Civil/Construction Project Management

Key Qualifications

Senior Project Manager / Construction and Project Manager with over 27

years of experience working with municipal, commercial, private developers,

and residential clients with an emphasis on Heavy Civil/Structural, Water

Wastewater, Water Resources Engineering projects.

Objective

To offer a unique combination of Project Management and leadership

experience within the Engineering/Construction profession, while providing

strategic solutions toward company and client relationship. Ability to

deliver innovating ideas that fully support corporate structure and

growth. Competently juggled multiple assignments while maintaining the

highest emphasis on quality assurance.

Experience

05/2012 to 03/2013 Washington Metro Area Transit Authorities, Washington,

D.C. Construction

Engineer for Rail and Infrastructure Projects throughout the DMV area.

Over saw the construction and Management to for new and rehab projects.

Review submittals, RFI's. Managed Construction Facilitators, Inspectors,

Consultants, and Contractors

02/2011 to 03/2012 EBA ENGINEERING Baltimore, MD

Senior Construction Project Manager for Inspections

Client: Howard County DPW

Oversee various land development utility projects for new water, sewer,

storm drains, inlets, manholes, house connections S&E Storm Water

Management projects. Managed inspections for Water Treatment Facility

renovation projects at Montebello and Towson reservoir. Review permits,

contractor's invoices, RFI's, PCO's and change orders and make

recommendations on behalf of the client. Daily inspection of work in

progress as well as inspection to site surroundings. Review submittals and

material inspections of approved materials for repair or replacement. Day

to day execution of all aspects of projects assigned to various inspectors

to develop fully integrated project schedules that include both

construction and engineering. Update the schedule as required. Develop

subcontractor packages and manage the contractors and their

subcontractors. Develop and maintain cost report and project forecasts.

Develop monthly client invoices and approve vendor invoices while

coordinating issue's of RFPs and tracking vendor responses. Coordinate

vendor submittals, and expedite submittals as required. Maintain project

meeting minutes and transmit to all parties as required. Generate required

project documentation as per the documentation requirements. Assist

management with proposals and construction issues. Facilitate meetings

with contractors, subcontractor city or state officials to help resolve

construction issues. Assist in project start-ups. Managed and Inspected

New Bio Filter unit at Annapolis Water Reclamation Facility. Provided

QA/QC standards.

8/2009 to 05/2010 SABRA, WANG & ASSOCIATES Baltimore, MD

Construction Project Manager

Client: City of Baltimore DPW, DOT Engineering and Construction Division

Plan, direct, and administer the overall activities for construction

operations. Manage subordinate personnel and engaged in the construction

management and inspection of new water, wastewater main and lateral

installation, sewer, lateral connections and water main rehabilitation or

replacement and paving restoration. Perform liaison activities as the

contracting officer representative including reviewing and approving

estimates and change orders for payment on construction projects, sitting

on various committees and task forces representing the engineering and

construction management. Oversaw contractor's responsibility program,

preparing and monitoring the annual operating budget of the construction

group as well as providing coaching, consultation and support to

subordinate personnel. Work to establish policies and procedures that

define the work processes of the group. Served as acting chief of

engineering and construction when so designated.

05/2008 - 05/2009 MEDINA CONSULTANTS Baltimore, MD

Senior Construction Project Manager

Client: City of Baltimore DPW, Engineering and Construction Division

Managed and supervised the Baltimore division of Medina Consultants, which

included three project managers who performed hydraulic and design reviews

for proposed water and/or sewer main extensions to proposed developments.

Oversaw the development and enhancement of the development services

tracking system. Monitored project quality, system integrity, cycle time

and cost. Participated in the setting of performance standards then

collected data to measure performance, compared results with standards and

took corrective action to close performance gaps. Approved letters of

findings and signed design plans. Monitored and assisted in the

development of project managers. Coordinated with developers and engineers

to foster the upgrade and quality of their water/sewer work. Reviewed

conceptual water and sewer layouts and provided preliminary comments to

applicants and county planning officials.

