ResumeLogin
Search for: Jobs   Resumes
Keywords or title City, state or zip code

Metallurgy Engineering, Technology Process Group

Post a job
Country: India
State: Maharashtra
City: Pune
Postal Index: 411014
Salary: 60000
Posted date: 5/11/2011   all resumes
Email: oittgk@r.postjobfree.com
Contact Info: ****************@*****.***
Show Full Resume Send Message Free
Email me new resumes like this


Email
Resume Text:


Pol Rupesh Shivaji
Male, ** years +************ +919970501338 | 965******* oittgk@r.postjobfree.com
ACADAMIC RECORD
M.Tech Process Engineer
(Metallurgy Engg. & Materials Sci.) Indian Institute of technology (IIT), Bombay
• Ranked in top 20% of the batched 2009
B.Tech
(Metallurgy Engg.) Government College of Engineering (COEP), Pune
2007
ACHIVEMENT
• Selected for Maharashtra Public Service Commission’s year 2010
• Recipient of MHRD Scholarship awarded to get qualifiers, 2007-2009
• All India Rank 87 in GATE exam, 2007
CORE COMPETENCIES
• Physical metallurgy
• Mechanical testing & NDT • Steel making
• Competitive analysis • Casting and solidification
• Heat treatment
PROFESSIONAL EXPERIENCE
Sr. Executive, Process Control (Quality Assurance department), ISMT Ltd., Jejuri 2 years-present
Process Control & Technical Process Group(TPG) • Live Process Audit / Product audit and continuous improvement
• Daily & Monthly production quality & Inspection performance report (Reports to CEO & COO )
• Analysis for customer complaints
• Continuous improvement, SPC, and CAPA
• Defective sample analysis in ARAI analysis facility
• Process audit Directly Reporting to EVP(Q) quality (Corporate Head of Quality, EVP(W),
COO)
• Mechanical testing, metallographic lab & NDT (ECT, MPI, Ultrasonic test, Pickling and Spark and spectro)
• Quality meeting weekly (all AVP from operation)
• All AVP operation consult regarding work instruction
• Knowledge of ISO/TS-16949-2009 certification
• Feasibility studies of customer & set Quality planning Process for Steel making and rolling
• Presentation on topic as customer complaint and avoid process deviation take corrective action
• Preparation of Daily Non-Conformance report to avoid repetition of abnormalities in product.
• Manpower work allocation (utilization), Integration with various departments
Key Performance Area:
• Control on continuous casting machine problem for quality and smooth working
• Controlled Inclusion in steel by set steel making process
• Successfully done project for reduce banding structure in steel
• Hot Rolling surface defect analysis and set process for reduced the surface and internal defects
• Reduction of LNC, TNC & Choking, Porosity in heats
Process going through following path:
EAF, LRF, VD, VOD (commissioning of installation), Continuous Casting Machine, Rolling Mill, value addition treatment(process), Metallurgical testing & mechanical testing related steel quality
TEACHING EXPERIENCE
Visiting Faculty in Pune Vidyarathy Graha college of Engineering and Technology

ACADEMIC AND RESEARCH PROJECT

M. Tech
Project
(major)
Dynamic modeling of Electric Arc Furnace (EAF) 2008-2009
EAF used for recycling the scrap using chemical and electrical energy. We can achieve desired grade of steel, by applying different chemical composition. In this modeling project I used various modeling parameters such as melting scrap at different mass, temperature, time, and composition. The whole process is depends on lancing Oxygen, Carbone, Lime and chemical reactions. Modeling is done by considering the Kinetics and Thermodynamics principals. Duration: 1 year and 6 month
M. Tech Seminar topic Automotive application of Magnesium alloy. 2008
Useful in Automotive parts, it has low weight to high strength ratio.
Duration: 6 month
M. Tech course Project Modeling on Rate of slag reduction with natural gas in Electric Arc Furnace
Model developed by using the Fortran language 2008
Duration: 6 month
B. Tech.
Project Hardness and microstructure studies on dissimilar metal welding by TIG process (EN-24 and AISI 316L ) collaborate work with COEP, Vinarc Engg. & Govt M/S Highly Explosive Material Research Laboratory (2006 – 2007)
In this project we analyze and Removed the fracture of EN-24 component after welding process, which are used in missile, the three EN-24 adapter cylindrical place in vessel of AISI 316L SS plate and welded by TIG process. Duration: 1 year and 6 month
Third Year B. Tech. Project Fabrication of dilatometer 2006
measuring linear coefficient of expansion Duration: 6 month
COMPUTER LITERATURE
• Language : C, Mat Lab, FORTRAN
• Operating System : Windows, Linux , XP, Vista
EXTRA CURRICULAR ACHIEVEMENT
• Participate in state level kayaking championship 2006
• Second prize in Pune Mayor Trophy in 12th Standard for science exhibition, 1998 – 1999
• Participate district level for inter school computation in 12th Standard for science exhibition 1998–1999
• Participated in poster presentation in National Material research conference 2009
EXTRA CURRICULAR ACTIVITIES
• I took part in Asian Tsunami (26 December, 2004) relief camp
• I have organizer for blood donation companying 2004
• Organized group events like Industrial Tours during under graduation
• Organizer in National Material research conference 2009



©2013  PostJobFree.com - Home - Latest Resumes - Free job posting - Update or Delete my resume