Post Job Free
Sign in

Power Plant Thermal

Location:
United States
Posted:
September 09, 2012

Contact this candidate

Resume:

Razzaq Ahmad Anjum

**** ** ******** ***** ***** Plant

Mesaieed Power Company Ltd; Doha, Qatar

Ph: +974-********

E-mail: *****.******@*****.***

An enthusiastic, dynamic, self-motivated and achievement oriented qualified Operations Manager. A natural team leader, ready for challenging work environment, having attained proven skills in Operations of Combined Cycle and Conventional Thermal Power Plants, Currently working as Operations Manager with Mesaieed Power Company Ltd at 2000 MW CCGT Power Plant- at Mesaieed Industrial City, Qatar.

_____________________________________________________________________________

Career Objectives: Apex plant management position in the area of power generation.

.

Work Experience

March 2011 – To date

September

2003 - To Feb 2011

Operations Manager at 2000 MW Mesaieed Power Plant

(This is a Combined Cycle Power Plant having six 9FA GE Gas Turbines, three NEM HRSGs, three GE Steam Turbines and two 6FB Gas Turbines)

450 MW Rousch Power Plant

(Natural Gas is the main fuel and Diesel oil the back-up fuel)

Operations Manager

• Responsible and accountable for the highest standards of safety and the efficient and profitable operation of the plant by creating a well motivated and highly trained Operations team, to work effectively in a commercial environment.

• Responsible for ensuring that all legal, environmental, health and safety standards are met by implementing the appropriate engineering codes and procedures.

• Responsible for implementation of plant operational procedures.

• Responsible for the implementation of emergency procedures and ensuring that there is adequate resource to deal with such situations.

• Accountable for compliance with environmental emission limits.

• Responsible for managing the fuel management system and inventory.

• Responsible for preparation and monitoring of the RPPL budget for fuel, chemical, water and import energy.

• Responsible for leading the national team for the operations of combined cycle 450 MW Rousch Power Plant so as to run the plant safely, reliably and cost effectively to achieve its goals and objectives.

• Involved in dealing with WAPDA/NPCC regarding PPA, System Operating Procedures and ADC tests etc. Also, I am a member of Rousch – WAPDA operating committee.

• Involved in dealing with SNGPL regarding the day to day operations and maintenance issues under GSA. I am also member of Rousch-SNGPL coordination committee.

• Involved in managing the ‘Long Term Maintenance and Service (LTMSA)’ Agreement with Siemens.

• Involved in managing the ‘Operations and Maintenance’ Contract with RPPL.

• I was chairman of ESBI-Rousch HS&E Committee, leading ESBI team on Safety front.

• Leading the team dedicated for the evaluation of Complex performance and generation for monthly performance review and reporting.

• Involved in providing presentation of Complex Performance to owner’s representatives during Monthly Performance Review Meetings.

August 1997 – September 2003

412 MW Rousch Power Plant

(Fuel: Residual Furnace Oil RFO)

Shift Charge Engineer (SCE)

• Prior to the commercial operation date (COD December 1999), the main responsibilities were to lead the shift operations team during pre-commissioning, cold commissioning and commissioning activities of the Rousch Power Plant. The other responsibilities were:

• Leading the shift operations staff for normal operations, startup, shutdown and emergency scenarios.

• Involved in the Reliable Test Run (RTR), Initial Dependable Capacity (IDC) and Annual Dependable Capacity (ADC) tests of the Complex.

• Writing and reviewing the Plant Operating Procedures.

• Planning and scheduling the plant shutdown for routine washing outages, minor and major outages of the complex.

• Troubleshooting of the Plant and to raise the fault conditions to the concerned maintenance sections.

• Supervision of the “ Plant routine checks and operations routines”

• Preparation of Monthly Plant Performance Reports.

• Act as Senior Authorized Person (SAP), Control Person and Safety Coordinator for PTW (permit to work) system.

• Fire & Emergency Response Team Leader

• Authorized to deal with NPCC (National Power Control Center - Islamabad) for switching and commercial operations.

• Provided effective training to a team of Process Operators.

• Carried out assessment/appraisals of the operations staff and identifying their development needs accordingly.