12/2006 - 05/2008 DEVELOPMENT FACILITATORS INCORPORATED/WSSC Silver

Spring, MD

Construction Project Manager for Inspections

Managed inspections of pipeline projects. Negotiated contracts and change

orders. Prepared scope of work and a bar chart schedule for each project.

Reviewed and approved payments for contracts; developed and implemented

cost control system. Reviewed plans and specifications for conformance to

company standards, specifications and contractual agreements. Coordinated

the review of shop drawings submitted by contractors and responded to

contractor design related questions during construction. Presented project

information at public meetings and civic association meeting. Involved in

multiple water wastewater projects throughout Montgomery and Prince George

Counties.

10/03-12/2006 GLYNDON ENGINEERING & TECHNOLOGIES Towson, MD

Ashburton Filtration Plant

Construction Project Manager

Provided onsite engineering and construction management for the

rehabilitation and replacement of plant filters, filter control tables,

instrumentation, and wash water piping & valves. Oversaw the construction

of a new grounds maintenance building which included paving, storm drain,

electrical and mechanical aspects throughout out the entire facility.

Provided recommendations to GC while monitoring change orders, RFI's,

submittals, construction claims and recommended design changes from

original contract drawings with the architects approval due to unforeseen

field conditions. Provided trench design changes due to unforeseen

underground utility obstruction. Managed and conducted inspections to the

Water Treatment Rehabilitation of existing filter cells, repairs to

concrete filter cells, Toughs, floor slabs, walkways, replacing the filter

equipment and media. Also managed and inspections to the replacement of

filter control tables, instrumentation, wash water piping, valves,

influent / effluent piping and valves, installation of air scour blowers,

piping, and valves. Replacement or rehabilitation of chemical feed

systems, alum, polymer, flouride, and lime. Managed and inspected the

construction of new facilities for potassium permanganate e/

dechlorination. Rehabilitation/Replacement of sluice gates and stop

plates. Upgrade of and rehabilitation of front / rear lobbies, main

corridor, and second floor office space to conform to International

Building Code and American Disabilities Act. Managed Replacement of

existing roofing system. Inspected the removal of lead paint and asbestos

abatement. Replacement of doors and windows. Oversaw the demolition of the

existing residence and construction of a new grounds maintenance building.

Renovation of the HVAC Systems throughout the facility. Replacement of the

electrical service wiring and instrumentation and controls throughout the

plant. Installation of new fencing around the perimeter of the plant

facility. Managed the improvements to the paving, stormdrain and site

utilities. Negotiated contractors proposed change order amounts to protect

the client's interests. Provided construction management and QA/QC for

maintenance and operations in underground utilities. Provided all aspects

of engineering management for manholes, conduits and various utilities

systems to support power distribution, signal controls, communications,

street lighting and other applications. Also provided planning,

scheduling, construction claims and dispute. Review construction

documents: RFI's, Submittals, Change Orders, PCO's and Proposals. Prepared

monthly reports documenting activities and progress

05/00-09/03 WHITING-TURNER/JV GLYNDON ENGINEERING Baltimore, MD

Construction Project Manager/

Baltimore City Public School #410 Renovation

Performed on site management for electrical, mechanical, HVAC systems,

plumbing, and structural components for load bearing conditions. along

with site work which included a new athletic sports arena which included

excavation, drainage, lighting and all other utilizes. Use of computer

software to include Meridian Prolog and Expedition P3 (Project Schedules)

Reviewed contract drawings and specifications as required, answered RFI's,

Change Orders and Submittals and construction clams review. Recommended

design changes from original contract drawings with the Architects

approval, due to unforeseen field conditions or omission. Negotiated

contractors proposed change order amounts, due to excessive billing

amounts. Worked closely with BCPSS Reps., Project Manager, Architects,

Engineers and Contractors. Applied engineering calculation for New

Athletic Sports arena to include the following utilities: Sewer/Storm

Drainage, Water & Wastewater resources, electrical lighting and concrete

pad for grand stand seating.

