Resume Sr. Principal Piping Designer
RONALD DALE ANDERSON
Brenham, Texas 77833
Phone 979-***-**** or 979-***-****
Email: ***********@*****.***
OBJECTIVE
A position in the field of Piping Design, Field Piping Engineering or Piping Estimator with a company offering a challenge and growth opportunity. I currently would like to work in the Houston area only at this time.
SUMMARY
I have extensive experience in the field of piping design, construction, and supervision in the field of petroleum, petrochemical, and chemical industry which includes, FEED planning layouts and project plot plan development. Also includes designing modular units (Skids), offshore platforms (4 Years at Brown & Root designing high pressure piping systems and construction for production and compressor platforms), marine facilities, pipeline, compressor stations and pharmaceuticals. Seven years working overseas designing piping systems, field piping engineer, piping fab shop coordinator and supervising engineering and construction subcontractors in Nigeria, South Korea, Japan, Mexico, Venezuela, and Aruba. Other fields of responsibilities include estimating, proposals, scheduling, and expediting.
COMPUTER SKILLS
PC’S, WORD, EXCEL, AUTOCAD 14/2000I/2002/2005/2008/2010/2011, PDS (4 Years), FLEXCAD (2 Years), CADWORX 2001 & CADWORKS 2004-2008-2009-2010 (5 Year), REBIS AUTOPLANT 3-D, BENTLY AUTOPLANT 6.8 (4 Years) & PDMS TRAINING.
PROFESSIONAL SKILLS
PIPING DESIGN SUPERVISOR / LEAD PIPING DESIGNER (20 Years) (PROCON, LITWIN, M.W. KELLOGG, COASTAL REFINING , ALLIANCE ENGINEERING and J-W GATHERING)
Responsibilities included Plot Plan Development for project proposals, Approve planning layouts, Review others plant layouts, Production drawings, P&ID development, Isometrics, Stress, and Piping specs. Maintain Progress and Project schedules. I also have extensive exposure to supervising engineering subcontractors, constructability studies, plant layout, field revamp projects, checking, piping estimates pertaining to man-hours and materials, and resolving field design problems for construction. All the projects I supervised were completed under budget, schedule, and 5% or less design and fabrication errors.
CAREER HIGHLIGHT
REF –CHEM
July 2011 to Present
Principle Piping Designer/Checker
Principle Piping Designer/Checker w/CADWorx
J-W GATHERING (LONGVIEW TEXAS)
April 2010 to June 2011
Lead Principle Piping Designer/Checker
Lead Principle Piping Designer/Checker w/CADWorx. Currently drawing as built P &ID’S and Piping drawings for pipelines, pig launcher & receivers, compressor stations, dehydration units, refrigeration units, demethanizer units, J-T units, meter-regulator stations, fuel gas stations, and gas facilities. I have approximately 125 different types of station to as-built within the USA.
ALLIANCE ENGINEERING (CONTRACT POSITION)
April 2008 to July 2009
Principle Piping Designer/Checker
Principle Piping Designer/Checker w/CADWorx. Currently design and checking pipelines, pig launcher, compressor stations, meter-regulator stations and gas facilities. Issued design packages for construction.
Clients: El Paso, Kinder-Morgan, Spectra, Boardwalk
BEI ENGINEERING (CONTRACT POSITION)
Feb.2007 to April 2008
Principle Piping Designer/Checker
Principle Piping Designer/Checker design and checking Bio Diesel Plant and other Petrochemical units
EXCEL ENGINEERING (CONTRACT POSITION)
June 2006 to Jan. 2007
Principle Piping Designer/Checker w/CADWorx
Principle Piping Designer/Checker: design and checking of offshore platform Revamps.
M & H ENGINEERING (CONTRACT POSITION)
Feb. 2006 to June 2006
Principle Piping Designer/Checker w/CADWorx
Principle Piping Designer/Checker: design and checking of offshore platform Revamps.
VECO ALASKA (CONTRACT POSITION)
October 2004 to Feb. 2006
Principle Piping Designer/Checker
Principle Piping Designer: Responsibility included designing piping systems for modular units for oil and gas facilities on the North Slope. My primary areas of design were well tie-ins and the major equipment.
These projects were for (Conoco-Phillips). All project were designer using Bentley Autoplant 6.8.
