Resume
Login
Email

qc mechanical inspector

Location:
chennai, Tamil Nadu, 600041, India
Salary:
60000 for 08 hours/month
Posted:
April 07, 2011   all resumes
Email:
x6cfi0@r.postjobfree.com
Contact Info:
***************@*****.***


RESUME

M. SHEIK RAHMAN
QA/QC PIPING/MECHANICAL INSPECTOR

ARAMCO APPROVED
SAP NO.: (70007619)

PHONE: 053*******

E- mail : x6cfi0@r.postjobfree.com

x6cfi0@r.postjobfree.com

TOTAL 11 YEARS EXPERIENCE IN OIL AND GAS PLANTS & FABRICATION

Summary:
Having 11 years of experience in Petro Chemicals & Refineries, Gas Plants and Thermal Power Plants Construction and well versed with ASME, API, &ASTM Codes related to Unfired Pressure Vessels, , Cross Country Piping, Plant Piping, and Storage Vessels.
Presently working in Saudi Arabia in AL SUWAIKET SUPPORT SERVICES AS QA/QC MECHANICAL/PIPING INSPECTOR
OBJECTIVE:

Challenging Project opportunity where I can contribute my talents to a successful team and to further my knowledge in Mechanical Engineering Field for development of organization and self.
To develop my career as a highly talented associate where I will be a valuable team member, contributing quality ideas and work for an organization where there is an ample scope for individual as well as organizational growth.

PERSONAL INFORMATION:

Name : M. Sheik Rahman

Date of Birth : 01st June 1979

Nationality : Indian

Academic Qualification:

DIPLOMA Engineering in MECHANICAL with first class from MOHAMED SATHEK POLY TECHNIC COLLEGE, KILAKARAI, TAMIL NADU, INDIA.

COMPUTER SKILL:

• Diploma in Auto CAD - 2000
• Diploma in Microsoft Office - 2003

WORKING EXPERIENCE:
Client : CONTRACTING TRADING COMPANY (C.A.T.)
Project : SRG 2 PIPE LINE PROJECT
Position : QA/QC Mechanical/Piping Inspector
Duration : SEP. 2009 to till date

Client : TECHNICAS REUNIDAS GROUP (T.R.G.)
Project : HAWIYAH GAS PLANT EXPANSIOPN PROJECT
Position : QA/QC Mechanical/Piping Inspector
Duration : NOV. 2008 to SEP. 2009

Client : SNAMPROGETTI Saudi Arabia Limited
Project : KPF Project - Khursaniyah
Position : QA/QC Piping Inspector
Duration : Jun. 2008 to AUG 2009

Company : Consolidated Contracting Company
Project : Hawiyah NGL Recovery Facilities
Position : QA/QC Piping Inspector
Duration : Dec. 2007 to May 2008

Job Responsibilities:

• Preparing the Punch List of before Hydro & after Hydro.
• Preparing the reinstatement documentation.
• Inspection of works like grinding taking corrective actions.
• Checking of joints and different fittings
• Strict Adherence to safety requirements and regulations.
• Preparation of plans and elevation of piping.
• Review&Preparation of hydro test packages
• Conducted Surveillance on different pipe spools to insure it conforms to project specification and codes.
• Confirm the piping system concurs with flow diagrams to verify completeness of system.
• Evaluation of test package contents, lines checking against drawing requirements to ensure completeness and accuracy of the piping system.
• Verify initiation of field piping and equipment pressure test punch list. Ensure correction or completion of punch list items.
• Verify preparation of piping test package including piping test record.
• Verification of closed punch items and conduct walk through for each completed piping system prior to mechanical acceptance.
• Stage-wise inspections and fabrication of piping, structures and installation of equipment.
• Ensure satisfactory identification of materials, proper protection of piping and fittings. Verify proper size and schedule of pipe, rating of flanges, proper flange face and fittings.
• Witnessed hydro test and pneumatic test of pipelines prior to pre-commissioning.
• Review/check complete plan to be installed to be able to perform the easiest way in field fabrication and erection.
• Verify materials as per fitting and pipe mill certificate.
• Attended to punch listed items and monitoring the completion punch listed activities.
• Initiate NCR, RFI for all materials which does not confirm with project specifications and codes.
• Represent our company in management and technical meeting in project assigned.
• Monitoring daily workloads and activities.
• Preparation of Record of Repairs.
• Preparation of the Test packs for Hydro testing & Punch list
• Witness of Hydro test and Pneumatic test
• Preparation and monitoring of Non-Conformance reports ( NCR)
• Inspection of various activities as per ASME B31.3
• Positive material identification for alloy steel and stainless steel materials
• Documentation of Quality records
• Review and maintaining records of Calibration certificates of Instruments, Personnel Certifications, Batch test Certificates for Consumables etc.
• Compile and write training material and conduct training sessions on quality control activities. Conversant to coach new comers on Inspection and Testing techniques and equip them with the skill to gainfully utilize various Inspection and Testing tools and equipment.

Company : Al Shaiban Establishment for Trading & Contracting
Project : Tie-in ABQ-494 F/L to ABQ-GOSP-6
Position : QA/QC Mechanical/Piping Inspector
Duration : Aug. 2007 to Dec. 2007

Job Responsibilities:

• Service activities inclusive of fabrication, installation of piping, hydro testing and commissioning works.
• Identifying the material (pipes, flanges, fittings etc) as per the material take off list and isometric drawings during the fabrication.
• Follow and practice of International codes ASME, ASTM, ANSI, and Saudi Aramco engineering procedures.
• Preparing inspection reports and other relevant documents.
• Site surveillance to check the construction work and give comments it necessary according to standard installation.
• Prepare inspection request prior to accept the construction piping / welding work, pressure testing and releasing of fabricated pipe lines in order to prepare certification for the completed items.
• Responsible for the system definition of tie in and other lines in the existing plant by marking up the P&ID and shoring the test limit and prepare and arrange for pressure list.
• Full inspection coverage of all tie-ins & hot-tap activity in conformance with approved construction method of statement.