06/83-04/00 SHEPPARDS CONTRACTING COMPANY Baltimore, MD.

Construction Manager

Provided design review input to project managers on water and sewer main

alignments that minimized impacts on stream channels, floodplains and

non-tidal wetlands. Instructed personnel in the field on how to correctly

implement sediment control measures and adequately protect exposed

sanitary sewer and manholes. Performed engineering review and analysis of

complex hydrologic and hydraulic models prepared for waterway construction

projects.

Reviewed waterway construction permit applications for compliance with

State water resources law, regulations, policies and procedures. Conducted

meetings with applicants, consultants and county officials to discuss

permit requirements and hydrologic and hydraulic analyses. Provided

engineering inspections to Back river and Patapsco Treatment Facilities.

Software

MS Projects, Primavera, Prolog, Contract Manager and Timberline

Education

BS, Civil Engineering

Clark Atlanta University, 1983

Master's Degree, Engineering Management

The University Of Tennessee, 2009

Additional Project Information

EBA Engineering, Senior Construction Manager for Inspections, (2011 - 2011)

Annapolis Water Reclamation Facility, City of Annapolis, Md.

6 MGD

Provided onsite Construction Management and inspections of a New Installed

Odor Control Biofiltration System, t was designed to deliver significant,

environmentally benefits for wastewater pumping stations, wastewater

treatment works, sludge-handling, municipal solid waste and composting

centre's. The system is designed for various industrial facilities

requiring Odor and VOC removal. The objective of this project was to

provide a controlled high levels of hydrogen sulfide (H2S) gas in order to

improve working conditions inside the of the new installed Odor Control

System.

EBA Engineering, Senior Construction Manager for Inspections, Montebello

Filtration Plane, City of Baltimore, Md

180 MGD

Provided Construction Management and Inspections for the rehabilitation of

7 Filter Cells. Provided design and layout of existing Filter Cells and

Troughs that have experienced spalling, cracks and other damage due to

years of decay. Provided quantities of damage to the City of Baltimore as a

guide for future cost to other filter cells.

EBA Engineering, Senior Construction Manager for Inspections, Towson

Reservoir, Baltimore, Md.

16 MG

Provided Construction Management and Inspections for the removal of

existing 36" inch Watermain and Vault from outside roadway going into plant

reservoir, that was replaced with a new 54" inch Watermain and Vault.

Glyndon Engineering & Technologies, Construction Manager, Ashburton

Filtration Plant, City of Baltimore, Md.

Volume of Storage - 534 Million Gallons Provided onsite Engineering and

Construction Management for the rehabilitation and replacement of plant

filters, filter control tables, instrumentation, and wash water piping &

valves. Oversaw the construction of a new grounds maintenance building

which included paving, storm drain, electrical and mechanical aspects

throughout out the entire facility. Provided recommendations to GC while

monitoring change orders, RFI's, submittals, construction claims and

recommended design changes from original contract drawings with the

architects approval due to unforeseen field conditions. Provided trench

design changes due to unforeseen underground utility obstruction. Managed

and conducted inspections to the Water Treatment Rehabilitation of

existing filter cells, repairs to concrete filter cells, Toughs, floor

slabs, walkways, replacing the filter equipment and media. Also managed

and inspections to the replacement of filter control tables,

instrumentation, wash water piping, valves, influent / effluent piping and

valves, installation of air scour blowers, piping, and valves. Replacement

or rehabilitation of chemical feed systems, alum, polymer, flouride, and

lime. Managed and inspected the construction of new facilities for

potassium permanganate e/ dechlorination. Rehabilitation/Replacement of

sluice gates and stop plates. Upgrade of and rehabilitation of front /

rear lobbies, main corridor, and second floor office space to conform to

International Building Code and American Disabilities Act

Glyndon Engineering & Technologies, Construction Management & Inspection,

Patapsco Wastewater Treatment Plant, City of Baltimore, Md.

