 Apr 30
Columbus, OH
... Led process development team and analyzed cure quality of NAF binder-based pipe products, using plants air system. oDefined, specified, and installed hot-air compressor-based system to deliver 400 scfm heated air for product curing. Recommended ...
- 2018 Nov 15