Resume

Sign in

Piping Supervisor

Location:
gorakhpur, Uttar Pradesh, India
Salary:
2000$
Posted:
March 18, 2011

Contact this candidate

ASHWANI KUMAR SINGH

+ ** 993*******, 953*******

E-Mail: vtehag@r.postjobfree.com

________________________________________

Middle level assignments in Erection & Piping Operations with an organization of repute

Brief Overview

Technically accomplished professional with over 7 years of rich experience in Erection and Piping.

Previously associated with Hyundai Heavy Industries as Piping Supervisor for Aldur IWPP project, Bahrain

Proficient with present construction methodologies and systems in compliance with quality standards.

Proven ability to build effective and productive working relationships with clients, contractors as well as design team members.

Excellent communication, analytical and problem solving skills with the distinction of receiving appraisals and recognition for excellent performance.

Areas of Exposure

Construction Supervision & Coordination

Supervising all construction activities including providing technical inputs and methodologies of construction & coordination with Site Consultants and Project Management consultants.

Inspecting field sites to observe and evaluate condition and operability of facilities and structures, and to collect field survey data and measurements.

Implementing stringent systems, detailed design and quality plans and manuals to ensure high quality standards during all the stages of project.

Foreseeing performance bottlenecks and taking corrective measures to avoid the same

Coordinating with consultants, contractors and clients as well as with Fabrication, Erection and Execution department.

Preparation forecast report according to front availability and resource availability.

Piping Operations

Determining piping routing, conceptual design & handling piping arrangements, consistence with provision for expansion and flexibility of pipe.

Identifying & reporting unobstructed areas for necessary structures that facilitate all maintenance requirements, and to access, operation and remove components without removing unrelated equipment and piping.

Preparing isometrics for piping fabrication and installation details along with Bill of Material.

Providing technical assistance to construction personnel during installation of piping and supports interfaces with other discipline to insure installation per applicable specifications and standards.

Employment History

From Sep’09 – Dec’10 with Hyundai Heavy Industries as Piping Supervisor

Deputed by SamHung Engineering & Construction, Bahrain

Project : ALDUR Independent Water & Power Project (IWPP), Bahrain.

Client : GDF Suez, France

G/T 4 X 201MW; S/T 2 X 272MW (CCPP, Natural Gas)

Responsibility:

Planning & monitoring of Piping and Steel Structure / Supports fabrication, Erection & Hydro testing of UG piping (Circulated Cooling Water, Heat Exchanger, Gas Connection Facility, Sea Water Intake area) and AG piping (GTG #1, GTG #2 area) of Power Block and Desalination area (Dual Media Filter, Cartridge Filter, Coagulation & Flotation Chamber, RO Building).

Lead the entire Fabrication, Erection & Pneumatic testing of UG Piping of GCF facility (18” & 20” Line); Coordination with BAPCO for OSBL Piping & Pigging Launcher Erection in GCF

BOP (Fuel tanks, Fuel treatment, Fuel Oil Unloading Station, Water treatment, Compressed Air system) Mechanical, Piping & Structural Erection (250T) Work.

Lead the entire team for GRE-FF(UG) line Hydro testing, Trouble Shooting in Leakage; Reinstatement Clearance for hydrant & valve erection.

Involved in erection of equipments, vessels and piping of the systems like Water treatment plant and Circulating Cooling Water system and CHP.

Co-ordination with vendors & Engineering team to resolve the engineering issues.

Overseeing proper and qualitative execution of work.

Ensuring adherence to quality standards of incoming finished & raw materials and components.

Looking after the fabrication, erection, testing and rubber lining of tankages and related pipelines in water treatment plant.

Involved in Commissioning of Water treatment plant, Circulating Cooling Water System and CHP.

Preparing and managing work schedules, MOM, MIS reports like daily & weekly progress report, field quality plans and protocols.

Maintaining the records of commissioning protocols, Pre commissioning checklists and P&IDs of the systems after being signed by the client and the consultant.

From Dec’05 – Jun’09 with S.K.Engineering & Construction Co., Ltd as Piping Supervisor

Deputed by Dong-Il Industries, Kuwait

Project : 1) KOC FMP, up gradation of GC

2) Kuwait Paraxylene Production Company (KPPC), Kuwait

Client : Bechtel, USA; PIC

829,000mt of Paraxylene & 393,000mt of Benzene

Responsibility:

Overseeing project planning and erection of Alstom GT13E2 Gas Turbine, Heat recovery Steam generator, Water-Steam Cycle equipment, supervising entire recruitment for power plant modifications & technical up gradations for power plant.

Allocation of job to supervisor and day to day hiring according to the requirement.

Maintaining the records for efficient execution and coordination.

Responsible for review of mark-up P&ID’s, test package and Preparation of Mechanical Completion report.

Ensure that execution of the Project leads to ultimate client satisfaction.

Overall execution & supervision of work assigned by superiors and seniors.

Allocation of job to supervisor and day to day hiring according to the requirement.

Maintaining the records for efficient execution and coordination.

Responsible for review of mark-up P&ID’s, test package and Preparation of Mechanical Completion report.

Inspecting incoming materials like pipe, pipe fittings, flanges, valves and steels.

Responsible for studying GAD and Isometric Drawings; involved in piping spool fabrication, erection and supporting as per standard.

Actively involved in preparing Hydro testing circuit and hydro testing procedures.

Supervising project activities and handling the complete cycle of the project management entailing requirement estimation, final execution, and final documentation of oil and gas projects.

Coordinating with the QA/QC department in the early and easy completion of NDT and with the design department and the construction site for solving design discrepancies.

From Jun’03 – July’05 with S.K.Engineering & Construction Co., Ltd as Piping Supervisor

Deputed by Sung Do Engineering LLC, Kuwait

Responsibility:

Conforming to all design standards and requirements by using specifications, conventional engineering practices, and company standards and procedures in the fabrication and erection of piping components.

Preparing man-hour and resource plan, engineering document and drawing schedule, activity list, etc.

BOQ and Billing Study of Isometrics and P&ID drawings.

Interfacing among client, sub contractor and consultant-designer for smooth process efficiency.

Reviewing project details, technical proposals, equipment layout plans deviation list, etc.

Ensuring piping and ducting, fabrication and erection, including insulation in time

Ensures assigned construction operations and subcontractors performance are in compliance with specifications and with high level of refinery safety requirements.

Reporting, Preparation of execution reports and comparison of weekly and monthly progress.

Coordinates and directs construction installation activities for all piping disciplines.

PROFESSIONAL QUALIFICATION

________________________________________

Bachelor of Science

India

IT SKILLS

________________________________________

Windows & Office tools

MS Office Tools

PERSONAL DETAILS

________________________________________

Date of Birth : 01st June 1982

Passport Number : Z - 1844476

Address : Sakhwania (Bandhuchhaper) Kushinagar - 274402, State – U. P, India.

Languages Known : English and Hindi



Contact this candidate