Managed construction activities that included: upgrades of existing primary

and secondary unit processes, including oxygen aeration reactors, secondary

clarifiers, primary settling tanks, primary sludge pumping stations, fine

screens, and chemical feed systems. Ancillary activities included power

distribution, yard piping, building construction, and ABB Process Controls

System.

Sheppard's Contracting, Aberdeen Water Treatment Facility, City of Aberdeen

Maryland, Upgrades to existing plant, 4.0 MG, primary treatment

facilities, New influent flow equalization system Enhanced process flow

split between primary and secondary facilities, Upgraded secondary

treatment facilities, New tertiary treatment facility, Improved effluent

disinfection system, New and upgraded chemical treatment systems, Influent

Sewer Realignment, Main Pumping Station Modifications, New Flow

Equalization Tanks and Pumping Station, New Grit Removal System Blowers,

New PE/RAS Distribution Box, Biological Treatment Reactors Nos. 1-4

Modifications, Final Clarifiers Nos. 1-4 Modifications, New Continuously

Backwashing Upflow Denitrification Filters, New Ultra-Violet Disinfection

System, Plant Process Water Pumping Station Modifications, New Sodium

Hydroxide, Polyaluminum Chloride, Phosphoric Acid, and Methanol Storage and

Feed Facilities, New Process Control System

Sheppards Contracting, Construction Manager, Patapsco WastewaterTreatment

Plant, City of Baltimore, Md.

73 to 81 MGD, Construction Management and inspections for the renovation

of two of the existing Gravity Sludge Thickeners, and modifications to the

third Gravity Sludge Thickener. Construction included, 65-foot Diameter

Gravity Sludge Thickener Mechanism, concrete repair, launder covers for

Odor Control, Thickened Sludge Pumps, Primary Sludge Grinders, Sump Pumps,

Scum Pump, Seal Water Break Tank System, Miscellaneous Architectural and

site improvements.

Sheppards Contracting, Construction Manager, Back River Treatment Facility,

City of Baltimore, Md.

180 MGD, Construction Management and Inspections for the Rehabilitation of

activated two plant secondary clarifiers 5A through 10B, Including

compaction grouting, replacement of clarifier drives and equipment.

Replacement of sludge suction headers, replacement of stilling wells With

EDIs and new battles, Removal ff the inboard weirs and troughs, Replacement

of the scum battles and outboards weirs with new fiberglass battles and

weir plates. Extension of skimmer blades, new extended scum and skimmer

blades and associated structural steel, concrete repair, coatings,

electrical modification and instrumental, and site improvements.

Sheppards Contracting, Construction Manager, Back River Treatment Facility,

City of Baltimore, Md., Construction Management and Inspections for Six

(6) gravity sludge thickeners, Modifications to two (2) thickened sludge

holding tanks, Addition of a third floor to a digester control building to

house seven sludge cleaners, Rehabilitation of the raw sludge wet well,

Installation of a redundant deaerator tank for the digester boiler system

and other miscellaneous building improvements, This project also includes

removal of dome covers, concrete tank repair and coating, mechanism and

drive replacement, launder covers, flat covers, weir replacement, scum pump

replacement, scum pit renovations, scum pit mixers, scum blanket detectors,

complete site work, plumbing work, mechanical work and electrical work

Sheppard Contracting, Abingdon Water Treatment Plant Expansion, Abingdon,

MD, Expansion of the existing facility from 40 to 50 MGD

Sheppard Contracting, IDC for Improvements at Blue Plains WWTP, Washington

Suburban Sanitary Commission, Construction management and Inspections Civil

and structural engineering services associated with new construction or

improvements to existing industrial facilities, utilities and systems for

plant upgrades.

Sheppard Contracting, Piscataway Wastewater Treatment Plant, Washington

Suburban Sanitary Commission, Construction management and inspections for,

Civil, structural, cost estimating and construction management services for

upgrades.

Sheppard Contracting, Biological Nutrient Removal Facility Parkway WWTP,

Washington Suburban Sanitary Commission, Largo, MD. Construction management

and Inspections for Phase III, 7.5 MGD.