Resume
Sign in

Project Manager Construction

Location:
Baltimore, Maryland, 21244, United States
Posted:
April 05, 2013
Email:
abq0ii@r.postjobfree.com
Contact Info:
******@***.***


ANtoine r.foy

**** ********* **** **
Windsor Mill, Maryland 21244
443.***.****
Email: abq0ii@r.postjobfree.com

Civil/Construction Project Management
Key Qualifications
Senior Project Manager / Construction and Project Manager with over 27
years of experience working with municipal, commercial, private developers,
and residential clients with an emphasis on Heavy Civil/Structural, Water
Wastewater, Water Resources Engineering projects.

Objective
To offer a unique combination of Project Management and leadership
experience within the Engineering/Construction profession, while providing
strategic solutions toward company and client relationship. Ability to
deliver innovating ideas that fully support corporate structure and
growth. Competently juggled multiple assignments while maintaining the
highest emphasis on quality assurance.
Experience

05/2012 to 03/2013 Washington Metro Area Transit Authorities, Washington,
D.C. Construction
Engineer for Rail and Infrastructure Projects throughout the DMV area.
Over saw the construction and Management to for new and rehab projects.
Review submittals, RFI's. Managed Construction Facilitators, Inspectors,
Consultants, and Contractors

02/2011 to 03/2012 EBA ENGINEERING Baltimore, MD
Senior Construction Project Manager for Inspections
Client: Howard County DPW
Oversee various land development utility projects for new water, sewer,
storm drains, inlets, manholes, house connections S&E Storm Water
Management projects. Managed inspections for Water Treatment Facility
renovation projects at Montebello and Towson reservoir. Review permits,
contractor's invoices, RFI's, PCO's and change orders and make
recommendations on behalf of the client. Daily inspection of work in
progress as well as inspection to site surroundings. Review submittals and
material inspections of approved materials for repair or replacement. Day
to day execution of all aspects of projects assigned to various inspectors
to develop fully integrated project schedules that include both
construction and engineering. Update the schedule as required. Develop
subcontractor packages and manage the contractors and their
subcontractors. Develop and maintain cost report and project forecasts.
Develop monthly client invoices and approve vendor invoices while
coordinating issue's of RFPs and tracking vendor responses. Coordinate
vendor submittals, and expedite submittals as required. Maintain project
meeting minutes and transmit to all parties as required. Generate required
project documentation as per the documentation requirements. Assist
management with proposals and construction issues. Facilitate meetings
with contractors, subcontractor city or state officials to help resolve
construction issues. Assist in project start-ups. Managed and Inspected
New Bio Filter unit at Annapolis Water Reclamation Facility. Provided
QA/QC standards.

8/2009 to 05/2010 SABRA, WANG & ASSOCIATES Baltimore, MD
Construction Project Manager
Client: City of Baltimore DPW, DOT Engineering and Construction Division
Plan, direct, and administer the overall activities for construction
operations. Manage subordinate personnel and engaged in the construction
management and inspection of new water, wastewater main and lateral
installation, sewer, lateral connections and water main rehabilitation or
replacement and paving restoration. Perform liaison activities as the
contracting officer representative including reviewing and approving
estimates and change orders for payment on construction projects, sitting
on various committees and task forces representing the engineering and
construction management. Oversaw contractor's responsibility program,
preparing and monitoring the annual operating budget of the construction
group as well as providing coaching, consultation and support to
subordinate personnel. Work to establish policies and procedures that
define the work processes of the group. Served as acting chief of
engineering and construction when so designated.

05/2008 - 05/2009 MEDINA CONSULTANTS Baltimore, MD
Senior Construction Project Manager
Client: City of Baltimore DPW, Engineering and Construction Division
Managed and supervised the Baltimore division of Medina Consultants, which
included three project managers who performed hydraulic and design reviews
for proposed water and/or sewer main extensions to proposed developments.
Oversaw the development and enhancement of the development services
tracking system. Monitored project quality, system integrity, cycle time
and cost. Participated in the setting of performance standards then
collected data to measure performance, compared results with standards and
took corrective action to close performance gaps. Approved letters of
findings and signed design plans. Monitored and assisted in the
development of project managers. Coordinated with developers and engineers
to foster the upgrade and quality of their water/sewer work. Reviewed
conceptual water and sewer layouts and provided preliminary comments to
applicants and county planning officials.

