Abdul Saleem Ahamed Kidwai
Mobile No: +91-958*******
Mail id: ***************@*****.***
Professional Profile
> 4+ years of experience in erection and commissioning of gas plant and
thermal power plant
> Erected and Commissioned DCS (GE fanuc & Mark vi, Siemens T3000)
> Established communication between field instruments to FIM, FIM to
Controller modules using Prefab Cables, Controller modules to DCS
Server using PROFIBUS
> Configuration of IO as per the range of instruments and requirement
> Verification of interlock, safety shutdowns in the DCS by running of
Plant.
> Experience in dealing with bus couplers, AC & DC drives
> Experience in working with customers, project managers and technical
teams for securing & executing the projects
> Skills at handling multiple tasks & Project simultaneously in cross-
cultural environments
Academic Qualifications
|Degree and Date |Institute |Major and |Percentag|
| | |Specialization |e |
|M.E. |Anna University |Applied |67 |
| |- 2009 |Electronics | |
|B.E. |Anna University |Electronics & |64 |
| |- 2006 |Instrumentation | |
|Diploma in |State Board of |Electronics & |68 |
|Electronics & |Technical |Instrumentation | |
|Instrumentation |Education - 2003| | |
Career Profile
|Organization |Designation |Period |Nature of Experience |
| |Project |July 2009 to |Installation, Testing & |
|KSL |Engineer |till date |Commissioning |
|Technocrats | | | |
Areas of Interest
. DCS Commissioning
. Process Control Instrumentation
. Site Engineering
Software Skills
. Operating System: Windows 98/2000/XP, Windows 2003 Server R2
. MS Office
. CimEdit
. GEH-6408C Trend Recorder
. Embedded systems in C
. RTOS
Project Thesis
Project # 4:
|Client |APGENCO- Erection and Commissioning of 500MW |
| |thermal Power Plant |
|Customer |BHEL |
|Period |June 2011 to june 2012 |
|Description |The project stages involve installation, |
| |testing and Commissioning of GE DCS system |
| |for 500MW thermal powerplant, establishing |
| |communication between HMI and DCS, Sensors |
| |and Actuators with DCS. |
|Responsibilities |Preparation of Instrument index, I/O list, |
| |Specifications and data sheets |
| |Interfacing field instruments with DCS and |
| |configuring respective I/O's |
| |Involved in interfacing DCS and HMI panels. |
| |Experience in Bus couplers,AC & DC Drives |
| |Commissioning |
| |Loop checking and continuity checking from |
| |System Cabinet to Instruments |
| |Calibration of Pneumatic Control valves from |
| |Control room through Field Bus Protocol. |
| |Commissioned various units (CO2 system, GPS |
| |system, Hazardous gas detector system, |
| |Vibration detection System) |
| |Reviewing AS-BUILT package for preparation of|
| |project up gradation |
| |DCS IO Configuration as per Customer's |
| |requirements |
| |Installation, calibration, commissioning of |
| |Sensors, Actuators, Transmitters |
| |Interfacing of the controllers to communicate|
| |with the Control centre through PROFIBUS & |
| |MODBUS protocol |
|Protocol |PROFIBUS (RS485), Ethernet, and MODBUS, OPC |
| |server client communication establishment |
Project #3:
|Client |IOCL Vadodara - Erection and Commissioning of|
| |Gas Power Plant |
|Customer |BHEL |
|Period |Jan 2010 to june 2011 |
|Description |The project stages involve installation, |
| |testing and Commissioning of GE DCS (MARK6) |
| |system for 30MW Gas Turbine, establishing |
| |communication between HMI and DCS, Sensors |
| |and Actuators with DCS. |
|Responsibilities |Preparation of Instrument index, I/O list, |
| |Specifications and data sheets |
| |Interfacing field instruments with DCS and |
| |configuring respective I/O's |
| |Involved in interfacing DCS and HMI panels. |
| |Experience in Bus couplers,AC & DC Drives |
| |Commissioning |
| |Loop checking and continuity checking from |
| |System Cabinet to Instruments |
| |Calibration of Pneumatic Control valves from |
| |Control room through Field Bus Protocol. |
| |Commissioned various units (CO2 system, GPS |
| |system, Hazardous gas detector system, |
| |Vibration detection System) |
| |Reviewing AS-BUILT package for preparation of|
| |project up gradation |
| |DCS IO Configuration as per Customer's |
| |requirements |
| |Installation, calibration, commissioning of |
| |Sensors, Actuators, Transmitters |
| |Interfacing of the controllers to communicate|
| |with the Control centre through PROFIBUS & |
| |MODBUS protocol |
|Protocol |PROFIBUS (RS485), Ethernet, and MODBUS |
Project #2:
|Client |APGENCO - Thermal Power plants |
|Customer |SIEMENS |
|Period |July 2009 to Jan 2010 |
|Description |This project involved supply, installation, |
| |testing and commissioning of SIEMENS DCS, HMI|
| |panel for APGENCO 60MW Thermal Power Plant |
|Responsibilities |Supervision for installation of devices and |
| |its hard wire connections, Local and end to |
| |end networking and Commissioning of DCS |
| |Experience in Bus couplers, AC & DC Drives |
| |Commissioning |
| |Coordinating properly with client and vendor |
| |to ensure timely execution of projects |
| |Communication of DCS and HMI through Ethernet|
| | |
| |Interlock Verification and Modification |
| |Commissioning of various units like |
| |(UPS,DCDB, Electronic drum level |
| |indicator(Hydrostep), Eddy current drives) |
| |Logic verification and Trouble shooting |
| |Support and coordination with client and sub |
| |contractors |
| |Supervising Process Instrument Erection and |
| |Commissioning |
| |Coordination with Customer, Supplier, vendors|
|Protocol |PROFIBUS (RS485), Ethernet, and MODBUS |
PROJECT #1:
2008 to 2009-Experience in kadapa thermal power plant in kadapa Andhra
Pradesh from indwell company
Personal Details
Father name : Mr. Abul Rafi
Date of Birth : 04-05-1985
Passport number : F4147830
Nationality : Indian
Sex : Male
Marital status : Single
Languages known : English, Tamil, Hindi & Telugu
Declaration:
I hereby declare that the information furnished above is true to the
best of my
Knowledge and belief.
Place: Chennai
Abdul Saleem