LYNYRD MORALEZ

*** ********** ** *** ******* TX 78228 | 210-***-**** | *************@***.***

SUMMARY

LOOKIN FOR LONG TERM EMPLOYMENT, PREFEREBLY IN TEXAS. PARTY CHIEF THAT HAS EXPERIENCE IN EVERY ASPECT OF PIPELINE SURVEYING. ABLE TO TALLY PIPE, DRAW UP MAINLINE NOTES, SHOOT IN MAINLINE, OBSERVE AND RECORD TIE INS, OBSERVE AND RECORD BORES, AND STAKE MORE THAN A MILE A DAY OF CONSTRUCTION STAKING. SURVEYED IN MULTIPLE STATES, SURVEYED THRU VARIOUS TERRAINS, AND WORK IN ALL WEATHER CONDITIONS. EXCELLENT FIELD NOTES. OFTEN WAS REQUESTED TO DRAW AND RECORD NUMEROUS WELL PADS AND ANY VALVE FABRICATION. HAVE CREW READY AND WILLING TO TRAVEL. IMAN AND RODMAN

SURVEY SKILLS

COURSES

• DRAFTING AND COMPUTER DRAFTING CLASSES TAKEN IN HIGHSCHOOL. ABLE TO DRAW IN 2 DIMENSION AND 3 DIMENSION. 4 MONTH WELDING COURSE TAKIN WHILE IN MILITARY. ABLE TO READ BLUEPRINTS. UNDERSTAND MATERIAL LIST. NATURAL ARTIST FIELD NOTES AND HANDWRITING ARE LEGIBLE AND NEAT.

Software

• INTRODUCTION TO TRIMBLE GEOMATICS OFFICE.

EXPERIENCE

DEC 2006-MAR 2007 RODMAN, GOLDEN FIELD SERVICES

• TRAVEL TO CONWAY ARKANSAS. CONSTRUCTION STAKE WORSPACE AND CENTERLINE FOR PIPELINE ASBUILT. CARRY LATHE BAG, FLAGGING, PAINT AND EQUIPMENT NEEDED AS RODMAN. MARK, FLAG, AND POUND LATHES AS NEEDED TO MARK BOUNDARIES OF PIPELINE. PROMOTED TO INSTRUMENT MAN FEBRUARY. RUN GPS R6 TRIMBLE TO LOCATE AND SHOOT WKSPC AND CL AT PI’S AND EVEN STATIONS. OCASSIONALLY SET CONTROL FOR TOTAL STATION. RUN TOTAL STATION WERE OVERHANG WOULD BLOCK SATELITES. TRAVERSE WITH TOTAL STATION MARKIN BOUNDARIES. CHECK IN AND OUT VIA CONTROL SET WITH GPS.

APR 2007-JUN 2007 IMAN, GOLDEN FIELD SERVICES

• TRAVEL TO ROSWELL NEW MEXICO. TWO MAN SURVEY CREW DESIGNATED TO STAKE CHECK AND RECORD FABRICATION OF FOUR LAUNCHER RECEIVERS. LOCATE EXISTING PIPELINE AND MARK CUT FOR LAUNCHER RECEIVERS. MARK OVERBEND, VALVES, TEES, SUPPORT SPANS, LAUNCHER LOCATION, AND SAG GOIN BACK INTO EXISTING PIPELINE. STAKE NEEDED LOCATIONS AND SET OFFSET REFERENCE POINTS. STAY IN CONSTANT CONTACT WITH CONTRACTOR TO ENSURE PLACEMENT OF FABRICATION IS CORRECT. ONCE FABRICATION IS ASSEMBLED. RED LINE ALIGNMENT SHEETS. GATHER AND RECORD ALL MANUFACTURERS INFO VIA PARTS LISTS. ACCOUNT FOR EVERY PART USED ON FABRICATION. MAKE HAND COPIES OF ALL LABELS ON VALVES. CHECK LENGTHS AND ELEVATION ON FABRICATION. STAKE, OBSERVE, RECORD, AND REDLINE FOUR LAUNCHER RECEIVERS.