12/2006 - 05/2008 DEVELOPMENT FACILITATORS INCORPORATED/WSSC Silver
Spring, MD
Construction Project Manager for Inspections
Managed inspections of pipeline projects. Negotiated contracts and change
orders. Prepared scope of work and a bar chart schedule for each project.
Reviewed and approved payments for contracts; developed and implemented
cost control system. Reviewed plans and specifications for conformance to
company standards, specifications and contractual agreements. Coordinated
the review of shop drawings submitted by contractors and responded to
contractor design related questions during construction. Presented project
information at public meetings and civic association meeting. Involved in
multiple water wastewater projects throughout Montgomery and Prince George
Counties.
10/03-12/2006 GLYNDON ENGINEERING & TECHNOLOGIES Towson, MD
Ashburton Filtration Plant
Construction Project Manager
Provided onsite engineering and construction management for the
rehabilitation and replacement of plant filters, filter control tables,
instrumentation, and wash water piping & valves. Oversaw the construction
of a new grounds maintenance building which included paving, storm drain,
electrical and mechanical aspects throughout out the entire facility.
Provided recommendations to GC while monitoring change orders, RFI's,
submittals, construction claims and recommended design changes from
original contract drawings with the architects approval due to unforeseen
field conditions. Provided trench design changes due to unforeseen
underground utility obstruction. Managed and conducted inspections to the
Water Treatment Rehabilitation of existing filter cells, repairs to
concrete filter cells, Toughs, floor slabs, walkways, replacing the filter
equipment and media. Also managed and inspections to the replacement of
filter control tables, instrumentation, wash water piping, valves,
influent / effluent piping and valves, installation of air scour blowers,
piping, and valves. Replacement or rehabilitation of chemical feed
systems, alum, polymer, flouride, and lime. Managed and inspected the
construction of new facilities for potassium permanganate e/
dechlorination. Rehabilitation/Replacement of sluice gates and stop
plates. Upgrade of and rehabilitation of front / rear lobbies, main
corridor, and second floor office space to conform to International
Building Code and American Disabilities Act. Managed Replacement of
existing roofing system. Inspected the removal of lead paint and asbestos
abatement. Replacement of doors and windows. Oversaw the demolition of the
existing residence and construction of a new grounds maintenance building.
Renovation of the HVAC Systems throughout the facility. Replacement of the
electrical service wiring and instrumentation and controls throughout the
plant. Installation of new fencing around the perimeter of the plant
facility. Managed the improvements to the paving, stormdrain and site
utilities. Negotiated contractors proposed change order amounts to protect
the client's interests. Provided construction management and QA/QC for
maintenance and operations in underground utilities. Provided all aspects
of engineering management for manholes, conduits and various utilities
systems to support power distribution, signal controls, communications,
street lighting and other applications. Also provided planning,
scheduling, construction claims and dispute. Review construction
documents: RFI's, Submittals, Change Orders, PCO's and Proposals. Prepared
monthly reports documenting activities and progress

05/00-09/03 WHITING-TURNER/JV GLYNDON ENGINEERING Baltimore, MD
Construction Project Manager/
Baltimore City Public School #410 Renovation
Performed on site management for electrical, mechanical, HVAC systems,
plumbing, and structural components for load bearing conditions. along
with site work which included a new athletic sports arena which included
excavation, drainage, lighting and all other utilizes. Use of computer
software to include Meridian Prolog and Expedition P3 (Project Schedules)
Reviewed contract drawings and specifications as required, answered RFI's,
Change Orders and Submittals and construction clams review. Recommended
design changes from original contract drawings with the Architects
approval, due to unforeseen field conditions or omission. Negotiated
contractors proposed change order amounts, due to excessive billing
amounts. Worked closely with BCPSS Reps., Project Manager, Architects,
Engineers and Contractors. Applied engineering calculation for New
Athletic Sports arena to include the following utilities: Sewer/Storm
Drainage, Water & Wastewater resources, electrical lighting and concrete
pad for grand stand seating.

