Post Job Free
Sign in

Project Electrical

Location:
Quezon City, NCR, 1100, Philippines
Salary:
4,000.00 Canadian $/month
Posted:
September 06, 2012

Contact this candidate

Resume:

JESUS C. GEMUDIANO

Curriculum Vitae

Position Applied: Electrical Supervisor/Superintendent

PERSONAL:

Filipino #5-Road 10, Floodway, Taytay, Rizal

Philippines

Married Birthday: Dec. 08, 1962

Birthplace: Guimaras, Philippines Tel. No: (+632) - 7313551

Mobile # : +966-********* (SAUDI ARABIA)

E-mail: *************@*****.***

PROFILE

Highly motivated with extensive Electrical Construction experience on Major construction Projects in all facets of industry: Oil & Gas; Petrochemical; Power Generation; Industrial, High Rise and Commercial Buildings (Philippines and Overseas) who offers to a new employer:

Strategic Management, Quality Assurance & Quality Control Expertise;

Directs, coordinates, results-oriented and exercises functional competence for the planning organizing, directing, controlling and integrating all function of “Project Management” for the completion of the project;

Accomplish pro-active Superintendent and professional development management, inspection and construction (PV-Solar Power System, Corrosion & Cathodic Protection, General Power Lighting, Fire Alarm, Telecom & Data, CCTV-Audio Video and Security System;

Surveying, inspection, testing, commissioning, analysis and technical problem solving talents;

Recognized for strong adherence to Safety, ability to work well as “Team Leader & Member” with exceptional work ethics and administrative proficiency;

Ability to liaise effectively at all level.

CORE COMPETENCIES AND PROFESSIONAL STRENGTHS

> Project Management and Personnel Oversight.

> Strategic Construction Management & Industrial HSE Compliance.

> Documentation and Report Preparation.

> PERT/CPM Project Scheduling and Planning.

> Material Management.

> Testing & Commissioning.

> Process Management & Quality Control.

> Cost Control, Value Engineering and Estimating.

WORK EXPERIENCE SUMMARY

Electrical Superintendent KSA Mohammad Al-Mojil Group

Electrical Supervisor Nigeria Daewoo Engineering & Construction

E&I QA/QC Inspector Libya Hyundai Engineering & Construction

Electrical Supervisor Philippines Ambit Trading & Technical Services

Electrical Foreman KSA Nesma Emcor Co., Ltd.

General Foreman/Supervisor Philippines Angel Interiors and Construction

Sr. Field Electrician Philippines Republic of the Phil.-Bureau of Telecom

PROFESSIONAL AFFILIATIONS

IIEE - Institute of Integrated Electrical Engineers of the Philippines (Manila Chapter)

GHQ/AFP – Armed Forces of the Philippines Reservist Association

QUALIFICATIONS & PROFESSIONAL LICENSE

Bachelor of Science in Business Administration (Major in Management)

Polytechnic University of the Philippines – Open University (Present)

Manila, Philippines

TRADE CERTIFIED:

Professional Regulations Commission (PRC)- Republic of the Philippines

Certified Registered Master Electrician (License Registration #: 21168)

Board Rating:

Page 1 of 4 pages

WORK HISTORY

21 Sept. 2006 to present

ELECTRICAL & INSTRUMENTATION SUPERINTENDENT

MOHHAMAD AL-MOJIL GROUP

Dammmam, Kingdom of Saudi Arabia

Jun-Aug 2012 : SABIC-SAHARA PETRO-CHEM HDPE REFINARY

Project Proponent: SABIC

Nitrogen Metering Station - Shut-down Project

Jubail, KSA

Apr-Jun 2012: YANBU EXPORT REFINARY

Project Proponent: DAELIM ENGINEERING

(Gasoline Package)Project, Yanbu, K.S.A.

2011-2012: KING ABDULLAH PETROLIUM SCIENCE & RESEARCH CENTER (KAPSARC)

Project Proponent: SK ENGINEERING & CONSTRUCTION

Housing & Community Center Project

Riyadh, Saudi Arabia

2010-2011 KING ABDULLAH UNIVERSITY OF SCIENCE & TECHNOLOGY (KAUST)

Project Proponent: SAUDI ARAMCO

Center for Marine & Ocean Engineering Research Center Project

Tual, Jeddah, Saudi Arabia

2009-2010 SABIC-SAMSUNG/KAYAN PETRO-CHEMICAL

Project Proponent: SAMSUNG ENGINEERING & CONSTRUCTION

Low Density Polyethylene Project

Jubail, Saudi Arabia

2007-2009 ARAMCO/PETRO-RABIGH REFINING & PETRO-CHEMICAL

Project Proponent: SAUDI ARAMCO

Mono-ethylene Glycol & PO Projects

Rabigh, Saudi Arabia

2006-2007 ARAMCO/JUAYMAH REFINARY GAS PLANT

Project Proponent: SAUDI ARAMCO

NGL Project

Juaymah, Saudi Arabia

JOB DESCRIPTION:

> Manage and Supervision of Project execution including oversight of programs and three (3) weeks look ahead schedule. Participate in project management-client meetings. Responsible for assuring the execution of the project quality management system at site and specific project quality control plans. Repositioning of Project resources as fast as possible to ensure project timeline completion.

> Verify approved IFC drawings and associated installation detail prior for construction implementation

at site. Provide materials requirements at various stages of the fabrication/installation process as stated

in the technical specifications for installation.

> Ensure that surveillance inspections are conducted to verify processes and procedures compliance for

Implementation.

