Post Job Free
Sign in

Project Manager

Location:
United States
Posted:
September 16, 2012

Contact this candidate

Resume:

Curriculum Vitae of Muller Wehmeyer

Mobile No: +*7 (0-83-416-****

Email: *********@*****.***

Personal Information:

Name Muller Wehmeyer

Date Of Birth 16 January 1963

Languages Known English, Afrikaans

Marital Status Married

E-Mail *********@*****.***

Mobile + 27 (0-74-691-****

House tel No + 27 (0-57-354-****

Current Address 344 22nd Avenue, Villaria, Pretoria

Permanent Address 61 Kalkkuil Avenue, Odendaalsrus, Welkom

Objective

I would like to pursue my career in a work environment that will utilize my technical and project management skills. I have 30 years experience in telecommunications and more than 20 years experience in managing projects.

Summary

• More than 20 years experience in managing telecommunication projects

• Expert on OSP, fibre floating, splicing and testing of fibre optics

• Survey and planning of fibre routes

• Equipment installation

Experience Summary

• Vast experience in OSP and ISP

• Build various fibre optic routes throughout Africa

• Build GSM sites complete

• Equipment installation

• Very strong knowledge of civils

Technical Skills

MS Project Create project schedules

Visio Create and update drawings on projects

Microsoft Power Point Yes

Site surveys Surveys of OSP and GSM sites

Splicing machines Can splice with various machines

OTDR Can test with various OTDR’s

Operating Systems Windows 2000/98/XP, Microsoft Power Point

Management of projects Manage OSP (incl. fibre) and ISP projects

Cost control Control the costs on a project and KPI’s

Reporting Daily, weekly and monthly reporting to head office and to the customer

Meetings Attend project meetings on behalf of company

Quotations Attend pre-tender meetings, do quotations

Right of Way’s Apply, control and sign off of ROW’s

Drawings Draw and update plans

Customer relations Liaise and advice with customer and sub-contractor on project

Procurement Assist Procurement Department and qualify sub-contractors

Management Skills • Project Integration Management – achieve customer deadlines.

• Project Scope Management – delivering the agreed outcomes of the project.

• Project Time Management – control performance to meet deliverables according to schedule.

• Project Cost Management – control the budget within the limits of the project specification.

• Project Quality Management – establish quality requirements and manage to ensure compliance.

• Project Human Resources Management – actively promote team effectiveness and productivity.

• Project Communications Management – implement strategy to provide regular reports.

• Project Risk Management – utilize risk management to minimize variations / deviations from agreed schedule.

• As-build plans and documentation

• Acceptances of projects•

Work Experience (Starting with last company)

Company Duration Position Reason for leaving

PM telecom Currently Manager Current

ZTE Sept 2011 to Dec 2011 PM Personal

Huawei Feb 2007 to Aug 2011 PM Better offer

ACT Dec 2006 to Jan 2007 PM Better offer

Own business Aug 2005 to Nov 2006 Owner Sold business

Siemens Feb 1991 to Jul 2005 PM Start own business

Telkom SA Jan 1983 to Jan 1991 Senior technician Advancing career and joined Siemens

Main projects completed

Siemens

Project East London Ciskei Telecommunications

Role Area supervisor

Team Size 60+

Description:

• Installation of duct and manhole system

• Hauling and jointing of copper cables

• Installation of overhead copper routes

• Local distribution

• EWSD equipment installation

• Telephone installation

• Maintenance of telecommunications network in Ciskei

• BOQ’s and BOM’s

• As-build drawings (straight line)

• Reporting to Area Manager

Siemens

Project Sun City

Role Area Manager

Team Size 60 to 120

Description:

• Planning of network

• Installation of duct and manhole system

• Hauling and jointing of copper cables

• Installation of overhead copper routes

• Local distribution

• EWSD equipment installation

• Telephone installation

• Maintenance of telecommunications network in Bophuthatswana.

• Construction of fibre route between Mogwase exchange and Sun City exchange.

• BOQ’s and BOM’s

• As-build drawings (straight line)

• Project meetings.

• Reporting

Siemens

Project Phokeng

Role Area Manager

Team Size 60 to 140

Description:

• Planning of network

• Installation of duct and manhole system

• Hauling and jointing of copper cables

• Installation of overhead copper routes

• Local distribution

• EWSD equipment installation

• Telephone installation

• Maintenance of telecommunications network in Bophuthatswana.

• Construction of fibre routes.

