Post Job Free
Sign in

Construction Supervisor

Location:
Roseland, LA, 70456
Posted:
July 18, 2012

Contact this candidate

Resume:

________________________________________

Professional Qualifications

I have 28 years in the Construction Industry including Commercial, Heavy Industrial, Fossil Power and Petro Chemical and Polymers Modifications involving Heavy Lifts, Crane Selections, Steel Erection, Crane Assembly and Inspection, Civil, Piping as well as Mechanical Equipment. I have experience in Critical Lift Planning as well as Executing with input on Practical Design and Capabilities. I have certification in Mobile Crane and Rigging Inspection as well as rigging operations. I have certification in OSHA’s 30-hour Construction Safety and OSHA’s 10-hour General Industry. I have experience with Mobile Cranes as well as Floating Cranes and Mobile Cranes on Barges. I am familiar with all of ASME B30 Lifting and Rigging Standards as well as OSHA Regulations including the New Crane Standard along with USAC of Engineers EM-385. 1 have a full line of construction management experience. My personal quality goal is to make Safety and Quality a value for myself and those of my direct reports. I have and will make time to see that the Company and Customers’ Expectations and Requirements are met as well as obtain feedback for my actions. While doing this assuring Safety, Quality, Schedule and Profits are all met.

Additional Training/Continuing Education

OSHA 30 Hour Construction Safety, Advanced Online, 2011

OSHA 10-Hour General Industry Training, Coastal E-Campus, 2010

Accident Investigation, Moxie Online, 2010

National Commission Certification of Crane Operators, International Assessment Institute, 2010

Crane and Rigging Inspection, Crane Inspection and Certification Bureau, 2010

Mobile Crane & Rigging Inspections, Crane Inspection & Certification Bureau, 2010

Risk Management, Rigging Plans, Load Control, Rigging Triangle, Application of Hardware and Slings, Onsite by Crosby Group, 2010

Rigging Operations, Coastal E-campus, 2009

OSHA: An Introduction for Construction, Coastal E-campus, 2009

Cofferdam Safety awareness, Shaw Talent Connection, 2009

Riggers Refreshment, Becon Construction, 2008

Crane Operations Certification, Dixon Equipment Services Inc., 2007

Crane Operations/Operator, Crane Safety Services, Inc., 2000

NCCER Industrial Ironworker - Certified Plus, Associated Builders and Contractors, 1999

Effective Labor Relations, Fluor Daniel /Bayport,Tx., 1998

Registrations/Certifications/Licenses

Journeyman Ironworker, 1999, XXX-19-8538, Active, Louisiana, 08/2030

Crane Operator, 2010, NCP78275, Active, Louisiana, 03/2015

Crane Inspection, 2010, VIT-10-0317-418, Active, Texas, 03/2012

Rigger, 1999, Active, Kentucky

Experience and Background

The following is a summary of key projects:

06/2009 - Present

Construction Field Manager / Assistant Project Rigging Specialist, Shaw Environmental & Infrastructure, Inc., Federal, New Orleans, Louisiana

I was responsible for managing various phases of the construction project on the largest civil works projects led by the U. S. Army Corps of Engineers. I assumed the role as night shift construction manager reviewing submittal’s for comments in addition to observing the contractors monitoring safety, quality, schedule and production. Assuring the contractors are following all policies, procedures as well as all specifications as required. As one of the project rigging specialist I was responsible for reviewing critical lift plans as well as observing critical lifts and observing all other rigging and lifting operations as well as crane operations and inspections to see that the contractors are complying with all ASME standards, Government Regulations and the USAC of Engineers EM 385-1-1 as well as Shaw’s INHC-CN004-1 policies and procedures on the following features of work.

12/2011 – 7/2012

South Vehicle Access ramp

I was responsible for the construction of the south vehicle access ramp which consists of driving H-pile, placing concrete for the footings, columns, bent caps, deck spans and barrier rails. We also placed scour stone on both the flood and protected sides of T-wall which was R1000, R130 and 55 stone. The was additional work added that consists of driving sheet pile, pipe pile placing a cap on the wall as well as installing composite timbers.