JULY 2007-NOV 2007 IMAN, GOLDEN FIELD SERVICES

TRAVEL TO PHOENIX, AR. STOP FOR WEEK. FIX CHANGES TO PIPELINE PRELIM THRU SUBURB. TRAVEL TO PORTLAND OR. TAKE SAFETY COURSES FOR ENBRIDGE GAS COMPANY. BEGIN PRELIM THRU MOUNT HOOD NATIONAL FORREST. TRAVERSE DOWN RIDGELINE SURVEYING PROPOSED PIPELINE. INCLINE TO STEEP FOR TOTAL STATIONS. USE GPS WITH NO FIXED POSITION AVAILABLE. WAIT FOR 5 L2 SATELITES OBTAINED AND LOW PDOP TO RECORD DATA. TRAVEL ONE HOUR TO FORREST THEN ONE HOUR TO TOP OF MOUNTAIN. WALK IN WITH SUPPLIES AND OUT EVERYDAY. ONE ROUTE IN SO FURTHER SURVEY ADVANCED LONGER WALK IN AND OUT WAS FURTHER DAILY. STARTED AT SUMMIT 6500FT AND TRAVERSED TO BOTTOM OF MOUNTAIN 1500FT. FACED STEEP AND DANGEROUS TERRAIN. 70 DEGREE INCLINE DOWN RIDGELINE MOST LOCATIONS. NOVEMBER TRAVEL BACK TO PHOENIX, AR. LOCATE EXISTING PIPELINE AND MARK WERE SANDBAGS NEEDED TO WEIGH DOWN RISING PIPE.

NOV 2007-MAR 2008 IMAN, GOLDEN FIELD SERVICES.

TRAVEL TO MCALLISTER, OK. PRELIM 55 MILE PIPELINE ROUTE FOR 24 INCH PIPE. SET CONTROL FOR ENTIRE JOB. ALSO SET AERIAL MARKERS FOR FLYOVER OF PIPELINE. TWO CREW PROJECT. PRELIMED 27 MILES OF 55.

APR 2008-JULY 2008 IMAN, GOLDEN FIELD SERVICES

TRAVEL TO GREELY COLORADO. BEGIN CONSTRUCTION STAKING FOR 36 INCH PIPELINE. STAKE TWS AND CL. BEGIN ASBUILT PHASE OF PROJECT. SHOOT IN MAINLINE. ENTER IN INFO INTO COLLECTOR. MAKE SURE DATA CORRESPONDS WITH NOTES TAKIN BY PARTRY CHIEF.

JUL 2008-SEPT 2008 IMAN, GOLDEN FIELD SERVICES

TRAVEL BACK TO MCALLISTER, TX. ASSIST IN PRELIM OF GATHERING SYSTEM. MAKE SURE PIPELINE ROUTES WERE POSSIBLE. NO OBSTACLES IN ROW. MOVE AS NEEDED.

SEP 2008- DEC 2008 IMAN, GOLDEN FIELD SERVICES

TRAVEL TO MORRIS, ILLINOIS. ASSIST IN ASBUILT OF 30 INCH PIPELINE. TASK INCLUDED WATCHING TIE IN CREW. CHECK FOR PROPER COVER OF PIPE. RECORD AND TALLY PIPE INFORMATION. SHOOT IN TIE INS WITH R6 TRIMBLE GPS EQUIPMENT.

JAN 2009-JUNE 2009 IMAN, GOLDEN FIELD SERVICES

TRAVEL TO ATOKA, OKLAHOMA. CONSTRUCTION STAKE TWS AND CL. BEGIN ASBUILT. ASSIGNED TO SHOOT IN MAINLINE. USE 100FT STEEL CHAIN TO MEASURE PIPE AND CARRY STATIONS FORWARD. CHAIN ENTIRE 55 MILE PROJECT. DRAWING UP MAINLINE NOTES.

