Resume Text:
|
John Patrick Smith **** ******** ***** Oakley, CA 94561 ============================================================= H: (925) ***-**** p0ol6a@r.postjobfree.com C: (925) ***-****
SUMMARY =========
Detail oriented Senior Planner and process oriented Senior Supervisor with proven success leading teams to meet aggressive operational goals. Expertise includes Planning, Management, Materials, Scheduling, Training and Problem Resolution. Hands-on troubleshooter combined with a solid background in Materials and Production with global / multi-site experience. Expertise includes:
• Safety • Quality • Process • Lean • Systems
PROFESSIONAL EXPERIENCE =========================
SYSTRON DONNER AUTOMOTIVE Concord, CA 2004 – 2009
Senior Production Supervisor 2008 – 2009 Managed an overall staff of 63 employees on the Grave Shift and then over the Day Shift operation within the Quartz Fabrication Factory managing 150 process steps overall.
• Developed a real time process schedule to implement a Pull System and reduce WIP by 25% • Installed a fully operational Grave Shift without compromise to Safety, Quality or Schedule within a 60 day period • Contributed to our site exceeding 1,000,000 hours worked without a loss time accident
Planning and Inventory Control Supervisor 2004 – 2008 Managed an overall staff of 3 employees with 1 per shift for 24/7 support of site and customer.
• Developed and implemented a WIP Cycle Count process that improved WIP inventory accuracy from below 50% to an average of 98% • Implemented WIP KanBans based on customer demand, MPS and supplier packaging methods that increased inventory turns from below 10 to in excess of 25 • Worked with 1 Sr. Buyer/Planner to convert offshore supplier to onsite Vendor Managed inventory reducing overall inventory by $1M • Lean Champion for the Materials Department and implemented 5S and Value Stream Mapping with resulting 50% reduction in loss time accidents and reduced overhead requirements for non-value added work
LeeMAH ELECTRONICS San Francisco, CA 2000 – 2004
Cost Control Manager 2003 - 2004 Managed Quotation, Cost Control, Order Management, Planning and an overall staff of 12 employees.
• Developed and implemented with 1 Sr. Programmer a Quotation program that would automatically load the RFQ accepted per PO into the ERP system for BOM, costs and demand reducing data entry content by 75%
Senior Master Production Planner 2000 – 2003 Provided Demand, Capacity and Production Planning support to multiple plant locations in CA, TX and China.
• Master Scheduler, Demand Planning, Master Production Schedules, Order Management and Capacity Planning for CA, TX and China locations • Managed incoming order compliance to contract • Data management and extractions from Oracle using Brio to Excel for analysis
CASHMERE MANUFACTURING Wenatchee, WA 1997 – 2000 • PIC Supervisor 1999 – 2000 • Senior Capacity Planner 1997 – 1999
HUMPHREY INSTRUMENTS San Leandro, CA 1987 – 1997 • Manger of Manufacturing 1996 – 1997 • Production Supervisor 1992 – 1996 • Senior Demand Planner 1987 – 1992
UNITRONICS Tucson, AZ 1979 – 1987 • Operations Manager 1986 – 1987 • Manager of Manufacturing 1985 – 1986 • Production Supervisor 1982 – 1985 • Senior Materials Planner 1979 – 1982
EDUCATION ========== Associate Degree Chabot College Hayward, CA
SKILLS / CERTIFICATIONS ====================== SYSTEMS: MRP/ERP, Agile, Lotus Notes, Microsoft Suites, Microsoft Projects, Visio, Oracle, BAAN, PowerCerv, ASK, Report Generators, E2 ShopTech, BRIO Query, QAD, JobBoss CERTIFICATIONS: APICS JIT, JCIT Lean, FDA, GMP, ISO, TS, Internal Compliance Auditor, JCIT Value Stream MATERIALS: Excess/Obsolete, New Product Introduction, End of Life, Warehouse Mgmt, Master Scheduler, Spares Scheduler, Capacity Planning, Resource Planning, Production Planning, Materials Planning
COMMUNITY SERVICE ================== Community Outreach Program for the Deaf
|
|
Similar ResumesProject Controls Engineer / Sr. Planner / Lead Scheduler
Bellflower City, CA
- planner scheduler, improvement project, cn, wbs,...Project Controls Manager, Master Scheduler, Lead Planner
Glendale, CA
- petrochem, gmbh, evms, controls engineer, sulfur,...Schedule Coordinator/Office Manager
Jacksonville, FL
- occupational therapist, therapist, caregivers,...Master Scheduler/Planner
Tarpon Springs, FL
- jdedwards, scheduler, quality improvement,...Solutions Architect
United States
- solutions architect, ucm, ccie, qip, tacacs, aux,...Receptionist/Surgery Scheduler
Stratford, CT
- billers, perm, underwriter, shelton, surgeons,...Program Manager / Scheduling Manager / Supervisor
Canada, ON
- moulds, mould, epicor, cnc, estimator, boring, aed,...Production Scheduler
Miami, FL
- tinter, production scheduler, scheduler, jesus,...Production Planner or Production Supervisor
Oakley, CA
- quartz, production line, deaf, smt, ts, rfq,...Project Planning and Scheduling Supervisor / Manager
TX
- modu, hercules, p6, plant maintenance, cmms, pulp,...
|