|
Resume alert |
Resumes 1 - 2 of 2 |
Kakinada, Andhra Pradesh, India
... • Planning and estimation of CC road pavements. • Preparation and regular updating of material requirements for site. • Planning and levelling for underground sewage line, storm water and drainage line, drinking water supply line. • Preparation and ...
- 2020 Jul 23
Pithapuram, AP, India
... SYSTEM ENVIRONMENT: Windows NT (Server), Windows, DOMINO GENENCOR INTERNATIONAL Palo Alto, California Designed and developed a tool that will automate cc:Mail to Notes mail migrationtasks. The purpose of the tool is to convert cc:Mail archives to a ...
- 2013 May 28