08/2011 – 12/2012

Scour Stone Placement

I was responsible for the placement of the scour stone on the protected side of the main floodwall which included 98,141 tons of R1000, 22,000 tons of R1300, 56,600 of quarry run and 15,547 of bedding stone. All this stone was placed under water and was monitored for lines and grade by the use of Hypac surveys as well as side scan sonor that were plotted on cross sections for review.

12/2010 – 08/2011

Sector Gate Install

As the night shift construction manager I was responsible for the install of the coffer cell, the placement of 10,000 yard tremie placement, the leveling pads placement, base slab placements as well as the monolithic placements for the main gate structure monitoring the contractor for safety, quality schedule and production as well as see that all specification are being followed. I was involved in the off load of the sector gates which were 600 tons each. These lifts were made from barges with the use of a 4600 ringer on a barge and a derrick crane barge. They were sat in the water and floated in place then sank on the pintle’s with ballast tanks. We then erected the bridges and walkways for access to the flood wall.

06/2009 – 12/2010

Night Shift Project Rigging Specialist

I was responsible for reviewing critical lift plans as well as attending critical lifts assuring that the contractors were executing the lift as planned. I also routinely observed all site lifting and rigging activities including crane operations and inspection assuring that the contractors were complying with all ASME B30 standards, OSHA’s regulations including the new crane standard as well as USACE’s EM -385-1-1-1 and Shaw’s lifting and rigging policies and procedures.

Accomplishments:

While on the IHNC project. I received certification in crane inspection, rigging inspection, took the NCCCO written exam’s, OSHA's 10 hour general industry, OSHA's 30 construction safety. I had hired in as a rigging specialist but proved to have construction manager qualities and was moved into management over the night shift sector gate install, the scour stone placement as well as the south vehicle access ramp.

08/2008 - 06/2009

Rigging General Foreman, Becon Construction, Power, Bedford, Kentucky

I was responsible for the pre planning and execution of all light, medium, heavy and critical lifts at LG&E’s 750 MW coal burning power plant upgrade. I worked with the rigging engineering on the practical side of the planning for lifts requiring a lift plan as well as verified that they were executed as planned. I supervised the barge off loading as well as coordinated all the heavy hauls throughout the plant to the lift site where we had previously set up the super lift crane with super lift tray attachments. I also supervised all crane reconfigurations to a 2800 Demag, 2600 Demag, 8500 Demag, Manitiwoc 4100S2, 4100S3, 3900, 2500 Kobelco and Manitiwoc 14,000 and the LR 1400 Liehberr. I was responsible for all rigging that was purchased as well as keeping up with inspections and distribution to other disciplines. I had overall site responsibility for all rigging and lifting operations

Accomplishments:

While working for Becon I hired in as structural raising gang foreman and was moved up to rigging general foreman after 4 months. Then I was moved up to senior rigging general foreman.

03/2008 - 08/2008

Structural/Rigging Foreman, Becon Construction, Bedford, Kentucky

I was responsible for the erection of structural steel, Heavy Lift Crane assembly and reconfiguring, rigging and setting of all heavy equipment on the turbine building with the use of a Manitiwoc 4100S2 with 200’ of main boom and 30’ of fixed job with a 30 degree offset and a 2600 Demag with 60 meters of main boom and 40 meters of luffing jib on LGE & E’s 750 MW coal burning power plant upgrade.

Accomplishments:

I was promoted to rigging general foreman.

08/2007 - 03/2008

Crane And Rigging Superintendant, J.V. Industrial, Petro Chemicals, Deer Park, Texas

I was responsible for coordination of all heavy equipment across all disciplines. I assisted the rigging engineers in developing rigging plans and setting of all production equipment. I was responsible for crane reconfigurations, assembly and demobilization, including the set up of a LR1200 Liebheer crane with 175' main boom and 185' of luffing jib.

05/2005 - 08/2007

Sole Proprietorship, Superior Welding and Fabrication, Fabrication, Moss Bluff, Louisiana

I was the owner of a fabrication shop. Responsible for estimating, fabricating and delivery of structural steel and pipe fabrications.

11/2002 - 05/2005

Fabrication Shop Mananger, Gulf Services Mechanical, Fabrication & Install, West lake, Louisiana

I was responsible for going on pre job walk downs and Estimating the fabrication and installation of structural steel and piping as well as all associated mechanical equipment. I worked closely with quality control on boiler code vessels involving third party Authorized Inspector under State and ASME codes through R Stamp Certification.

