¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬Pablo Diaz
Address Houston Ph. 713-***-****
Loma Escondida 1001 Home 011-52-814-040-6646
Mitras Pte. Secc. Salvatierra Cell 011-52-811-***-****
Garcia, NL mexico 66023 Email *******.****@*****.***
Job Title
Sr. Piping designer
Education
High school
2002-2005 Alvaro Obregon Monterrey, NL Mexico
Tres Caminos, 67190 Nuevo León, Mexico
Languages
Spanish (Native) & English (Fluent)
Training Courses Kellogg Brown & Root de Monterrey Monterrey, N.L. Mexico
PDS
Kellogg Brown & Root Houston, TX USA
Process plant layout by Roger Hunt
Bufete Industrial S.A. de C.V. Veracruz, ver. Mexico
MicroStation V5
A.U.VER. S.A. Veracruz, ver. Mex.
Introducing Piping Design by Grupo Lanzagorta.
Valves by Grupo Lanzagorta.
Career highlights
Extensive experience relating to piping design,, layout, design,field trouble shooting during construction
3D piping designer in Oil, Gas, Water, LNG Terminals, Petrochemical Facilities, , Platforms, Fire Protection in domestic and international projects for U.S., Mexicoand Middle East, (Pulp and Paper, Power nuclear plants and Shipbuilder in Mexico only)
Advanced skills in use of PDMS PDS, Microstation and CADD technologies for the engineering and design positions
Participating in field group on rapid rebuild and deployment of engineering services to catastrophic events due to equipment failure or process disruption
Acting as a PDMS instructor to help the trainees to improve their skills such as operate the PDMS in a faster way, take shortcuts and typing commands.
Design and Drafting skills set
Perform the three dimensional (3D) design using AVEVA Plant Design Management System (PDMS). The 3D model AVEVA 3D basic design information of disciplines, such as equipment, piping, and structure.
Perform the three dimensional (3D) design using Intergraph Plant Design System (PDS). The 3D model integrates 3D basic design information of disciplines, such as equipment, piping, and structure.
MTO take off
Preparation of as-built drawings
Advanced skills in use of PDMS PDS, and Microstation
Preparation of detailed piping route design
Check all detail design drawings before submitting for approval.
Prepare documents for delivery
Piping Orthographic Design and Layout
Field Eng. and Design Trouble Shooting
Piping Isometric production
Piping Drawing Development
Piping Support Development
P&ID Diagram interpretation
Plant and Equipment Layout & Design
P&ID Walk Down Verification
P&ID Demolition Walk Down Verification
Work according Engineering Standards such as ASME, ANSI, DIN
Project Tracking and Progress Reporting to supervisor
Computer skill set
-Microsoft Office 2007 (current)
-Microsoft Office 2003
-Intergraph PDS
-Aveva PDMS (Good skills for MDS application)
-Microstation V5 amd Microstation J
Career Summary
Piping designer
Kellogg Brown Root
(May/2011–Mar/2012)
Office location: Monterrey, NL. Mexico
Job description:
Responsible for the 3D PDMS piping modeling, pipe supports, interference check, and ISO extraction coordination. Working close with Process, Structural, Instrument and Electrical departments during the design of Drilling module, attending to design review sessions, solving model review comments.
Big Foot project
Offshore Rig location: US, Gulf of Mexico
(Client: Chevron)
Technip de Monterrey
(Dec/2010 –up to today )
Job title
Piping designer
Office location: Monterrey, NL Mexico
Job description:
In charge of update modeling of equipment, isometric drawing production in PDS
Refinery SRU Salamanca.
Plant location: Salamanca, Gto. Mexico
COPESA
(Aug//2010 – Sep/2010)
Job title
Piping designer
Office location: Coatzacoalcos, Ver. Mexico
Job description:
Development of storage tanks farm for Clariant refinery in Coatzacoalcos Ver.
This area and some others were dismounted in Cuernavaca, Mor. And will be installed in Coatzacoalcos Ver.
Plant location: Coatzacoalcos, Ver. Mexico
M-TEC M-TEC Macomb Community College
(Jul/2009 – Jul/2009)
College location: Warren, Mi. U.S.A
Job description:
Acted as a 3D PDMS instructor with a class in M-TEC community college, answering questions, helping the trainees to solve trouble shooting, clarify the trainees concerns, improve the performance of the class and increase the velocity of the group
Temporary job in M-TEC Macomb Community College
Warren, Mi U.S.A.
