Transformer resumes in Visakhapatnam, Andhra Pradesh, India

Sign in
Search for: Jobs   Resumes


distance:
Get new resumes like this by email Resumes 1 - 10 of 12

Electrical Plant

Visakhapatnam, Andhra Pradesh, India
... 2010 Testing of Distribution Transformer up to 2 MVA include Routine Test. Erection, Commissioning & Servicing of Distribution Trasformer, Electrical Panel, DG set & Battery Bank 110 Volt. Perfect Laying Of HT Cable, LT Cable & Control Cable. ... - 2018 Sep 27

Maintenance Engineer

Visakhapatnam, AP, India
... vaccum circuit breaker b)Pre maintenance of HT switch gear such as VCB(VACCUM CIRCUIT BREAKER) once in a Quarterly, Half yearly TRANSFORMER(630KVA): a)Daily/hourly condition monitoring of power Transformer like oil temperature, winding temperature, ... - 2018 May 21

Electrical Manager

Visakhapatnam, AP, 530002, India
... all the components using connectors and securing devices Involved in electrical works, motor winding, godown wiring, house wirimg, welding generator works, transformer repairs, single phase and 3-phase a.c/d.c motor works, panel board erections etc. ... - 2017 Nov 22

Manager Electrical

Visakhapatnam, AP, India
... - Organization of electrical jobs - Operation and maintains of HT&LT transformers 11/440v -Operation and maintains of 11kv transformer yards, VFD’s and Ring main unit (RMU) - Operation and maintains Generators ‘A’ Checks - Operation and Maintenance ... - 2017 Aug 21

Project Security

Visakhapatnam, AP, 530001, India
... Tools Used: i.For extraction of text: Abby fine reader, Gemini, Abby PDF Transformer ii.For editing the text : Edit plus, Epsilon, notepad++, Dreamweaver iii.For XML validation: Oxygen iv.For checking the final output: Adobe digital edition, Mobi ... - 2016 Dec 20

Electrical Maintenance

Visakhapatnam, AP, 530001, India
... (II)Carried out DI/DR of CCS5-1 device transformer humming sound. Normal maintenance carried out system working SAT. (i)GSSCS : (I)Carried out DI/DR of Electrical line test of ECS2-1 and ECS2-3 devices are not getting cleared from the main panel. DI ... - 2016 Dec 19

Electrical Engineer Maintenance

Visakhapatnam, AP, 530046, India
... 2.Erection,installation and commissioning of 11kv HT vcb, 11kv/430volt power transformer with OLTC, 1000Kva two no’s, with320kva lighting transformer and L &T Make ACB up to 3200 Amps and various types of induction motors in the range of .37 hp ... - 2016 Dec 09

Manager Electrical

Visakhapatnam, AP, 530001, India
... Bureau Veritas and Taken the lead and commissioned the all electrical & mechanical (MEP) packaged equipments, panels and Erection of 33/11kv Power distribution lines, street light Electrification system, erection of 33KV Substation, Transformer and ... - 2016 Oct 21

Engineer Electrical

Visakhapatnam, 530001, India
... I working as a Commissioning and Erection Engineer of Power transformer up to 12.5 MVA Now Present I works in Uttrakhand, Haryana and Rajasthan totally three states. Not only Commissioning and erection works in cases any problems occurs in sites I ... - 2016 May 29

Electrical Engineer Maintenance

Visakhapatnam, AP, India
... •Transformer Capacitor Banks. •Played a key role in maintaining: •The log sheets for load details of all incoming and outgoing lines. • Handling of electrical load as per requirement. •installation,operation & maintenance of toll-plaza ... - 2015 Nov 20
1 2 Next