BEGAILA ENGINEERING SERVICES (CONTRACT POSITION)
April 2004 to October 2004
Principle Piping Designer/Checker using FlexCad
HI-LINE INDUSTRIES
August 2002 to Jan 2004 (Part-time)
Mechanical Designer/Detailer
Mechanical designer detailing conveyors and structural steel.
HOWE-BAKER (CONTRACT POSITION)
June 2001 to June 2002
Principle Piping Designer
Principle Piping Designer: Responsibility included designing piping systems for modular plant. All the offsite pipe racks (20 modules), storage tank area (7 tanks), storage tank pumps (1 module with seven pumps the other with two pumps), high pressure and low pressure dearators (1 module), boiler feed water pumps (1 module with six pumps and condensate KO drum, boiler (1 module), crude unit (3 modules), hydrotreater unit (3 modules), hydrocracker unit (4 modules), instrument air dryer and KO drums (1 module), plus 2 other modules pertaining to the gas to liquids process. Checked piping plans, sections, and isometerics. Used flexcad for study piping drawings and rebis autoplant 3-D for plant modeling.
Project:
Gas to Liquids, Conoco,
FLUOR DANIELS (CONTRACT POSITION)
Feb. 1998 thru June 2001
Principle Piping Designer/Field Piping Engineer/Subcontract Administrator
Principle Piping Designer: Responsibility included designing piping systems for the projects as shown. This included checking of piping plans, sections and isometerics. Also resolved engineering and construction errors, client modifications, and new field design projects. Used computer systems PDS, autocad, and rebis.
Field Piping Engineer/Mechanical Subcontract Administrator: Responsibility included coordinating activities with Pellerin the construction mechanical subcontractor for equipment installation, pipe fabrication and erection, painting, prepared pre hydro-test punch list, witness hydro-test and sign offs with Witco. Resolved engineering and vendor design errors, modifications to existing equipment, field walk downs with Witco personal, and others. This was on the Witco project at Taft.
Engineering Subcontract Administrator: Responsibility included coordinating all piping interface with Matrix Engineering and Fluor. This was mainly tie-ins and pipe racks. Project was in Houston.
Engineering Subcontract Administrator: Responsibility included coordinating all piping interface with Wink INC. Pellerin subcontracted Wink to draw all the isometrics for pipe spool fabrication. I maintained the isometric priority list, answered question pertaining to vendor or piping drawings and resolved design error.
COASTAL REFINING ARUBA (OVERSEAS) (CONTRACT POSITION)
July 1996 thru Feb.1998
Lead Piping Designer, Field Piping Engineer, Equipment Inspector
Piping Designer Supervisor: Responsibility included supervision, piping design, checking and field construction engineer for the following units. Crude (2 units), Hydrotreater (3 units), Vacuum, Hydrogen (2 units), Satgas, Visbreaker, and Storage tank farm area. Used autocad for some drawings and P&ID’S.
Field Piping Engineer/Equipment Inspector: Responsibilities included correcting design problems, prepare punch list, and generate field change orders and execution of hydro-test programs, inspections, material requisitions, work schedule, and weekly progress reports. Supervised mechanical subcontractors for pipe fabrication, pipe spool erection, testing, painting, insulation, and equipment installation
M. W. KELLOGG
Sept. 1988 thru July 1996
Lead Piping Designer, Principle Piping Design Specialist, Fab Shop Coordinator, Field Piping Engineer
Principle Piping Designer: Responsibility included designing many types of piping systems including the following overseas experience. Used PDS computer system.
