Post Job Free
Sign in

Master Scheduler

Location:
Findlay, OH, 45840
Salary:
65/hr
Posted:
November 25, 2009

Contact this candidate

Resume:

ANDREW BRADLEY STEVENS

**** ****** **  Findlay, OH 45840  (h) 419-***-****  s) 419-***-****  ****************@*********.***

SUMMARY OF QUALIFICATIONS

Twenty (20) plus years of comprehensive strategic planning and scheduling experience, designated Master Planner – Managed singular projects in excess of $445 Million dollars – Designated Master Planner in numerous projects – Advanced Engineering degree with honors – Experienced in implementing and designing scheduling constraints & corresponding delay mechanisms - Experienced in preparing detailed Gantt charts, depicting Earned Value Analysis tracking –Experienced in managing multiple, simultaneous projects, applying individual Gantt chart analysis of complex DOD, and other related government and non-government projects

PROFESSIONAL EXPERIENCE

MANAGER, SCHEDULING & PLANNING (Contract Position)

AECOM January 2008 - Present

Taji Iraq;

Responsibilities:

Designed, implemented and monitored the progress and subsequent development of the Taji International Track & Wheel Deport. This was a comprehensive project in excess of $350 Million dollars, a one of a kind countrywide facility, with hundreds of individual “moving parts” and over thirty (30) separate projects and operations occurring simultaneously I tracked the daily development and subsequent delays with each project. In concert with this I preformed the following:

• Provided an initial assessment of resources necessary to monitor the various projects;

• Developed protocol procedures that identified systematic issues of importance. These were subsequently adopted by the client;

• Hired and trained support personnel, sufficient to coordinate daily activity;

• Developed Gantt charts corresponding with Earned Value Analysis;

• Provided separate (individual portfolio) charts on all projects. To include charting mechanisms, value analysis, progress pictures and delays, incident reports, change orders, etc. This portfolio report developed into, and adopted as the standard Project Management Operational PMO weekly report;

• Developed CADD technical applications, incorporating 3D models of the project(s) status. This basically provided a visual illustration to the government, affording them the opportunity to track the project visually, as well as on paper;

• Developed a standard application approach for identifying constraints that “triggered” delays;

• I was the lead liaison with the client, making presentations, explaining concepts and principals, and supervising a staff of (7) to (10) support planners

MANAGER, SCHEDULER & PLANNING (Contract Position)

New Concepts & H.J. Russell Co. (Contractor) April 2002 January 2008

Lima, Ohio

Responsibilities:

Initially retained to develop a comprehensive policy and procedure manual on the developmental processes of scheduling, and corresponding responsibilities in accountability. Advancement in the position later entailed implementing a viable “core” scheduling division that could meet the needs of the expanding company, of which the following was included:

• Develop a training program to teach a standardized application in project planning and “mapping” techniques, incorporating Gantt chart and earned value analysis fundamentals;

• Managed multiple design build projects, simultaneously;

• Implemented vendor “vetting” pricing. Developing a cost means portfolio for prices relating to materials;

• Lead liaison with clients. Providing comprehensive briefings;

• Developed “phase” in application charting, depicting progress, constraints, delays, predasuccessor(s) and successors;

MANAGER, SCHEDULER & PLANNING (Independent Consultant)

Findlay, Ohio May 1986 – April 2002

Responsibilities:

During this time period I was an independent consultant working for a variety of companies. These were significant companies, ELCO Corp and Valeo Engine Cooling etc. My role with these companies was inductive of a designing, and determining the current planning capabilities and mapping techniques employed. Specifically, I enhanced productivity, and streamlined the caliber of product being presented to the client. Key areas I developed and took responsibility for:

• All Gantt chart designing and mapping techniques and presentations;

• All training and staff development, relating to graph design and cost tracking;

• Centralized “focal” point in initial verses long term planning techniques and presentation;

• Coordinating multiple avenues of personnel,

• Designing and monitoring simulations government and private sector projects;

EDUCATION AND TRAINING

• Aquinas College: Masters in Management 1991

• Purdue University: Bachelor of Science in Industrial Engineering Technology 1982

• Certified as: Project Management Professional (PMP) 2009

• Certified in: Total Quality Management (TQM) 2009

• Certified in: Lean Management Techniques (LMT) 2009

• Reliance Technical Center: Reliance AC and CD Drives

• Allan Bradley Technical Center: A/B PLC 2 Trouble Shooting Programmable Logic Controllers

• Allan Bradley Technical Center: A/B PLC 2 Family of Programmable Logic Controllers

• IVY Tech: Geometric Tolerance

• IVY Tech: Hydraulic Systems and Maintenance

• IVY Tech: Total Quality Taguchi Experimentation

• Self Learned: Primavera P3 & P6, Microsoft Project 2007, Word, PowerPoint and Excel, Visio, Pro-Log



Contact this candidate