Post Job Free
Sign in

Maintenance Technician

Location:
Plano, TX
Posted:
June 23, 2011

Contact this candidate

Resume:

Thomas N. Tait

**** ******* ****

Argyle, TX. ***26

972-***-****

Objective A position as a Maintenance Technician lll based on experience and job performance.

Experience Dec 2009 – March 2011

Dikita Enterprises Inc.

Dallas, TX

New 48 Car SLRV Project

As an employee of Dikita I monitor and provide oversight of manufacturing, assembly,

testing and QA activities related to Dart light rail vehicles. Utilizing procedures to

monitor the manufacture and assembly of electrical, pneumatic mechanical and heat/air

conditioning systems. Interpret technical specifications / test procedures and apply

requirements to the manufacturing , assembly and test processes. Monitor inspections

of equipment, systems and completed products / assemblies and document findings of

inspections. Prepare daily reports of activities and highlight problem areas and defects.

Coordinate and interface with manufacturer’s production, testing and QA staff.

March 2008 – Dec.2009

Dikita Enterprises Inc.

Dallas, TX

Retro fit 115 Car LRV Project

As an employee of Dikita I monitor and provide oversight of manufacturing, assembly,

testing and QA activities related to Dart light rail vehicles. Utilizing procedures to

monitor the manufacture and assembly of electrical, pneumatic mechanical and heat/air

conditioning systems. Interpret technical specifications / test procedures and apply

requirements to the manufacturing , assembly and test processes. Monitor inspections

of equipment, systems and completed products / assemblies and document findings of

inspections. Prepare daily reports of activities and highlight problem areas and defects.

Coordinate and interface with manufacturer’s production, testing and QA staff.

August 2001 – December 31, 2007

Kinkisharyo International, L.L.C.

Mare Island, CA / Dallas, TX / Seattle, WA

Inspect, report, schedule and direct others of precise in-process production work at

various project sites of final assembly trains. Accomplish component material source

inspections, on site and at vendor sites. Precise measuring instruments utilized and

maintained to accept and reject train, truck, and component assemblies. Maintain and

update inspection reports/records to specific drawing requirements of all received and

assembled equipment to accomplish final inspections for certification of compliance

and source release to customers.

September 1999 – August 2001

Mindseed Corporation – Pittsburg, CA.

Inspector/ Lead Inspector/ Supervisor – Inspect, report, direct, and arrange of precise in-process production work accomplished on re-hab of BART wheel and axle truck and coupler assemblies. Precise measuring instruments utilized and maintained to accept and reject all material. Maintain and update inspection reports / records to specific drawing requirements of all received, rehabbed, audited equipment to accomplish final inspection for certification of compliance and source release to customer.

August 1998 – August 1999

Chateau III, Senior Assisted Living –Pleasant Hill, CA.

Maintenance Director – Perform, inspect, report, direct, and make arrangements for all building maintenance and repair work involving plumbing, mechanical, electrical, carpentry, painting, carpet cleaning tasks as listed in Maintenance Logs and outlined in the facility Preventive Maintenance Program. Assist with resident needs, request, and problems in a professional and timely manner. Maintain, update, inventory maintenance schedules, tool equipment, and supplies. Purchase order and receive maintenance supplies, equipment, and repairs within allotted monthly budget.

April 1996 – July 1998

GE Supply, Modification Shop – Martinez, CA.

Electrical Technician – Layout, mount, align, terminate, groom, wire check electrical power, control, indication equipment panels. Components worked on are switch gear, controllers, relays, PLC’s, circuit breakers, fuses, drive units, MCC’s and meters. Panels built to customer and standard specifications per drawing requirements. Utilize for modification and installation hand tools, test meter equipment, drills, sanders, saws, bending and threading machines. Upon completion of work project, prep/package panel enclosure for shipment with common carriers and truck companies.

September 1969 – February 1996

Mare Island Naval Shipyard – Vallejo, CA.

Electrical Inspector Leader ( Dec. 1977 – Feb. 1996 )

Precise in-process system completion, shop fabrication, inspected a wide variety of electrical / mechanical equipment components for nuclear navy submarines. Researched, scheduled, coordinated, remedied, documented, and directed inspections through working with various tradesmen, engineers, planners, technicians, project managers, and naval personnel. Audits, progress / status reports, record keeping , filing, processing, computer data input, and leading inspection personnel are among other duties performed.

Electrical Inspector (Aug. 1976 – Dec. 1977)

Performed visual, pre-operational,and pre-test inspections of electrical and mechanical systems during ship overhauls. Wrote and submitted defect reports per process instructions, military standards, and system plan specifications.

Electrician (Sept. 1969 – Aug. 1976)

Performed overhaul, layout, repair, hookup, assembly, alignment and test of electrical/ mechanical components and systems undergoing new construction and maintenance upkeep. Utilized for overhaul and installation electrical hand tools and test equipment.

Education Solano Community College, electrical trade and general education.

A.A. Degree.

Mare Island Naval Shipyard Training Schools

- Electrical Trade Theory Apprenticeship 1800 Hrs.

- Fundamentals of Motor Controls 60 Hrs.

- Increasing Human Effectiveness 40 Hrs.

- Total Quality Management 30 Hrs.



Contact this candidate