06/83-04/00 SHEPPARDS CONTRACTING COMPANY Baltimore, MD.
Construction Manager
Provided design review input to project managers on water and sewer main
alignments that minimized impacts on stream channels, floodplains and
non-tidal wetlands. Instructed personnel in the field on how to correctly
implement sediment control measures and adequately protect exposed
sanitary sewer and manholes. Performed engineering review and analysis of
complex hydrologic and hydraulic models prepared for waterway construction
projects.
Reviewed waterway construction permit applications for compliance with
State water resources law, regulations, policies and procedures. Conducted
meetings with applicants, consultants and county officials to discuss
permit requirements and hydrologic and hydraulic analyses. Provided
engineering inspections to Back river and Patapsco Treatment Facilities.

Software
MS Projects, Primavera, Prolog, Contract Manager and Timberline
Education
BS, Civil Engineering
Clark Atlanta University, 1983

Master's Degree, Engineering Management
The University Of Tennessee, 2009

Additional Project Information

EBA Engineering, Senior Construction Manager for Inspections, (2011 - 2011)
Annapolis Water Reclamation Facility, City of Annapolis, Md.
6 MGD
Provided onsite Construction Management and inspections of a New Installed
Odor Control Biofiltration System, t was designed to deliver significant,
environmentally benefits for wastewater pumping stations, wastewater
treatment works, sludge-handling, municipal solid waste and composting
centre's. The system is designed for various industrial facilities
requiring Odor and VOC removal. The objective of this project was to
provide a controlled high levels of hydrogen sulfide (H2S) gas in order to
improve working conditions inside the of the new installed Odor Control
System.

EBA Engineering, Senior Construction Manager for Inspections, Montebello
Filtration Plane, City of Baltimore, Md
180 MGD
Provided Construction Management and Inspections for the rehabilitation of
7 Filter Cells. Provided design and layout of existing Filter Cells and
Troughs that have experienced spalling, cracks and other damage due to
years of decay. Provided quantities of damage to the City of Baltimore as a
guide for future cost to other filter cells.

EBA Engineering, Senior Construction Manager for Inspections, Towson
Reservoir, Baltimore, Md.
16 MG
Provided Construction Management and Inspections for the removal of
existing 36" inch Watermain and Vault from outside roadway going into plant
reservoir, that was replaced with a new 54" inch Watermain and Vault.

Glyndon Engineering & Technologies, Construction Manager, Ashburton
Filtration Plant, City of Baltimore, Md.
Volume of Storage - 534 Million Gallons Provided onsite Engineering and
Construction Management for the rehabilitation and replacement of plant
filters, filter control tables, instrumentation, and wash water piping &
valves. Oversaw the construction of a new grounds maintenance building
which included paving, storm drain, electrical and mechanical aspects
throughout out the entire facility. Provided recommendations to GC while
monitoring change orders, RFI's, submittals, construction claims and
recommended design changes from original contract drawings with the
architects approval due to unforeseen field conditions. Provided trench
design changes due to unforeseen underground utility obstruction. Managed
and conducted inspections to the Water Treatment Rehabilitation of
existing filter cells, repairs to concrete filter cells, Toughs, floor
slabs, walkways, replacing the filter equipment and media. Also managed
and inspections to the replacement of filter control tables,
instrumentation, wash water piping, valves, influent / effluent piping and
valves, installation of air scour blowers, piping, and valves. Replacement
or rehabilitation of chemical feed systems, alum, polymer, flouride, and
lime. Managed and inspected the construction of new facilities for
potassium permanganate e/ dechlorination. Rehabilitation/Replacement of
sluice gates and stop plates. Upgrade of and rehabilitation of front /
rear lobbies, main corridor, and second floor office space to conform to
International Building Code and American Disabilities Act

Glyndon Engineering & Technologies, Construction Management & Inspection,
Patapsco Wastewater Treatment Plant, City of Baltimore, Md.
Managed construction activities that included: upgrades of existing primary
and secondary unit processes, including oxygen aeration reactors, secondary
clarifiers, primary settling tanks, primary sludge pumping stations, fine
screens, and chemical feed systems. Ancillary activities included power
distribution, yard piping, building construction, and ABB Process Controls
System.

