Post Job Free
Sign in

Process Engineer

Location:
United States
Salary:
15 Dollar / hour
Posted:
March 01, 2011

Contact this candidate

Resume:

ROGELIO A. ROSETE Jr

*** ****. *** ***** *

San Pablo City Laguna, Philippines

E-mail: *********@*****.***

Contact number: +639*********

CAREER OBJECTIVE:

To actively participate in company operations in a way that enables me to contribute my skills and knowledge and provide an opportunity for professional development and career growth.

QUALIFICATION:

5 years experience as DLC coating and Etching Process Engineer in manufacturing industry in MR-Head Slider Fabrication. Posses’ leadership capabilities, self-driven, results-oriented, excellent team worker, efficient worker even under pressure, deeply committed to work.

9 years experience as DLC coating and Etching Process Senior Process and Production Technician in manufacturing industry in MR-Head Slider Fabrication.

WORK EXPERIENCE:

Process Engineer 3

Manufacturing Process Engineer Vacuum Process

TDK Philippines Corporation

119 East Science Ave. SEPZ, Laguna Technopark, Biñan, Laguna

March 2005 - Present

Responsible for the set-up and evaluation of new and transferred machines in vacuum process and assigned in special projects which aims to improve the process capability, yield and product quality. New Product and Process Introduction / Technological Development

Key Responsibilities and Accountabilities:

• Provides Leadership to two teams consist of (2) Engineers and (3 Technicians in sustaining suitable process conditions in the production line.

• Set-up process for new product introduction and established its Standard Operation Procedure and instructions.

• Conducted initial test and coordinated evaluation results of new machines, jigs and modern manufacturing technologies with overseas process development center and prepare technology transfer documents for local mass production application

• Design/Modify process methods, tools and equipment for improvement

• Optimization of the machine parameters to reduce process deviation

• Extensive work experience in new product introduction and special projects, process development, and yield improvement

• Increase the production yield through reduction of defects produced in the assigned process.

• Performs failure analysis and schedules action plans relevant to the designed corrective or preventive measures

• Generate and revise procedural documents and written instructions

• Handles new projects on qualification and pre-mass production stage

• Initiate presentation meetings for transfer of new process/methodology or equipment

• Provide orientation and training regarding new projects, equipment and process procedure

• Performs studies for Process or equipment improvements and feasibility

• Performs Evaluations on new methodologies, materials or equipment

WORK ACCOMPLISHMENTS:

Yield Improvement

• CCSF (Chip, Crack, Surface finish) Defect reduction, Optimized and Control material loading process and introduce new method of material transfer from material cleaning fixture to DLC deposition fixture which lead to the reduction of defect from 0.7% to 0.2%

• E21 ( DLC feel off) Defect reduction, Optimized cleaning machine and control contamination prior Si/DLC deposition which lead to the reduction of defect from 0.25% to 0.05%

• 09 (Wrong process) Defect reduction, Standardize DLC coating deposition procedure and training of operators which lead to the elimination of the defect from 0.3% to 0%

• R+ ,R-,X+,X- ( QST defect) Optimized Ion beam etching process which lead to the reduction of defect from 1.2% to 0.7%

• O10 (Broken Material) Defect reduction, Control material loading / material unloading process and introduce new method of material loading and unloading procedure which lead reduction of defect from 0.5% to 0.1%

Cost Reduction

• AK400 (Xenonlamp) Cost reduction, Optimized machine measurement result which lead to 65% cost reduction of xenon lamp in ellipsometer equipment machine.

• Tau-0746 (Rubber Sheet) Cost reduction increase usage of rubber by DLC coating of both side which lead to 50% cost reduction

Process and Productivity Improvement

• Implementation of DLC deposition process control KPIV – KPOV (Key process input/output value) set incoming monitoring procedure control OCAP for Si/DLC deposition process maintain and sustain the line.

• DLC process lead time improvement, Implementation of 1SB (single current block), Reduction of lead time from 2hrs to 1hr

• DLC rework reduction, Implementation of DLC fixture Altic spacer which lead to the reduction of rework from 3% to 0.5%

• Ion Beam Etching and DLC uniformity, Optimized IBE and DLC parameter which lead to the uniformity improvement from 15% to <10%

Personal Achivement

• Employee of the year 2006

• Selected employee of the company recreational committee

SEMINARS AND TRAININGS ATTENDED:

• Vacuum Machines Maintenance and principles - Fujitsu Nagano Japan

• ISO 9000 Quality Management Systems – Technical Training Dept., TDK Philippines Corporation

• ISO 14000 – Environmental Management Systems – Tech’l Training Dept., TDK Philippines Corp.

• ISO 18000 – Occupational Health and Safety Assessment System – TTD, TDK Phils. Corp.

• Total Quality Control – Technical Training Department, TDK Philippines Corporation

• Clean room Protocol – Technical Training Department, TDK Philippines Corporation

• Slider Fabrication and Head Gimbal Assembly Process – Technical Training Department, TDK Philippines Corporation

• Statistical Process Control (SPC) – Technical Training Dept., TDK-Fujitsu Philippines Corporation

• DOE using Taguchi Methods - Mike Fiester, TDK-Fujitsu Philippines Corporation

• FMEA (Failure Mode and Effects Analysis) - Technical Training Dept., TDK-Fujitsu Philippines Corporation

• Advanced ESD Control Seminar – Technical Training Dept., TDK-Fujitsu Philippines

Corporation

• Supervisory Skills Development Training - Technical Training Dept. TDK-Fujitsu Philippines

Corporation

EDUCATION :

Industrial Mechanics

Don Bosco College, Canlubang Calamba Laguna

Graduated July 1996

PERSONAL BACKGROUND :

• Date of Birth : August 17, 1976

• Place of Birth : Bocaue Bulacan

• Marital Status : Married

• Age : 34

• Height : 5’ 8”

• Weight : 165 lbs.

• Citizenship : Filipino

I hereby certify that the above information is true and correct to the best of my knowledge and belief.

Rogelio A. Rosete Jr.

Applicant



Contact this candidate