AMEC
(Mar/2009 –Jun/ 2009)
Office location: Houston, TX. U.S.A
Job description:
Responsible for the 3D PDMS piping and equipment modeling, pipe supports, interference check, and ISO extraction coordination with Process, Structural, Instrument and Electrical departments during the design of multiple proposals for Produced Water module in Kizomba FSPO in order the client chose and approved the best proposal
Kizomba Satellites project
FPSO location: Angola, Africa
(Client: Exxon-Mobile)
Kellogg Brown Root
(May/2008 –Mar/ 2009)
Office location: Houston, TX. U.S.A
Job description:
Responsible for the 3D PDMS piping and equipment modeling, pipe supports, interference check, and ISO extraction coordination with Process, Structural, Instrument and Electrical departments during the design of topsides utilities modules
PazFlor project
FPSO location: Angola, Africa
(Client: Total, DSME)
Kellogg Brown Root
(Mar/2008 – May/2008)
Office location: Houston, TX. U.S.A
Job description:
Responsible for the 3D PDMS fire protection, deluge systems and safety equipment modeling, pipe supports, interference check, and ISO extraction coordination with Process, Structural, Instrument and Electrical departments in all topsides modules for Pazflor FPSO
FPSO location: Angola, Africa
(Client: Total, DSME)
Kellogg Brown Root
(Jul/2007 – Mar/2008 )
Office location: Houston, TX. U.S.A
Job description:
Responsible for the 3D PDS piping and equipment modeling, pipe supports, interference check, and ISO extraction coordination with Process, Structural, Instrument and Electrical departments during the design of main pipe rack and finger pipe racks in Benzene unit
Saudi Kayan Complex project
Plant location: Al-Jubail Saudi Arabia
(Client: Saudi Kayan Petrochemical Company)
Bechtel Corp.
(Oct/2006 –Jul/ 2007 )
Office location: Houston, Tx. U.S.A
Job description:
Responsible for the 3D PDS piping and equipment modeling, pipe supports, interference check, and ISO extraction coordination with Process, Structural, Instrument and Electrical departments during the design of main pipe rack and finger pipe racks in crude unit
Reliance project
Plant location: Jamnagar, India.
Kellogg Brown Root de Monterrey
(Jul/2006 –Oct/2006)
Office location: Houston, TX. U.S.A
Job description:
Responsible for the 3D PDMS fire protection, deluge systems and safety equipment modeling, pipe supports, interference check, and ISO extraction coordination defining of fire areas and scope of work with safety and process safety engineers
SKIKDA project
Plant location: Algeria, Africa
(Client: Gassi Touil)
Kellogg Brown & Root de Monterrey
(Jan/2006 –Jul/ 2006)
Office location: Houston, TX. U.S.A
Job description:
Responsible for the 3D PDMS fire protection, deluge systems and safety equipment modeling, pipe supports, interference check, and ISO extraction coordination with Process, Structural, Instrument and Electrical departments in all modules in Tombua Landana offshore rig.
Tombua Landana project
Platform location: Angola, Africa.
(Client: Chevron)
Kellogg Brown & Root de Monterrey
(Jan2005 – Dec/2005)
Office location: Houston, TX. U.S.A
Job description:
Responsible for the 3D PDMS fire protection, deluge systems and safety equipment modeling, pipe supports, interference check, and ISO extraction coordination with Process, Structural, Instrument and Electrical departments in all topsides modules for AGBAMI FPSO
AGBAMI project
FPSO location: Nigeria Coast, Africa.
(Client: DSME / Chevron-Texaco)
Kellogg Brown & Root de Monterrey
(Jun/2004 – Jan/2005)
Office location: Monterrey, N.L.
Job description:
Responsible for the 3D PDMS fire protection, deluge systems and safety equipment modeling, pipe supports, interference check, and ISO extraction coordination with Process, Structural, Instrument and Electrical departments in all topsides modules for Greater Plutonium FPSO
Greater Plutonium project
FPSO location: Block 18 Angola Coast, Africa.
(Client: BP)
Kellogg Brown & Root de Monterrey
(Oct/2003 –Jun/ 2004)
Office location: Monterrey, N.L.