11/1998 - 05/2002

Construction Superintendant, Unifab International, Port of Lake Charles, Sulphur, Louisiana

I was responsible for the erection of a 3200 ton ship loader for the port of Lake Charles. Which involved the setting of all associated euipment, piping, structural steel, conveyor systems as well as the main boom with a 450 ton floating crane.

Construction Superintendant, Blend Tanks Upgrade, Firestone, Westlake, La.

I was responsible for the erection of the blending tanks and all associated civil, structural steel, piping and mechanical equipment. I preplanned and designed the lift plan to prevent the bending or misalignment of the flanges on the agitator shaft.

Construction Superintendant, Unifab International, Entergy, Westlake, Louisiana

My responsibilities included all activities associated with a scheduled outage to replace a 65 ton heat exchanger. Including demo of all piping, structural steel as well as the critical lift planning of the removal and replacement of the exchanger as well as field routing the new piping, along with leading in the commissioning of the unit.

Construction Superintendant, Production Platform Offload, Eron Oil & Gas, Lake Charles, la.,

I was responsible for the fabrication and installation of the jack beams as well as the off loading of a 900 ton offshore jacket and a 975 offshore platform from barges with the use of Mammeots Scheuler trailers

Construction Superintendant, Hydrazene Unit Upgrade, Arch Chemicals, Sulphur, La.,

I was superintendant and led all phases of construction for capital projects including mechanical, civil, piping and structural steel. Duties included estimating, planning and installation of all, as well as crane selection and lift planning

Construction Superintendant, 3200 ton Coke Ship Loader Erection, Port of Lake Charles, Westlake, La.,

I was responsible for the erection of a 3200 ton ship loader. Which included all associated mechanical equipment, structural steel, upper carriage, as well as main boom and associated conveyor systems.

Construction Superintendant Offload of Offshore Platform and Jacket Lake Charles, La.

I was responsible for the fabrication and installation of the jack beams as well as the off loading of a 900 ton offshore jacket and a 975 offshore platform from barges with the use of Mammeots Scheuler trailers heavy haul transporters.

09/1998 - 11/1998

Structural Steel Foreman, West End Steam & C4 recovery Project, Citgo, Westlake, La.,

I was responsible for the erection of structural steel, rigging and setting of all related equipment.

01/1998 – 09/1998

Structural Steel General Foreman, E-Line Upgrade, Polymers Plant, Basil, Bayport, Tx.,

I was General Foreman over the erection of three 365 ton modules, including coordinating the setting of all mechanical equipment between the iron workers and the millwrights. I was also the overseer of the erection of Deep South’s 1200 ton Versa Lift Crane to make the lifts on the modules.

Skills

Group: CONSTRUCTION/REMEDIATION SPECIALTIES

Category: CONSTRUCTION/REMEDIATION

Skill/Experience Level: Demolition : Senior

Skill/Experience Level: Steel Erection : Senior

Skill/Experience Level: Vertical Construction: Senior

Skill/Experience Level: Wastewater Treatment Plant Construction : Working Knowledge

Category: GENERAL/SKILLED LABOR

Skill/Experience Level: Carpentry : Senior

Skill/Experience Level: Concrete Finishing : Senior

Skill/Experience Level: Heavy Equipment Operation : Senior

Skill/Experience Level: Mechanical Disassembling : Working Knowledge

Skill/Experience Level: Pipe Fitting : Senior

Skill/Experience Level: Steel Erection : Senior

Skill/Experience Level: Welding : Senior

Other Information

Language: Speak Read Write

English: Fluent, Fluent, Fluent

Years of Experience

Previous Employers: 25yrs

Shaw: 3yrs

Total of 28 yrs experience

Experience in EPA Regions

Region 4 (AL FL GA KY MS NC SC TN)

Region 6 (AR LA NM OK TX)

Industry Experience

Construction

Industrial Construction

Modular Construction

Petrochemical

Petroleum

Polymers

Ports and Harbors

Power Generation

Process Safety

Pulp and Paper

Refining

Steel

Wastewater Treatment

Citizenship Information United States



Contact this candidate