Post Job Free
Sign in

Power Plant Thermal

Location:
Saudi Arabia
Salary:
as per standards
Posted:
September 07, 2012

Contact this candidate

Resume:

Abdul Saleem Ahamed Kidwai

Mobile No: +91-958*******

Mail id: ***************@*****.***

Professional Profile

> 4+ years of experience in erection and commissioning of gas plant and

thermal power plant

> Erected and Commissioned DCS (GE fanuc & Mark vi, Siemens T3000)

> Established communication between field instruments to FIM, FIM to

Controller modules using Prefab Cables, Controller modules to DCS

Server using PROFIBUS

> Configuration of IO as per the range of instruments and requirement

> Verification of interlock, safety shutdowns in the DCS by running of

Plant.

> Experience in dealing with bus couplers, AC & DC drives

> Experience in working with customers, project managers and technical

teams for securing & executing the projects

> Skills at handling multiple tasks & Project simultaneously in cross-

cultural environments

Academic Qualifications

|Degree and Date |Institute |Major and |Percentag|

| | |Specialization |e |

|M.E. |Anna University |Applied |67 |

| |- 2009 |Electronics | |

|B.E. |Anna University |Electronics & |64 |

| |- 2006 |Instrumentation | |

|Diploma in |State Board of |Electronics & |68 |

|Electronics & |Technical |Instrumentation | |

|Instrumentation |Education - 2003| | |

Career Profile

|Organization |Designation |Period |Nature of Experience |

| |Project |July 2009 to |Installation, Testing & |

|KSL |Engineer |till date |Commissioning |

|Technocrats | | | |

Areas of Interest

. DCS Commissioning

. Process Control Instrumentation

. Site Engineering

Software Skills

. Operating System: Windows 98/2000/XP, Windows 2003 Server R2

. MS Office

. CimEdit

. GEH-6408C Trend Recorder

. Embedded systems in C

. RTOS

Project Thesis

Project # 4:

|Client |APGENCO- Erection and Commissioning of 500MW |

| |thermal Power Plant |

|Customer |BHEL |

|Period |June 2011 to june 2012 |

|Description |The project stages involve installation, |

| |testing and Commissioning of GE DCS system |

| |for 500MW thermal powerplant, establishing |

| |communication between HMI and DCS, Sensors |

| |and Actuators with DCS. |

|Responsibilities |Preparation of Instrument index, I/O list, |

| |Specifications and data sheets |

| |Interfacing field instruments with DCS and |

| |configuring respective I/O's |

| |Involved in interfacing DCS and HMI panels. |

| |Experience in Bus couplers,AC & DC Drives |

| |Commissioning |

| |Loop checking and continuity checking from |

| |System Cabinet to Instruments |

| |Calibration of Pneumatic Control valves from |

| |Control room through Field Bus Protocol. |

| |Commissioned various units (CO2 system, GPS |

| |system, Hazardous gas detector system, |

| |Vibration detection System) |

| |Reviewing AS-BUILT package for preparation of|

| |project up gradation |

| |DCS IO Configuration as per Customer's |

| |requirements |

| |Installation, calibration, commissioning of |

| |Sensors, Actuators, Transmitters |

| |Interfacing of the controllers to communicate|

| |with the Control centre through PROFIBUS & |

| |MODBUS protocol |

|Protocol |PROFIBUS (RS485), Ethernet, and MODBUS, OPC |

| |server client communication establishment |

Project #3:

|Client |IOCL Vadodara - Erection and Commissioning of|

| |Gas Power Plant |

|Customer |BHEL |

|Period |Jan 2010 to june 2011 |

|Description |The project stages involve installation, |

| |testing and Commissioning of GE DCS (MARK6) |

| |system for 30MW Gas Turbine, establishing |

| |communication between HMI and DCS, Sensors |

| |and Actuators with DCS. |

|Responsibilities |Preparation of Instrument index, I/O list, |

| |Specifications and data sheets |

| |Interfacing field instruments with DCS and |

| |configuring respective I/O's |

| |Involved in interfacing DCS and HMI panels. |

| |Experience in Bus couplers,AC & DC Drives |

| |Commissioning |

| |Loop checking and continuity checking from |

| |System Cabinet to Instruments |

| |Calibration of Pneumatic Control valves from |

| |Control room through Field Bus Protocol. |

| |Commissioned various units (CO2 system, GPS |

| |system, Hazardous gas detector system, |

| |Vibration detection System) |

| |Reviewing AS-BUILT package for preparation of|

| |project up gradation |

| |DCS IO Configuration as per Customer's |

| |requirements |

| |Installation, calibration, commissioning of |

| |Sensors, Actuators, Transmitters |

| |Interfacing of the controllers to communicate|

| |with the Control centre through PROFIBUS & |

| |MODBUS protocol |

|Protocol |PROFIBUS (RS485), Ethernet, and MODBUS |

Project #2:

|Client |APGENCO - Thermal Power plants |

|Customer |SIEMENS |

|Period |July 2009 to Jan 2010 |

|Description |This project involved supply, installation, |

| |testing and commissioning of SIEMENS DCS, HMI|

| |panel for APGENCO 60MW Thermal Power Plant |

|Responsibilities |Supervision for installation of devices and |

| |its hard wire connections, Local and end to |

| |end networking and Commissioning of DCS |

| |Experience in Bus couplers, AC & DC Drives |

| |Commissioning |

| |Coordinating properly with client and vendor |

| |to ensure timely execution of projects |

| |Communication of DCS and HMI through Ethernet|

| | |

| |Interlock Verification and Modification |

| |Commissioning of various units like |

| |(UPS,DCDB, Electronic drum level |

| |indicator(Hydrostep), Eddy current drives) |

| |Logic verification and Trouble shooting |

| |Support and coordination with client and sub |

| |contractors |

| |Supervising Process Instrument Erection and |

| |Commissioning |

| |Coordination with Customer, Supplier, vendors|

|Protocol |PROFIBUS (RS485), Ethernet, and MODBUS |

PROJECT #1:

2008 to 2009-Experience in kadapa thermal power plant in kadapa Andhra

Pradesh from indwell company

Personal Details

Father name : Mr. Abul Rafi

Date of Birth : 04-05-1985

Passport number : F4147830

Nationality : Indian

Sex : Male

Marital status : Single

Languages known : English, Tamil, Hindi & Telugu

Declaration:

I hereby declare that the information furnished above is true to the

best of my

Knowledge and belief.

Place: Chennai

Abdul Saleem



Contact this candidate