Job description:
Development of Super Sketch in PDS for Synfuel Catalytic Cracker
Synfuel Catalytic Cracker project
(Client: SASOL)
Kellogg Brown & Root de Monterrey
(Apr/2003 – Oct/2003)
Office location: Houston, Tx.
Job description:
Responsible for the 3D PDS piping and equipment modeling, pipe supports, interference check, and ISO extraction coordination with Process, Structural, Instrument and Electrical departments during the design of Ethylene unit
Bayou refinery Project
Plant location: Chocolate Bayou refinery TX.
(Client: BP Amoco)
Kellogg Brown & Root de Monterrey
(Jul/2002 – Mar/2003)
Office location: Monterrey, N.L.
Job description:
Responsible for the 3D PDS piping and equipment modeling, pipe supports, interference check, and ISO extraction coordination with Process, Structural, Instrument and Electrical departments in compressors area on planning stage
for SEGAS project
SEGAS project
Plant location: Egypt Africa.
Kellogg Brown & Root de Monterrey
(Jan/2002 –Jun/ 2002)
Office location: Monterrey, N.L.
Job description:
Responsible for the 3D PDS piping and equipment modeling, pipe supports, interference check, and ISO extraction coordination with Process, Structural, Instrument and Electrical departments in compressors area on planning stage
of revamp work for Low Sulfur Mogas project.
Beaumont refinery
Plant location: Beaumont refinery. Beaumont, TX
(Client: EXXONMOBIL)
Kellogg Brown & Root de Monterrey
(Feb/2001 –Dec/ 2001)
Office location: Houston, Tx. U.S.A
Job description:
Manual Drafting of piping isometrics and walk downs on field to rebuilt of K-resin
Plant in Styrene unit
K-resin plant Phillips Chevron chemical complex
Pant location: Pasadena, Tx.
(Client: PHILLIPS CHEVRON)
Kellogg Brown & Root de Monterrey
(Jul/ 2000–Jan/ 2001)
Office location: Monterrey, N.L. Mex.
Job description:
Responsible for the 3D PDS piping and equipment modeling, pipe supports, interference
check, and ISO extraction coordination with Process, Structural, Instrument and Electrical
departments during the design of 1-Hexene unit for Q-Chem complex
Q-Chem project
Plant location: Mesaieed industrial city, state of Qatar
(Client:))
Kellogg Brown & Root de Monterrey
(Feb/2000 –Jul/ 2000 )
Office location: Monterrey, N.L. Mex.
Job description:
Responsible for the 3D PDS piping and equipment modeling, pipe supports, interference
check, and ISO extraction coordination with Process, Structural, Instrument and Electrical
departments during the design of rundown tank farm & storage area
Prairie Rose, Joffre Alberta, Canada
Plant location: Alberta, Canada
(Client: BP AMOCO)
Kellogg Brown & Root de Monterrey
(Feb/1999 –Jan/ 2000)
Office location: Monterrey, N.L. Mex.
Job description:
1999 – 2000 Kellogg Brown & Root de Monterrey Monterrey, N.L. Mex.
Check of Piping Layouts, plot plans, & piping isometrics for Singapore Chemical
Complex
Plant location: Singapore
(Client: EXXON)
1989 – 1999 Bufete Industrial S.A. de C.V. Veracruz, ver. Mex.
Piping designer
Design of piping arrangement plans & piping isometrics in Nuclear Power Plant: Laguna Verde, unit 2 (Client: C.F.E.)
Field trouble shooting during construction of tubogenerator building in Nuclear Power Plant:Laguna Verde, unit 2
(Client: C.F.E.)
As-built in reactor building in Nuclear Power Plant: Laguna Verde, unit 2
(Client: C.F.E.)
Revamp piping arrangements in Petrochemical Plants: Naranjos, Cerro azul, ver. Poza Rica, Ver. & Matapionche, Ver. (Client: PEMEX)
Revamp piping arrangements in “Benito Juarez” Sugar Mill: E. Carranza,
(Client: G.A.M.)
1985 – 1989 A.U.VER. S.A. Veracruz, ver. Mex.
Draftsman / Piping designer
Manual drafting and design of Piping Layouts, plot plans, piping arrangements, manual drafting
of piping isometrics, Field trouble shooting during construction in Motor Vessels (Tankers): Nuevo Pemex I, Nuevo Pemex II, & Nuevo Pemex III
(Client: PEMEX)