OVERSEAS EXPERIENCE
NIGERIA: Nafcon Fertilizer Complex. Responsibilities included overall engineering design for 21small projects plus a major turnaround. Trained engineering staff in piping design, estimating project man-hours and materials, proposals and scheduling for engineering and construction projects. (1 year)
SOUTH KOREA: Ethylene Expansion Project. ($30M) Responsibilities include piping design and checking for revamp project at Yukong in the city of Ulan, South Korea. (6 months)
Ethylene Project for Hyundai Chemicals Deanna, South Korea. ($1.2B) Responsibilities included Supervision, quality auditing of isometrics and piping plans, resolving design problems, generated engineering design change orders, and issued weekly progress reports on engineering subcontractor Hyundai Engineers. (6 months)
MEXICO: MTB Project in Kuantan, Malaysia. ($ 900M) Responsibilities included Supervision, quality auditing of isometrics and piping plans, resolved design problems, generated engineering design change orders, issued weekly progress reports on engineering subcontractor Buffety Engineering. (1 year )
Fab Shop Coordinator: VENEZUELA: Maraven Refinery Expansion Cordon, Venezuela. ($1.3B) Responsibilities included piping layout design and checking. Other responsibilities included Piping Fab Shop Coordinator at DSD in Port Ordiza ( Fabricated 5000 spools) and Shaw South America in Maracibo ( Fabricated 8000 spools). Coordinated engineering and shop activities pertaining to changes on isometrics and shop spool drawing. Resolved all errors found by shop fabricator, quality audited spool drawings for dimensional and material errors, assisted shop inspectors with engineering and technical questions, coordinated spool priority list, expedited shop and field for spools and materials, reported current status on any spools requiring revisions from the home office, and issued a weekly progress report. (2 years).
LITWIN E&C
March 1983 thru Sept. 1988
Piping Design Supervisor, Field Piping Engineer, Fab Shop Coordinator
Piping Design Supervisor: Responsibilities included Plot Plan Development for project proposals, Review Plant layouts, Production drawings, P&ID development, Model tables, Isometrics, Stress, and Piping specs. Maintained progress reports and project schedules. Extensive exposure to supervising engineering subcontractors, plot plan development, constructability studies, plant layout, field revamp projects, checking, piping estimates pertaining to man-hours and materials, and resolving field design problems for construction
Field Piping Engineer, Fab Shop Coordinator: Responsibilities included correcting design problems, prepare punch list, generated field change orders and execution of hydro-test programs, material requisitions, work schedule, and weekly progress reports. Supervised mechanical subcontractors for pipe fabrication, pipe spool erection, testing, painting, insulation, and equipment installation
PROCON
April 1977 thru March 1983
Piping Design Supervisor / Field Piping Engineer, Fab Shop Coordinator
Piping Design Supervisor: Responsibilities included Plot Plan Development for project proposals, Review Plant layouts, Production drawings, P&ID development, Model tables, Isometrics, Stress, and Piping specs. Maintained progress reports and project schedules. Extensive exposure to supervising engineering subcontractors, plot plan development, constructability studies, plant layout, field revamp projects, checking, piping estimates pertaining to man-hours and materials, and resolving field design problems for construction.
Field Piping Engineer, Fab Shop Coordinator: Responsibilities included correcting design problems, prepare punch list, generated field change orders and execution of hydro-test programs, material requisitions, work schedule, and weekly progress reports. Supervised mechanical subcontractors for pipe fabrication, pipe spool erection, testing, painting, insulation, and equipment installation
FLUOR
1976 thru 1977
Sr. Piping Designer/Checker
Sr. Piping Designer/Checker: Responsibilities included the design of piping systems, and checking of piping plans.
LITWIN E&C
1975 thru 1976
Piping Designer/Checker
Piping Designer: Responsibilities included the design of piping systems, checking piping plans, sections, and isometrics
Brown & Root
1971 thru 1975
Piping Draftsman
Piping Draftsman: Responsibilities included the design of piping plans, sections, and isometrics in B & R marine division for high pressure piping systems for production and compressor platforms. Preformed final field P&ID check of platforms for engineering and construction changes before pre commissioning and shipping to offshore site. Attended piping drafting school, welding school, and many other courses offered at B & R.
EDUCATION
Katy High School 1966 - 1970
Sam Houston State University 1970 - 1971
South Texas University 1972 Drafting
Brown & Root 1971 - 1974 Piping drafting school
Pipefitting school
Pipe welding school
COMPUTER TRAINING
PDS 1991 M. W. Kellogg
Intergraph PDS 1 6-6-00 SPED
AutoCAD 2000 & Cadworx Pipe 4-1-01 Horn Drafting & Cad Center
AutoCAD 2002 & Cadworx 2004 10-1-03 Horn Drafting & Cad Center
PDMS PIPING 11-02 AVEVA INC. (CADCENTRE INC)
REFERENCES
Richard Boudoin (ALLIANCE ENGINEERING)
Bill Jones 03-291-2728
Direct 903-***-****
Cell 903-***-****
J-W Office
Manager of Engineering
J-W Manufacturing Company
******@********.***