Sheppard's Contracting, Aberdeen Water Treatment Facility, City of Aberdeen
Maryland, Upgrades to existing plant, 4.0 MG, primary treatment
facilities, New influent flow equalization system Enhanced process flow
split between primary and secondary facilities, Upgraded secondary
treatment facilities, New tertiary treatment facility, Improved effluent
disinfection system, New and upgraded chemical treatment systems, Influent
Sewer Realignment, Main Pumping Station Modifications, New Flow
Equalization Tanks and Pumping Station, New Grit Removal System Blowers,
New PE/RAS Distribution Box, Biological Treatment Reactors Nos. 1-4
Modifications, Final Clarifiers Nos. 1-4 Modifications, New Continuously
Backwashing Upflow Denitrification Filters, New Ultra-Violet Disinfection
System, Plant Process Water Pumping Station Modifications, New Sodium
Hydroxide, Polyaluminum Chloride, Phosphoric Acid, and Methanol Storage and
Feed Facilities, New Process Control System

Sheppards Contracting, Construction Manager, Patapsco WastewaterTreatment
Plant, City of Baltimore, Md.
73 to 81 MGD, Construction Management and inspections for the renovation
of two of the existing Gravity Sludge Thickeners, and modifications to the
third Gravity Sludge Thickener. Construction included, 65-foot Diameter
Gravity Sludge Thickener Mechanism, concrete repair, launder covers for
Odor Control, Thickened Sludge Pumps, Primary Sludge Grinders, Sump Pumps,
Scum Pump, Seal Water Break Tank System, Miscellaneous Architectural and
site improvements.

Sheppards Contracting, Construction Manager, Back River Treatment Facility,
City of Baltimore, Md.
180 MGD, Construction Management and Inspections for the Rehabilitation of
activated two plant secondary clarifiers 5A through 10B, Including
compaction grouting, replacement of clarifier drives and equipment.
Replacement of sludge suction headers, replacement of stilling wells With
EDIs and new battles, Removal ff the inboard weirs and troughs, Replacement
of the scum battles and outboards weirs with new fiberglass battles and
weir plates. Extension of skimmer blades, new extended scum and skimmer
blades and associated structural steel, concrete repair, coatings,
electrical modification and instrumental, and site improvements.
Sheppards Contracting, Construction Manager, Back River Treatment Facility,
City of Baltimore, Md., Construction Management and Inspections for Six
(6) gravity sludge thickeners, Modifications to two (2) thickened sludge
holding tanks, Addition of a third floor to a digester control building to
house seven sludge cleaners, Rehabilitation of the raw sludge wet well,
Installation of a redundant deaerator tank for the digester boiler system
and other miscellaneous building improvements, This project also includes
removal of dome covers, concrete tank repair and coating, mechanism and
drive replacement, launder covers, flat covers, weir replacement, scum pump
replacement, scum pit renovations, scum pit mixers, scum blanket detectors,
complete site work, plumbing work, mechanical work and electrical work

Sheppard Contracting, Abingdon Water Treatment Plant Expansion, Abingdon,
MD, Expansion of the existing facility from 40 to 50 MGD
Sheppard Contracting, IDC for Improvements at Blue Plains WWTP, Washington
Suburban Sanitary Commission, Construction management and Inspections Civil
and structural engineering services associated with new construction or
improvements to existing industrial facilities, utilities and systems for
plant upgrades.

Sheppard Contracting, Piscataway Wastewater Treatment Plant, Washington
Suburban Sanitary Commission, Construction management and inspections for,
Civil, structural, cost estimating and construction management services for
upgrades.
Sheppard Contracting, Biological Nutrient Removal Facility Parkway WWTP,
Washington Suburban Sanitary Commission, Largo, MD. Construction management
and Inspections for Phase III, 7.5 MGD.