Mud Resumes

Sign in
Search for: Jobs   Resumes


Get new resumes like this by email Resumes 1 - 10 of 4014

ROV Supervisor

Jayanagar, Karnataka, India
... Work Scope : HRD Jacket Installation, Seabed & Mud-mat survey, Skirt Pile hammering, grouting ops. Job No. 28 30th Jun 2014 to 6th Oct 2014 Client : NPCC, UAE / QP Vessel : Barge HLS 2000. ROV System : Seaeye Panther Plus 956 Location : Qatar ... - Aug 06

Power Plant Rig

Rewari, Haryana, India
... 2013 SEP 2013 AQUA GOA LEAD DIVER SHIP YARD MUD LIFTING UNDER WATER CUTTING & SHIP INSPECTION FEB 2013 JUN 2013 SHIVA MARINE & SALVORS MUMBAI LEAD DIVER SHIP SHIP CUTTING AND LIFTING DEC 2012 JAN 2013 SELF CONTRACT JAKHAW MAIN DIVER/ SUPERVISOR ... - Aug 06

Engineering Vessel

Kottayam, Kerala, India
... Guiding the Mud Lift into the Pile hole. Guiding the anchor pile in the Pile hole. Placing the Gyro Compass on top of the Anchor Pile. General Visual Inspection and CCTV Inspection work. SEA SWIFT Bekk Solutions Cochin Offshore/BPCL 07’th Marc h ... - Aug 06

ROV Pilot/Technician

Dapitan, Cebu, Philippines
... 10, 2014 – March 26, 2014 Saudi Aramco / ARBI & HASBAH Field (Saudi) T22 (Free Flyer) Castorro Otto / Jacket Installation (2x), Anode and Riser Survey, Seabed and Mud Mat Survey, Boat-landing Installation, Grouting Operation Support July 20, 2014 – ... - Aug 05

Maintenance Technician Electrical

Batangas City, Batangas, Philippines
... DESCRIPTION Responsible in maintained and calibration of fire and gas system, siemens programmable logic control,Kongsberg PLC,in engine room generator,mud processing area,mud shaker room,cement room,drillfloor and all kinds of electronics control. ... - Aug 05

construction Air/Sat diver

Navi Mumbai, Maharashtra, India
... PULL HEAD SURVEY, MBU LIFT BAG INSTALLATION, SEARCH & RECOVER ROV LEAD DIVER PLB 648 W/B SAUDI ARAMCO APRIL – MAY 2019 NPCC MUD LIFT, WATER JETTING, K- NODE SURVEY AND AIR LIFTING, WELDS CLEANING, CLAMP CLEANING, CLAMP INSPECTION, RISER SURVEY, ... - Aug 05

Drilling Assistant

Cypress, TX
... for operability & safety ● Assist rig crew as necessary Pride Offshore/Ensco, Houston TX — Derrick Hand, Workover, Completion February 2004 - June 2009 Primarily responsible for handling tubulars in the derrick & maintaining the mud system. ... - Aug 04

Drilling Engineering

Menouf, Monufia, Egypt
... Working with several types of drilling fluids (spud mud, salt saturated polymer mud, KCL mud, Hydro-guard, Oil base mud, DIF, calcium chloride brine) Bit selection (PDC, Impregnated or Rock bits) & Drilling hydraulics. Running various casing sizes. ... - Aug 03

Engineer Lean Six

Dehradun, Uttarakhand, India
... Institution: Institute of Drilling Technology, ONGC, Dehradun Duration: 5 Weeks Project Title: Drill String Design for Two ONGC Wells and Study of Mud Circulation System Mentor: Mr. Nikhil Kumar Jain Executive Engineer Drilling DTS, IDT, ONGC Ltd., ... - Aug 03

Engineer Drilling

Dammam, Eastern, Saudi Arabia
... being the connection between the PSD team and IDS This role is the primary POC for the customer and can assist in technical support, preparing quotes, mud programs, virtual hydraulics, mitigating issues, and participating in service quality reviews. ... - Aug 03
1 2 3 4 5 6 7 Next