• Co-ordinate with construction, testing group and QC department in the preparation test requirement of each test pack and facile close out of any outstanding punch items.
• Preparation of Hydro test (hydro, pneumatic and service) packages for tie-in and nearly installed pipelines.
• Receiving piping isometrics, support drawings and details.
• Maintain housekeeping and proper arrangement of spools in lay down yard as per the standards.
• Inside and outside building plumbing works inspection, carried out as per approved inspection and test plan of Saudi Aramco standards and drawings.
• Coordinating with Saudi Aramco inspection department as per the scheduled time of inspection.
• Responsible of fabrication and erection of piping work as per drawings and specifications.
• Supervision of fabrication, testing and commissioning of underground/aboveground pipes.
• Preparation of welding procedure Specifications and maintaining procedure qualification records conducting welders test, various destructive and non-destructive tests.
• Planning for fabrication, erection & testing of pipe works.
• Allocation of jobs among various working groups.

• Study contract & specification thoroughly for developing PQP and QIPs/ITPs for various projects to meet customer’s expectation/requirements comprehensively.
• Implementation of QIPs/ITPs at site.
• Controlling all quality control activities on day-to-day basis and directly involving in all inspection activities and ensuring various projects to meet quality requirements.
• Inspection and acceptance to customer supplied materials, contractor supplied materials such as Plates, Pipes, Fittings, as per requirements of the Client Specifications.
• Review of material test certificates as per Codes, Standards and Client specification
• Inspection of the internals of the vessels, columns, furnaces, Exchangers & coolers,
• Witness of the Pressure Testing Of Equipments, Exchangers.
• Involved in the inspection of the valves
• Preparing checklists for internal inspection of all fired heaters, vessels, columns, tanks, reactors, etc., planning and execution of the repair works.

Company : Raanat Engineering Industries Ltd.
Position : QA/QC Inspector
Duration : June 1999 to JAN 2002

Company : Tamil Nadu Health Transport Dept…
Position : Diploma Trainee
Duration : Feb 2002 to Feb 2003

Company : Ganesh construction co (P)Ltd
Position : QA/QC Engineer
Duration : Mar 2003 to Mar 2007
Job Responsibilities:

• Maintaining the drawing and documents
• Preparing the progress schedule and reports.
• Identify the material (pipes, flanges, fittings etc) as per the material take off list and isometric drawings during the fabrication.
• Inspecting the incoming materials for damages, dimensions, corrosions and ensure that Material Test Certificate is available and according to the requirements.
• Supervision of construction, installation and erection of pipeline jobs
• Review of contractor's WPS/PQRs prior to start of welding activities.
• Inspect piping just before to verify that interior is clear of foreign materials.
• Check edge preparation and fit-ups to verify that fit-up is within tolerance.
• Preliminary welding inspection activities (fit-up, root pass, intermediate, and hot pass, materials trace ability, dimensional checking and orientations of piping components).
• Check and assure that all joints are exposed for examination during pressure test.
• Check vents are open when filling and draining lines.
• Confirm repairs re-testing and re-inspection accordance to specification.
• Over all co-ordination with piping QC team.
• Internal inspection of fit-up, welding of pipeline, joint check up of pipeline using P&ID and Isometric Drawings.
• Taking joint measurement of work done along with the clients / contractors and preparation of necessary certificate.
• Attending the Progress meeting with client and discussing about the work schedule.
• Maintaining the material stock require.
• Controlling the quality of the works as per given standard, drawings and Inspection and Test Plan.
• Ensure blinds are removed and correct gaskets are installed.
• Verify that Control Valves and other items that were removed for the tests are replaced.
• Review drawing and specification, responsible for material take-off, withdrawing, and controlling the material, raising construction technical query whatever engineering problem. Making field modification report whatever changes or revision on the drawing, Raising field inspection report whatever problem on the line, make and submit daily progress report, push and motivate people to attain productivity schedule, checking and distribute work activities.
• Study all isometric drawings approved for construction prior to distribution to different areas of work for sub-contractors to undergo.
• Responsible for the fabrication and construction of pipes to its exact location I area as per ISO drawing.
• Monitors the daily and weekly accomplishment of sub-contractors whether or not they have performed ahead of schedule.
• Help assist lack fittings in withdrawals and orders same upon non¬ availability of stock at warehouse.
• Attends regular weekly meetings with superiors, owner and sub-contractors to whatsoever discussions may arise involving safety, piping and welding operations in general to lessen and I or eliminate problems arising at different field of work.

PERSONNEL PARTICULARS

Father name : S.S. MUSTHABA
Date of Birth : 01-06-1979
Nationality : Indian
Marital status : Married
Passport No : J2041866

Date of Issued : 28-06-2010
Date of Expire : 27-06-2020
Place of issued : Riyath
Languages Known: English, Tamil and Hindi

Permanent address

c/o Zaheer Hussein,
No:1911,TNHB,
Ayambakkam,
Chennai-600077.

(M. SHEIK RAHMAN)