January 1997 to August 1997

AES LalPir Thermal Power Plant - Muzaffargarh

(conventional power plant with RFO fuel)

Operations Engineer

Worked as Operations Engineer for the operations of two conventional steam turbine units of 362 & 365 MW.

July 1993 to December 1996

Ministry of Electricity & Water – Kuwait

Senior Shift Charge Engineer

Responsible for the operations of 2560 MW Thermal Power Plant with following description:

8 x 300 MW Steam Turbine units

4 x 40 MW Gas Turbine units

8 x 6 MIG per day distillation units

There were four kinds of fuel over there:

RFO, Crude Oil, LFO and Natural Gas

July 1991 to July 1993

WAPDA Engineering Academy - Faisalabad

Simulator Instructor

Provided Power Plant trainings to WAPDA operators and engineers from different formations of WAPDA.

June 1989 to June 1991

Kot Addu Thermal Power Plant – Kot Addu

Power Plant Engineer

Worked for operations and maintenance of 800 MW Gas Turbine Power Plant where RFO & LFO were used as fuel.

Got training from Alsthom, FRANCE, for the operations and maintenance of GE gas turbines MS 9001E

September 1987 to June 1988

WAPDA Thermal Power Plant – Faisalabad

Power Plant Engineer

Worked for operations and maintenance of 132 MW Thermal Power Plant.

PROFESSIONAL TRAINING:

Institution Period Description

Alsthom training Centre Belfort, France 3 Weeks Basic operations & maintenance training of GE frame-9 gas turbines

GT training Centre Faisalabad 6 Months Operations & maintenance of gas turbines

WAPDA Eng. Academy Faisalabad 4 Weeks Operations of thermal power plant on 450 MW simulator

WAPDA Eng. Academy Faisalabad 9 Weeks Basic Computers training

Nichimen Training. Centre AES Lal Pir 6 Weeks General training regarding Boilers, Steam turbines, Generators, Switchgear & Balance of plant installed at AES Lal Pir

Rousch Power Training. Centre Abdul Hakim 2 Weeks Balance of plant systems training.

Rousch Power Training Centre Abdul Hakim 3 Weeks A Course regarding GT V94.2 design, aux. Systems, Generator, GT controller, Teleperm XP introduction, Electrical Aux. Supply etc.

Rousch Power Training Centre Abdul Hakim

1 Week Introduction to GT simulator.

Rousch Power Training Centre Abdul Hakim 1 Week HRSG operational training by M/s NEM Holland

Rousch Power Training Centre Abdul Hakim 1 Week First aid/ CPR & Personnel safety course by MEDI-CALL Islamabad

SGS – Karachi 1 Week Introduction to measurements, loss control, safety codes of practice in petroleum products handling

Nisoft (UK) Ltd 1 Day Safety Management System (Eclipse Electronic PTW system)

British Council Lahore 2 Days Handling the people positively & Assertively.

SDPI Islamabad 1 Day Environmental self monitoring & Reporting by industry.

Irish Management Institute Dublin 01 Day Performance Appraisal by Andrew Mc Laughlin

Spearhead – Abu Dhabi 02 Days Project Management

European Technology Development. 6 Days Life Assessment of High Temperature Components

Wood Land Grange UK 02 Weeks National General Certificate in Occupational Safety & Health.

Benchmarking Safety Audits 02 days ESBI Dublin, Ireland

Education

• MBA (Finance and Accounts) First Class 2002

Preston Institute of Management Sciences and Technology Multan Campus

• B.Sc. Engineering (Power) First Class 1986

University of Engineering & Technology Lahore - Pakistan

• National General Certificate in Health and Safety from NEBOSH UK.

Membership

Institute Registration No.

Pakistan Engineering Council ME-5555

Kuwait Engineering Council 13832

Computer Literacy

• Conversant with Windows and Microsoft Office applications.

• Working with LAN (local area network).

• Working with CMMS (computerized maintenance management system).

• Working with Nisoft (Safety Management System)

Mobility

• valid car driving license

Personal Information

• Father's Name: Amir - ud - Din

• Date of Birth: 09 September 1961

• Marital Status: Married

• Permanent Address: House No. P-41, Street # 1, Mujahid Town, Jaranwala Road Faisalabad, Pakistan.



Contact this candidate