JUNE 2009-FEB 2010 PARTY CHIEF, GOLDEN FIELD SERVICES

BEGIN CONSTRUCTION STAKING TWS AND CL. TRAVEL TO SWAMPS AND QUAGMIRE TO SET LIMITS. TASK ON ASBUILT WAS TO FOLLOW POT HOLE CREW LOCATING FOUR PARRALLELING LINES. RECORDING AND SHOOTING IN LOCATIONS OF EXPL’S. TALLY 42 AND 20 INCH JOINTS. RECORDING INFO AS GATHERED. TURN IN TALLY SHEETS.

FEB 2010-JUN 2010 LAID OFF

JUN 2010-DEC 2010 PARTY CHIEF, TOPOGRAPHIC

TRAVEL TO FREER, TX. ASSIST IN PRELIM TO 87 MILE LINE IN THICK BRUSH OF SOUTH TEXAS. AFTER PRELIM RUN A CREW SHOOTING IN TIE INS. MARK DITCH LINE, GATHER PIPE INFO, CHECK COVER, SHOOT AND RECORD TIE INS.

JAN 2011- JUN 2011 PARTY CHIEF, TOPPOGRAPHIC

TRAVEL TO HALLETSVILLE, TX. RUN A CREW STAKING CL AND TWS. START DRAWING UP MAINLINE HEADING SOUTH ON PIPELINE. TWO MAINLINE CREWS ASSIGNED TO PIPELINE. ONE FROM SOUTH ONE FROM NORTH. WATCH AND ASSIST ON NORTH END OF PROJECT. DRAW UP MAINLINE NOTES, WATCH TIE INS, AND OBSERVE ROAD BORES.

JUN 2011- DEC 2011 PARTY CHIEF, TOPOGRAPHIC

ASSIST IN VARIOUS JOBS IN SOUTH TEXAS LAREDO AREA. PRELIM NUMEROUS ROUTES AND STAKE WKSPC AND CL AS NEEDED. IN CHARGE OF SEVERAL SMALL LINES. STAY IN CONTACT WITH ROW AGENTS. STAY IN CONTACT WITH PROJECT MANAGERS. BOUNDARY SURVEY COMPLETED ON MULTIPLE PROPERTIES. SET CONTROL AS NEEDED. RECORD DATA IN FIELD BOOKS. SCAN AND EMAIL DATA EVERY NIGHT. REPORT TO SUPERVISOR DAILY.

JAN 2012-APR 2012 PARTY CHIEF, TOPOGRAPHIC

ASSIGNED TO WATCH MAINLINE ON GARDENDALE TO 97 PROJECT. DRAW UP MAINLINE NOTES. THEN SHOOT IN MAINLINE. TURN IN DATA TO FIELD OFFICE. MAKE SURE ALL PIPE BACKFILLED IS ACCOUNTED FOR.

APR 2012-AUG 2012 PARTY CHIEF, TOPOGRACHIC

ASSIGNED TO BE LEAD CHIEF ON LANCASTER TO OPPENHEIMER PROJECT. TWO LINES 6 AND 10 INCH. 17 MILES. CORRECT ALL INSSUES ON JOB ALREADY IN PROGRESS. CENTERLINE WAS STAKED ON CENTERLINE OF EASEMENET NOT OFFSET. CORRECT CENTERLINE TO BE DITCHED 5 FT RIGHT AND LEFT OF CL OF EASEMENT. WATCH AND ASSIGN TASKS TO OTHER CREWS. DRAW UP MAINLINE. SHOOT IN MAINLINE. WATCH AND OBSERVE TIE INS.MAKE SURE ALL DATA IS CORRECT. MAKE SURE OTHER CREWS ARE PROPERLY DOING THERE JOBS. TALLY CREW AND BORE CREW. STAY IN CONTACT WITH INSPECTORS. STAY IN CONTACT WITH IH-35 AND FRIO BORE ENGINEERS. BOTH BORES OVER 1500FT LONG.

EDUCATION

JAN 2000- MAR 2000 FOUR MONTH COURSE FOR BASIC METAL WORKER. ABERDEEN PROVING GROUNDS BALTIMORE, MD ARMY SCHOOL OF ENGINEERS.

OCT 1999-OCT 2003 ENLISTED IN UNITED STATES MARINE CORPS FOR FOUR YEAR TERM AFTER GRADUATING HIGH SCHOOL, [School]