• BOQ’s and BOM’s

• As-build drawings (straight line)

• Project meetings.

• Reporting

Siemens

Project Mabopane

Role Area Manager/PM

Team Size 140+

Description:

• Planning of network

• Installation of duct and manhole system

• Hauling and jointing of copper cables

• Installation of overhead copper routes

• Local distribution

• EWSD equipment installation

• Telephone installation

• Maintenance of telecommunications network in Bophuthatswana.

• Construction of fibre routes

• BOQ’s and BOM’s

• As-build drawings (straight line)

• Manage sub-contractors

• Project meetings.

• Reporting

Team Size 60

Siemens

Project Malawi Southern Region Project

Role PM

Team Size 60

Description:

• Planning of network

• Installation of duct and manhole system

• Hauling and jointing of copper cables

• Installation of overhead copper routes

• Local distribution

• Equipment installation

• Telephone installation

• Construction of fibre routes.

• Manage and arrange ROW’s

• Manage sub-contractors

• BOQ’s and BOM’s

• As-build drawings (straight line)

• Project meetings.

• Reporting

Siemens

Project Swaziland Fibre Project

Role PM

Team Size 80

Description:

• Planning of network

• Installation of duct and manhole system

• Installation of overhead Fibre routes

• Equipment installation

• Floating and hauling of fibre

• Splicing of fibre

• Testing of fibre

• Manage and arrange ROW’s

• Manage sub-contractor

• BOQ’s and BOM’s

• As-build drawings (straight line)

• Reporting

• Project meetings.

Siemens

Project Telkom Dectlink Project

Role PM

Team Size 100+

Description:

• Planning of network

• Installation equipment

• Installation of antennas

• Installation of telephones

• Testing of network

• Manage sub-contractor

• BOQ’s and BOM’s

• Reporting

• Project meetings.

Siemens

Project Namibia Fibre Project

Role PM

Team Size 100+

Description:

• Planning of network

• Installation of duct and manhole system

• Installation of overhead Fibre routes

• Equipment installation

• Floating and hauling of fibre

• Splicing of fibre

• Testing of fibre

• BOQ’s and BOM’s

• As-build drawings (straight line)

• Manage sub-contractor

• Reporting

• Project meetings.

Siemens

Project SNO – Eskom and Transnet

Role PM

Team Size 100+

Description:

• Planning of network

• Installation of duct and manhole system from high voltage yard to containers

• Container installation

• Equipment installation

• Generator and rectifier installation

• Floating and hauling of fibre

• Splicing of fibre

• Testing of fibre

• Manage and arrange ROW’s

• BOQ’s and BOM’s

• As-build drawings (straight line)

• Manage sub-contractor

• Reporting

• Project meetings.

ACT

Project Rep of Congo – Celltel GSM Project

Role PM

Team Size 80+

Description: Took over the project from previous PM

• Re-Planning of 6 sites

• Correcting faults on towers, fencing and in containers

• Equipment installation

• Rigging of towers

• Manage sub-contractor and workers BOQ’s and BOM’s

• As-build drawings (straight line)

• BOQ’s and BOM’s

• As-build drawings (straight line)

• Reporting

• Sign off sites with customer

• Project meetings.

ACT

Project Madagascar GSM Project

Role PM

Team Size 80+

Description:

• Planning of sites

• Construction of roads to sites

• Construction of cellular sites (fencing, generators, containers)

• Equipment installation

• Tower foundations

• Rigging of towers

• Manage sub-contractor and workers

• BOQ’s and BOM’s

• As-build drawings (straight line)

• Reporting

• Project meetings.

Huawei

Project Malawi Northern Region Project

Role PM

Team Size 160+

Description:

• Planning of network

• Installation of duct and manhole system

• Hauling and jointing of copper cables

• Installation of overhead copper routes

• Local distribution

• Equipment installation

• Telephone installation

• Construction of fibre routes.

• Manage and arrange ROW’s

• BOQ’s and BOM’s

• As-build drawings (straight line)

• Manage sub-contractors

• Reporting

• Project meetings.

Huawei

Project MTN Southern Gauteng Fibre Ring

Role PM

Team Size 200+

Description:

• Planning of network

• Installation of duct and manhole system

• Equipment installation

• Construction of fibre routes.

• Floating of fibre

• Splicing of fibre

• Testing of fibre

• Manage and arrange ROW’s

• BOQ’s and BOM’s

• As-build drawings (straight line)

• Manage sub-contractors

• Project meetings.