> Monitor Manufacturer’s/Subcontractor’s activities with respect to technical & quality performance.

> Liaison within the company related to Construction implementation and Quality Assurance. Auditing

And follow-up of corrective actions.

> Overall control and supervision for the implementation of construction technical and quality requirements, Lead or participate in resolution of technical construction problems at site and maintain

construction & quality records and documentation.

> Ability to motivate and supervise the complete team assigned to project and maintain close relationship with client.

30 Oct. 2005 to 30 Aug. 2006

ELECTRICAL SUPERVISOR

DAEWOO ENGINEERING & CONSTRUCTION

Nigeria Liquified Natural Gas (NLNG) Train 6 & 7 Expansion Project

Bonny Island, Federal Republic of Nigeria

JOB DESCRIPTION:

> Responsible for the execution and implementation of construction schedule, manpower loading and

resources allocation to construction site.

> Supervise every team related to technical installation processes.

> Directs, coordinates and exercises functional authority for planning, organizing,, directing, controlling

and integrating programs to fast track project completion. Assist and check the basis of installation in

conformity with design, specifications, data sheet, requisitions and codes as per project requirements.

Page 2 of 4 pages

26 Jul. 2004 to 04 Sep. 2005

ELECTRICAL & INSTRUMENTATION QA/QC INSPECTOR

HYUNDAI ENGINEERING & CONSTRUCTION

WESTERN LIBYA MELLITAH GAS PLANT

Natural Gas Line (NGL) NC41 Project

Libya

JOB DESCRIPTION:

> Responsible for conducting surveillance and inspection duties for electrical and instrumentation works

& ensure efficient recording and maintain QA/QC records and documents.

> Review all relevant documents; materials certificates and Non-conformance report & review all internal request for inspection as per schedule work priorities and proceed with the quality inspection as required.

13 Oct. 2003 to 30 Jun. 2004

ELECTRICAL SUPERVISOR

AMBIT TRADING & TECHNICAL SERVICES

PHILIPPINE NATIONAL POWER CORPORATION

Macban Geothermal Plant Rehabilitation Project

Laguna, Philippines

JOB DESCRIPTION:

> Responsible for the set-up of Project’s Temporary facilities, planning, organizing/controlling monitoring and direct supervision of electrical & instrumentation works as per project specifications related to: Power Transformer installation, Cable Pulling, General Power, Lighting, Lightning Protection system, installation of Field Instruments/Transmitters and Junction Boxes, Testing Start-up and Pre-commissioning prior for hand-over to Client/Proponent.

04 Feb. 2000 to 15 Sep. 2003

ELECTRICAL FOREMAN

NESMA-EMCOR CO., LTD.

Alkhobar, Saudi Arabia

2002-2003 SAUDI ARAMCO RESEARCH & DEVELOPMENT CENTER PROJECT

Dahran, Saudi Arabia

2001-2002 MINISTRY OF DEFENSE & AVIATION

Riyadh Airbase-Royal Terminal Project

Riyadh, Saudi Arabia

2000-2001 NESMA VILLAGE HOUSING PROJECT

Alkhobar, Saudi Arabia

JOB DESCRIPTION:

> Working Foreman, prepare materials requirements and manpower distribution to their respective are of assignment.

> Ensure that approved IFC Drawings from Engineering are available prior for construction implementation. Direct supervision of all construction activities assigned to the group. Raise RFI

for completed activities and prepare Daily Productivity report.

15 Feb. 1988 to 15 Aug. 1998

ELECTRICAL GENERAL FOREMAN

ANGEL INTERIORS & CONSTRUCTION

C7-Vilante Drive, 15th Avenue, Quezon City, Philippines

JOB DESCRIPTION:

> Responsible for the implementation of electrical construction schedule as part of company’s contract

with client. See to it that the implementation of the program is in accordance with the approved IFC shop drawings and specifications as per contract agreement.

> Estimate and Materials take-off, number of manpower loading required, tools and equipment. Direct

supervision of construction activities and repositioning of project resources to fast track project completion.

Page 3 of 4 pages

22 Aug. 1983 to 27 Oct. 1989

SR. FIELD ELECTRICIAN

REPUBLIC OF THE PHILIPPINES

BUREAU OF TELECOMMUNICATION

A. Roces Avenue, Quezon City, Philippines

JOB DESCRIPTION:

> Responsible for the operation and maintenance of the Power Generating Plant. Repair and maintenance of Lighting system and General Power, Replacement of defective lighting fixtures and receptacle outlets. Fire Plant operation and maintenance of fire protection system.

> Cabling and termination, installation, repair and maintenance of telecommunications equipments in

13 regional offices nationwide.

TRAINING & SEMINARS ATTENDED

Diesel Mechanics

Conducted by Iloilo School of Arts and Trade- 1983

Iloilo City, Philippines

Military Science 43 (Leadership Strategy & Tactics)

Conducted by GHQ-Armed Forces of the Philippines, Quezon City – 1993

Quezon City, Philippines

High Voltage Cable Termination

Conducted by 3M Philippines – 2004

Pasong Tamo, Makati City, Philippines

Plant Safety and H2S Seminar

Conducted by Hyundai Engineering/Eni Gas/ABB & Snamprogetti - 2005

Western Libya Mellitah Gas Plant

Corrosion Control & Cathodic Protection System

Conducted by MESSAR -Rabigh Refining and Petro-Chemical – 2007

Rabigh, K S A

CHARACTER REFERENCE

MR. CESAR NERPIOL

Former General Manager/VP

Mohammad Al-Mojil Group

Page 4 of 4 pages



Contact this candidate