VINCENT L. RAMIREZ
Pearland, Texas **584
Hm: 832-***-****
Email: ********@*****.***
EDUCATION: South Houston High School
Houston Community College
Drafting Design/AutoCAD, Certificate
Intro. Manual Drafting, Pipe Design and Basics
Cadworx, Autoplant (Rebis), Inventor,
Unigraphics, Pro-e and Soliworks software.
University of Houston
Pasce/Plantview & Plantview/Database
STRENGTHS: Teach Autoplant (Rebis) & Inventor
3D Plant, Skid Equipment, Pipeline and Offshore Knowledge
Ambitious, Hardworking, Organized, responsible & self-starter
Organized, responsible & Enjoy helping co-workers
EXPERIENCE: TAS Inc. - MAR '09 to Present
Model Skid equipment and layout systems from P&ID’s. Create models of Piping layouts and power plant equipment, compressors, meter skids for on shore skids and marine units. Design and detail pipe and structural drawings and mange library parts for Solidworks and setup assembly model management & training software and using Solidworks, Cadworx & AutoCAD.
Alliance Engineering Inc. - MAY 2007 to MAR. 2009 (Contract)
2D, 3D & Training & Checking Piping layout, skid equipment and pipe rack creating drawings and Iso’s. Model pump skids, arrangement drawings, piping layout, piping plan’s and skid layout. Model structural skid and electrical supports enclosures, pig launcher and compressor stations. Detailing drawings, piping layout, piping plans, Iso’s and skid layout using Autocad, Solidworks & Cadworx.
GE POWER SYSTEMS - MAY '99 to May. 2007
Gas turbine, Pipeline Tie-in and layout for Power plant, compressors, meter
skids and forwarding skids and marine units. Design ISO's, Equipment
Arrangement's, Checking Piping, Piping Plan's, Equipment, Parts library, Enclosures and Skid layout, Structural & Mech. Design using 3D cad software using Soldiworks, Inventor and Cadworx.
CDI ENGINEERING - FEBUARY '98 to MAY 99 - (CONTRACT)
Petro chemical Design ISO's, Equipment Arrangement's, Piping Plan's and
Piping drawing’s, Using FLEXCAD ISO, PIPE & MICRO-STATION
S&B ENGINEERING - JANUARY '98 to MARCH '98 - (CONTRACT)
Petro chemical Design ISO's, Equipment Arrangement's, Piping Plan's and
Piping drawing’s, Using Pro Flow, Pro Pipe & Flex-cad.
PCI ENGINEERING - SEPTEMBER '97 to JANUARY '98 -(CONTRACT)
Petro chemical Design and Pipeline Design compressor station, ISO's, Equipment
Arrangements, Piping Plan's and Piping drawing’s, Using Pro-pipe, Rebis & Flex-cad.
ENERCON ENGINEERING - August '96 to NOVEMBER '97
Offshore platform Design Equipment, Skid Piping and Pipe Plan
Drawings. PASCE Building Equipment, Piping and Structure.
DOW CHEMICAL - January '96 to July '96 - (CONTRACT)
Petro Chemical Design and Build 3D model Equipment, Routing Pipe,
Setting up Catalog & Building Spec. Items Database using Pasce.
ENERCON ENGINEERING - March '94 to January '96
Offshore Design P&ID's, Flow sheet’s, ISO's, Equipment Arrangement's and
scrubbing Piping drawings. Also PASCE NT building equipment, routing pipe
and setting up catalog.
ENERCON ENGINEERING – Feb. '93 to March '94 - Drafting Clerk and Trainee -
Responsible for the day to day operations of the reproduction department, include the shipping and expediting of all reproduction work. Active in drawing P&ID'S, PFD'S,Equipment Arrangements and Structural drawings using AutoCAD.
REFLANGE INC. - July'92 to February '93 - HELPER and Machinist Trainee -
Travel out in the field for all types flanges. Also some retap and rebore bolt holes for flanges, headers and man way’s.
REFERENCES: Available upon request.