• Reporting

Huawei

Project MTN Northern Gauteng Fibre Ring

Role PM

Team Size 200+

Description:

Took over the project from previous PM

• Re-planning some of network

• Re-installation of damaged ducts and correct manholes

• Drill rivers

• Retest all ducts

• Floating of fibre

• Splicing of fibre

• Testing of fibre

• Manage and arrange ROW’s

• BOQ’s and BOM’s

• As-build drawings (straight line)

• Manage sub-contractors

• Project meetings.

• Reporting

Huawei

Project NLD 2

Role PM assisting bidding teams and surveys

Team Size 20

Description:

• Attend bidding meetings.

• Assist with technical knowledge on the bidding process

• Do surveys

• Contact with customer regarding network

• Oversee network design

• BOQ’s and BOM’s

• Assist with procurement

• Reporting

Huawei

Project Zimbabwe to RSA Liquid Fibre Project

Role PM

Team Size 150+

Description:

Linking Harare in Zimbabwe to Musina in South Africa.

• Planning of network

• Installation of duct and manhole system

• Equipment installation

• Construction of fibre routes.

• Floating of fibre

• Splicing of fibre

• Testing of fibre

• Manage and arrange ROW’s

• BOQ’s and BOM’s

• As-build drawings (straight line)

• Manage sub-contractors

• Project meetings.

• Reporting

Huawei

Project FiberCo, Pacs and other projects

Role PM assisting bidding teams

Team Size 20

Description:

• Attend bidding meetings.

• Assist with technical knowledge on the bidding process

• Do surveys

• BOQ’s and BOM’s

• Contact with customer regarding network

• Reporting

ZTE

Project FiberCo Project

Role PM

Team Size 20

Description:

• Complete project schedule

• Assist with personal and technical knowledge of the project

• Do surveys

• BOQ’s and BOM’s

• Contact with customer regarding network

• Reporting

PM Telecomms

Project Telkom

Role Manager

Team Size various

Description:

• Do Telkom maintenance on copper and fibre routes

• Build new OSP routes

• Do surveys

• BOQ’s and BOM’s

• Contact with customer regarding network

• Reporting

Academic Credentials

Course Year Institution

Matric 1981 PW Botha Technical High School

Telkom Technician 1984 Milnerton Technical College (Telkom)

Other Courses Completed

Course Year Institution

Intro to Optic Fibre 1996 5Th Dimension Technologies

Optic Fibre sub-system design 1996 5Th Dimension Technologies

Optic Fibre installation and commissioning

1996 5Th Dimension Technologies

Exfo OTDR 1996 Siemens Training College

Siemens XPS splicing machines 1996 Siemens Training College

SDH installation and commissioning 2000 Siemens Training College

Airspan installation 1999 Siemens Training College

Walkair installation 1999 Siemens Training College

Dectlink (OAM) 1998 Siemens Training College

Project Management 1995 Siemens Training College

Computer Courses Completed

Course Year Institution

Visio 2007 2007 Huawei

Excel Advanced 1998 Siemens Training College

Project Essentials 2000 Siemens Training College

Microsoft Power Point 1998 Siemens Training College

MS Project 2000 Siemens Training College

Main responsibilities

• Establish project objectives, analyzes the project proposal and collaborates with the management.

• Establish project plan; determines time frame, funds and staffing; establish the project schedule.

• Develops planning and control methods and procedures.

• Commensurate with the nature and scope of work in project implementation, demonstrates them to project engineers and ensures their application.

• Selects and trains staff members, and assigns responsibilities.

• Acts as an arbitrator at site to solve problems arising among project engineers.

• Establish project’s budget, schedules and analyzes variances and initiates corrective actions.

• Approves and implement project specifications.

• Analyzes product design, customer requirements and performance standards and authorizes technical studies.

• Ensures that all permissions required for the execution of the work are available and valid.

• Determines feasibility of the projects; identifies and forecasts costs and requirements.

• Confirms product requirement, establishes standards and tests requirements

• Controls project plan and approves design, specifications, plans and schedule changes.

• Prepares project status reports, collects, analyzes and summarizes information and trends.

• Procurement and logistics

• Compile BOQ’s and BOM’s.

References

Name Position Company Contact Details

Koot Botha PM MTN +27 (0-83-212-****

David van Staden Director ACT +27 (0-83-380-****

Chen Hui PM Huawei +27 (0-83-354-****

Charles Cloete PM ZTE +27 (0-82-340-****



Contact this candidate